Preparation of Record Drawings Sample Clauses

The Preparation of Record Drawings clause requires the contractor or responsible party to create accurate, updated drawings that reflect all changes made during the construction process. These drawings, often referred to as "as-built" drawings, document modifications, additions, or deviations from the original design, ensuring that the final set of plans matches the completed project. By mandating the preparation of record drawings, this clause ensures that future maintenance, renovations, or repairs can be carried out efficiently and safely, as all stakeholders have access to precise and current project documentation.
Preparation of Record Drawings. The Engineer shall prepare a set of record drawings in accordance with the Engineering Guidelines for Professional Engineering Services and Development described in Section I.E.
Preparation of Record Drawings. Survey of As-Built conditions for the preparation of AutoCAD Record Drawing files.
Preparation of Record Drawings. When construction work has been completed and accepted by District, Consultant shall prepare with the design engineer the record drawings. The record drawings shall include CAD files and printed mylars. Consultant shall manage the Design Engineer’s performance on the record drawings and check the record drawings prior to transferring to District. The transfer to District shall be documented for record purposes. The drawings will become the property of District. Record drawings shall be provided to the District on full-size 24x36 mylars and CADD files (to be provided by EOR after the changes are incorporated).

Related to Preparation of Record Drawings

  • Record Drawings A final set of drawings prepared by the Architect that incorporates all changes from all As- Builts, sketches, details, and clarifications.

  • Selection of Architect/Construction Drawings Tenant shall retain -------------------------------------------- Gensler as the architect/space planner (the "Architect") to prepare the "Construction Drawings", as that term is defined in this Section 3.1. Tenant shall retain Landlord's engineering consultants (the "Engineers") to prepare all plans and engineering working drawings relating to the structural, mechanical, electrical, plumbing, HVAC, lifesafety, and sprinkler work in the Premises, which work is not part of the Base, Shell and Core work. The fees changed by the Engineers shall be comparable to the fees charged by comparable engineers performing comparable work in the Comparable Buildings. The plans and drawings to be prepared by Architect and the Engineers hereunder shall be known collectively as the "Construction Drawings." All Construction Drawings shall comply with Landlord's drawing format and specifications. Landlord's review of the Construction Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord's review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Construction Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord or Landlord's space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Construction Drawings, and Tenant's waiver and indemnity set forth in Section 10.1 of this Lease shall specifically apply to the Construction Drawings. Furthermore, Tenant and Architect shall verify, in the field, the dimensions and conditions as shown on the relevant portions of the Plans, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith.

  • Preparation of Agreement The parties acknowledge that they have sought and obtained whatever competent advice and counsel as was necessary for them to form a full and complete understanding of all rights and obligations herein and that the preparation of this Agreement has been their joint effort. The language agreed to herein expresses their mutual intent and the resulting document shall not, solely as a matter of judicial construction, be construed more severely against one of the parties than the other.

  • Application of Receipts Except as expressly stated to the contrary in any Finance Document, any moneys which the Facility Agent receives or recovers in its capacity as Facility Agent shall be applied by the Facility Agent in accordance with Clause 33.5 (Application of receipts; partial payments).

  • PREPARATION OF BIDS 12 LANGUAGE OF BID 12.1 The bid prepared by the bidder and all correspondences and documents relating to the bid exchanged by the bidder and the Employer shall be written in the English Language. Supporting documents and printed literature furnished by the bidder may be in another language provided they are accompanied by an appropriate translation of pertinent passages in the above stated language. For the purpose of interpretation of the bid, the English language shall prevail.