Preparation of Site. 9.1 In the event that the Services to be supplied by ABL to the Client include physical work to be carried out on premises or locations owned by the Client or under its access or control (the "Site"), any costs or expenses incurred in relation to the preparation of the Site shall be the responsibility of the Client. 9.2 The Client shall be deemed to have legal and operational control over the Site for the duration that the work is to be carried out by ABL. ABL shall not have or be deemed to have any legal or operational control over the Site and any member of ABL Group who may be present at the Site shall be there only in an advisory capacity. Should the presence of ABL’s Representatives be required on-board any Asset, legal and operational control over the Asset shall be deemed to be held by the Client at all times. 9.3 The Client shall make all arrangements and take all security measures to ensure that the Site is safe. The Client shall also carry out all required safety briefings and shall ensure that it is in compliance with all safety regulations, whether legal, statutory or otherwise. 9.4 In the event that the scope of the Services calls for any rig movement or towmaster or mooring master activity to be carried out, this shall be deemed to have ended upon the final positioning or berthing of the Asset at the place specified in the Engagement Letter, unless otherwise expressly agreed between the Parties. Any pre-loading operations shall be performed exclusively by the Client, owner or operator of the Asset, as the case may be.
Appears in 1 contract
Sources: Terms and Conditions of Engagement
Preparation of Site. 9.1 In the event that the Services to be supplied by ABL OOS89 to the Client include physical work to be carried out on premises or locations owned by the Client or under its access or control (the "Site"), any costs or expenses incurred in relation to the preparation of the Site shall be the responsibility of the Client.
9.2 The Client shall be deemed to have legal and operational control over the Site for the duration that the work is to be carried out by ABLOOS89. ABL OOS89 shall not have or be deemed to have any legal or operational control over the Site and any member of ABL Group OOS89 who may be present at the Site shall be there only in an advisory capacity. Should the presence of ABLOOS89’s Representatives be required on-board any Asset, legal and operational control over the Asset shall be deemed to be held by the Client at all times.
9.3 The Client shall make all arrangements and take all security measures to ensure that the Site is safe. The Client shall also carry out all required safety briefings and shall ensure that it is in compliance with all safety regulations, whether legal, statutory or otherwise.
9.4 In the event that the scope of the Services calls for any rig movement or towmaster or mooring master activity to be carried out, this shall be deemed to have ended upon the final positioning or berthing of the Asset at the place specified in the Engagement Letter, unless otherwise expressly agreed in writing between the Parties. Any pre-loading operations shall be performed exclusively by the Client, owner or operator of the Asset, as the case may be.