PRODUCTION AND TESTING Clause Samples

PRODUCTION AND TESTING. The production and testing of the products are carried out according to execution documents and test instructions, from which the status of production, the identity as well as the executed tests and their results can be seen. The supplier shall ensure that the production of the products is carried out using work equipment and processes which guarantee the production of products of an impeccable quality. When manufacturing and handling electronic assemblies and parts, an ESD protection corresponding to the generally applicable guidelines (according to IEC 61340 or ANSI/ESD 20.20) must be implemented. Employees must be trained regularly in accordance with these guidelines. 10. SCHÄDEN DURCH FREMDKÖRPER Bei Artikeln, insbesondere Bauteilen und Baugruppen, die für Fremdkörperschäden anfällig sind, muss der Lieferant sicherstellen, dass die Artikel frei von Fremdkörpern und Fremdkörperschäden sind, die durch Verarbeitung, Montage oder Verpackung entstehen. 10. FOREIGN OBJECT DAMAGE (FOD) For articles, particularly components and assemblies susceptible to foreign object damage, the supplier shall ensure articles are free from foreign objects and foreign object damage resulting from processing, assembly or packing operations.
PRODUCTION AND TESTING. The vaccines shall be produced and tested in conformity with the at all times current requirements of national legislation of the country of manufacture and the following recommendations established by the World Health Organization (WHO), or any subsequent revisions.
PRODUCTION AND TESTING. In addition to the demands on Quality Management according to the Guideline of Germanischer ▇▇▇▇▇, the requirements in the rotor blade specification must be followed. The following lists the major tooling and equipment requirements of a blade manufacturing facility. These tools and equipment represent a minimum standard, necessary to ensure the final quality of the project and the health and safety requirements of the workers. This list is by no means complete. Numerous additional smaller tools are required and should be considered to successfully produce a blade – those listed are capital intensive resources. In all cases, tools and facilities should be chosen/developed to meet local environmental health and safety regulations and ensure the interests of workers are maintained. The list is separated in tools and equipment which are designed and specified by aerodyn in detail and those for which aerodyn does not give a detailed specification.
PRODUCTION AND TESTING. The manufacturers shall ensure that only recognized and approved production processes are used and that the conditions defined as a basis for the recognition and approval are observed. All workshops, store-rooms and their operational equipment shall meet the requirements of the relevant safety authorities and employers’ liability insurance associations. The responsibility for compliance with these requirements is solely the company’s. Annex 12 License Agreement for SCD (2008-07-28) The danger of contamination of materials for laminating shall as a rule be kept to a minimum by rigorous separation of production areas and other workshops as well as store-rooms. Only the quantity of materials required for production within the next two days shall be stored in the laminating workshops. Whilst laminating and gluing is progressing, dust-generating machinery may be operated in the laminating workshop only to a limited extent and only if fitted with a dust collection unit. Painting or spraying work is only permissible within the laminating workshop if the company can ensure that such activities will not affect the laminating quality. Laminating resin compounds and adhesives shall be stored according to the manufacturer’s instructions. The temperature in the store-rooms shall be recorded continuously. Annex 12 License Agreement for SCD (2008-07-28)

Related to PRODUCTION AND TESTING

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Inspection and Tests 3.8.1 The Procuring entity or its representative shall have the right to inspect and/or to test the goods to confirm their conformity to the Contract specifications. The Procuring entity shall notify the tenderer in writing in a timely manner, of the identity of any representatives retained for these purposes. 3.8.2 The inspections and tests may be conducted in the premises of the tenderer or its subcontractor(s), at point of delivery, and/or at the Goods’ final destination If conducted on the premises of the tenderer or its subcontractor(s), all reasonable facilities and assistance, including access to drawings and production data, shall be furnished to the inspectors at no charge to the Procuring entity. 3.8.3 Should any inspected or tested goods fail to conform to the Specifications, the Procuring entity may reject the equipment, and the tenderer shall either replace the rejected equipment or make alterations necessary to make specification requirements free of costs to the Procuring entity. 3.8.4 The Procuring entity’s right to inspect, test and where necessary, reject the goods after the Goods’ arrival shall in no way be limited or waived by reason of the equipment having previously been inspected, tested and passed by the Procuring entity or its representative prior to the equipment delivery. 3.8.5 Nothing in paragraph 3.8 shall in any way release the tenderer from any warranty or other obligations under this Contract.

  • Audit and Testing 4.1 The Contractor shall conduct tests of the processes and countermeasures contained in the Security Plan ("Security Tests") on an annual basis or as otherwise agreed by the Parties. The date, timing, content and conduct of such Security Tests shall be agreed in advance with the Authority. 4.2 The Authority shall be entitled to send a representative to witness the conduct of the Security Tests. The Contractor shall provide the Authority with the results of such tests (in a form approved by the Authority in advance) as soon as practicable after completion of each Security Test. 4.3 Without prejudice to any other right of audit or access granted to the Authority pursuant to this Contract, the Authority shall be entitled at any time and without giving notice to the Contractor to carry out such tests (including penetration tests) as it may deem necessary in relation to the Security Plan and the Contractor's compliance with and implementation of the Security Plan. The Authority may notify the Contractor of the results of such tests after completion of each such test. Security Tests shall be designed and implemented so as to minimise the impact on the delivery Services. If such tests impact adversely on its ability to deliver the Services to the agreed Service Levels, the Contractor shall be granted relief against any resultant under-performance for the period of the tests. 4.4 Where any Security Test carried out pursuant to paragraphs 4.2 or 4.3 above reveals any actual or potential security failure or weaknesses, the Contractor shall promptly notify the Authority of any changes to the Security Plan (and the implementation thereof) which the Contractor proposes to make in order to correct such failure or weakness. Subject to the Authority's approval in accordance with paragraph 3.12, the Contractor shall implement such changes to the Security Plan in accordance with the timetable agreed with the Authority or, otherwise, as soon as reasonably possible. For the avoidance of doubt, where the change to the Security Plan to address a non-compliance with the Security Policy or security requirements, the change to the Security Plan shall be at no additional cost to the Authority. For the purposes of this paragraph 4, a weakness means a vulnerability in security and a potential security failure means a possible breach of the Security Plan or security requirements.

  • Inspections and Tests 26.1 The Supplier shall at its own expense and at no cost to the Procuring Entity carry out all such tests and/or inspections of the Goods and Related Services as are specified in the SCC. 26.2 The inspections and tests may be conducted on the premises of the Supplier or its Subcontractor, at point of delivery, and/or at the Goods' final destination, or in another place in Kenya as specified in the SCC. Subject to GCC Sub-Clause 26.3, if conducted on the premises of the Supplier or its Subcontractor, all reasonable facilities and assistance, including access to drawings and production data, shall be furnished to the inspectors at no charge to the Procuring Entity. 26.3 The Procuring Entity or its designated representative shall be entitled to attend the tests and/or inspections referred to in GCC Sub-Clause 26.2, provided that the Procuring Entity bear all of its own costs and expenses incurred in connection with such attendance including, but not limited to, all travelling and board and lodging expenses. 26.4 Whenever the Supplier is ready to carry out any such test and inspection, it shall give a reasonable advance notice, including the place and time, to the Procuring Entity. The Supplier shall obtain from any relevant third party or manufacturer any necessary permission or consent to enable the Procuring Entity or its designated representative to attend the test and/or inspection. 26.5 The Procuring Entity may require the Supplier to carry out any test and/or inspection not required by the Contract but deemed necessary to verify that the characteristics and performance of the Goods comply with the technical specifications codes and standards under the Contract, provided that the Supplier's reasonable costs and expenses incurred in the carrying out of such test and/or inspection shall be added to the Contract Price. Further, if such test and/or inspection impedes the progress of manufacturing and/or the Supplier's performance of its other obligations under the Contract, due allowance will be made in respect of the Delivery Dates and Completion Dates and the other obligations so affected. 26.6 The Supplier shall provide the Procuring Entity with a report of the results of any such test and/or inspection. 26.7 The Procuring Entity may reject any Goods or any part thereof that fail to pass any test and/or inspection or do not conform to the specifications. The Supplier shall either rectify or replace such rejected Goods or parts thereof or make alterations necessary to meet the specifications at no cost to the Procuring Entity, and shall repeat the test and/or inspection, at no cost to the Procuring Entity, upon giving a notice pursuant to GCC Sub- Clause 26.4. 26.8 The Supplier agrees that neither the execution of a test and/or inspection of the Goods or any part thereof, nor the attendance by the Procuring Entity or its representative, nor the issue of any report pursuant to GCC Sub-Clause 26.6, shall release the Supplier from any warranties or other obligations under the Contract.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).