Project Dependencies Clause Samples

Project Dependencies. 2.2 Third Party Technology and Open Source Software; 2.3 SOW Deliverables; 3. Project Schedule; 4. Change Control and Support Requirements; 4.1 Change Control; 4.2 Support Requirements; 5. Project Organization & Staffing; 5.1 Contact Information; 5.2 Staffing Requirements; 6. Additional Terms; 6.1 IP Ownership; 6.2 Special Licensing; 6.3
Project Dependencies. Itemized list of information, technology, documentation and materials required to complete Project
Project Dependencies. If approval is received for both the 2nd camera installation at Interstate 75 and the camera system at Station 4, the system at Interstate 75 will take precedence over Station 4, and would delay initiation of the Station 4 project while contractor is onsite at the Interstate location. Any delay in receiving the local permitting for installing conduit under the roadway would delay installation of the camera system at Station 4.
Project Dependencies. Client will assign a project leader who will lead the project at the Client’s site and be the main point of contact for Ellucian throughout the implementation.
Project Dependencies. County Provided (A) This Work Order is approved no later than June 7, 2019. (B) County will ensure that Atos will provide SAIC with all required system access to allow SAIC to perform the Services herein.
Project Dependencies. County Provided (A) The necessary hardware will be available to Supplier by County as required for Supplier to perform the Services described for Phase 3 in Section 12 above. (B) All required access is provided to Supplier to on 8/31/2019. (C) A-C commences the planned move on 9/19/2019 (not before).

Related to Project Dependencies

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • Project Completion The Contractor agrees to schedule a final job walk with the County. If required, the County will prepare a list of incomplete items, the “Punch List”. The Contractor agrees to complete the “Punch List” corrections and schedule a final project completion job walk. The County will sign the “Punch List” as completed when determined, the project is finished. The Contractor agrees to submit the following along with its final payment request:

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall: • provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring; • perform all terminations; and • supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.