PROJECT MODEL Clause Samples

The Project Model clause defines the overall framework and structure for how a project will be organized and executed. It typically outlines the roles and responsibilities of the parties involved, the phases or stages of the project, and the key deliverables or milestones to be achieved. For example, it may specify whether the project will follow a design-build, design-bid-build, or another project delivery method. The core practical function of this clause is to establish a clear and agreed-upon approach to managing the project, thereby reducing misunderstandings and ensuring all parties are aligned on expectations and processes.
PROJECT MODEL. The provisions of Schedule 5.3 (The Project Model) shall apply in respect of the operation and maintenance of the Project Model.
PROJECT MODEL. The Project Model, to the Knowledge of the Company, is based upon reasonable assumptions in light of the conditions existing at the time of delivery.
PROJECT MODEL. The Project Model will be supplied on software media that contains the PEP-based input data for ICARUS 2000 and ICARUS Process Evaluator (IPE) for a specific process that will enable the customer who is a user of ICARUS 2000 and/or ICARUS Process Evaluator (IPE) to prepare certain project information (cost estimate, schedule of engineering and construction) for the particular process. There may also be a Project Model offering that includes a license of ICARUS 2000.
PROJECT MODEL. The Guarantor shall have received a financial model from the Sponsor, substantially in the form of Exhibit H hereto, produced in good faith and consistent with the financial model used by the Rating Agency in connection with the rating of the Guaranteed Loans showing for each planned Guarantee, in an unstressed base case: (i) that no claims on any Guarantee Issuance Agreement shall be needed assuming a loss multiple of not less than 1.8, (ii) full repayment of the each Guaranteed Loan two years prior to the maturity date of the Solar Loan with the latest maturity which is part of the Collateral or, if there is no Anticipated Repayment Date, one and a half years prior to the legal final maturity of the relevant ABS Notes and (iii) such model reflects (x) an Equipment Replacement Reserve Deposit no less than the Minimum Equipment Replacement Reserve Deposit and (y) an Equipment Replacement Reserve Required Balance no less than the Minimum Equipment Replacement Reserve Required Balance (“Project Model”).
PROJECT MODEL. The Project has prepared a Project Model for analysis of the Project. The Project Model is calculated before the effects of project financing and tax, using the following assumptions: •Base Discount Rate (nominal) 9.0 % •Long- Term General Inflation CPI 2.5 % •Long-Term Metal Price Assumption (Nominal Terms - 2013) 2,248 •Alumina Price Assumption (% LME) 13.5 % •Credit Terms - Receivables (days) 30 •Payment Terms - Payables (days) 60 •Days of Inventory (days of cash cost) 15 Operating cash costs are calculated for the first year of full production as: •Mine and Refinery (USD/tonne) 146 •Smelter (USD/tonne) 1,244 •Rolling Mill (USD/tonne excluding metal) 257 The results of the financial modeling are summarized below: Smelter and Infrastructure(1) 4,706 14.0 % 3,450 Rolling Mill 2,145 8.8 % (61 ) Notes: (1) Includes Casthouse $400M and Infrastructure $460M (2) Based on AP37 technology, AP39 in 2020
PROJECT MODEL. The project model dated February 11, 2013, furnished by the Seller and the Company to Buyer relating to the Business was made in good faith and represents a true, correct, and complete copy of the latest economic model for the Company and the Business.
PROJECT MODEL. (A) The Facility Agents, the Technical and Modelling Bank and Kosmos may each make proposals with regard to amendments to the Project Model which it believes in good faith are required for the purpose of: (i) correcting any manifest error in the form or structure of the Project Model; or (ii) incorporating any additional assumptions required to determine the matters referred to in clause 19.1 (Forecast Procedures). (B) If the Facility Agents, Technical and Modelling Bank and Kosmos are unable to agree on the required changes to the Project Model within 15 Business Days from the date on which such changes were proposed, then the matter shall, on the request of Kosmos or the Technical and Modelling Bank, or on the initiation of either of the Facility Agents, be referred for resolution to an appropriate expert appointed by the Facility Agents (being a person having appropriate expertise with respect to, but no interest in, the outcome of the matter referred to it). (C) The costs of any references to an expert and the costs, if any, incurred in giving effect to any agreed revision to the Project Model will be borne by Kosmos except, in the case of the costs of any reference to an expert only, if the expert determines that any proposal by the Technical and Modelling Bank or either Facility Agent in respect of the changes to the Project Model which are in dispute could not be regarded as reasonable and are rejected by such expert, in which case such costs shall be borne by the Lenders. (D) Any amendments to the Project Model will not be made until such time as such amendment has been agreed or determined (as appropriate) pursuant to paragraphs (A) and (B) above. Prior to such amendment being incorporated into the Project Model, the Project Model will continue to be utilised without such amendment. (E) Where the manner of determining any of the calculations required for a Forecast is amended as a consequence of any amendments made to the Project Model, the Finance Documents shall be deemed to be amended to reflect any such amendment.

Related to PROJECT MODEL

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Design Development Phase 1.3.1 Based on the approved Schematic Design Documents, model(s) and any adjustments to the Program of Requirements, BIM Execution Plan or Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Design Development Documents derived from the model(s) in accordance with Owner’s written requirements to further define and finalize the size and character of the Project in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review the Design Development documents as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Design Development. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.3.2 As a part of Design Development Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.3.3 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.3.4 Before proceeding into the Construction Document Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Design Development documents and approval of the mutually established Amount Available for the Construction Contract and schedule. 1.3.5 The Architect/Engineer shall prepare presentation materials including an animation derived from the model(s) as defined in “Facility Design Guidelines” at completion of Design Development and if so requested shall present same to the Board of Regents at a regular meeting where scheduled within the state. 1.3.6 The Architect/Engineer shall prepare preliminary recommended furniture layouts for all spaces where it is deemed important to substantiate the fulfillment of program space requirements, or to coordinate with specific architectural, mechanical and electrical elements. 1.3.7 Architect/Engineer shall assist the Owner, if requested, with seeking approval of the Project by the Texas Higher Education Coordinating Board (THECB). Such assistance shall include (i) the preparation of a listing of the rooms and square footages in the Project, and (ii) the preparation of project cost information, in accordance with THECB Guidelines. This information shall be provided at the completion of the Design Development Phase when requested by the Owner. The listing of rooms and square footages shall then be updated to reflect any changes occurring during construction and provided to the Owner at Substantial Completion. 1.3.8 At the completion of the Design Development Phase, or such other time as Owner may specify to Architect/Engineer, at Owner’s sole option and discretion, Owner will furnish Architect/Engineer with a Guaranteed Maximum Price proposal prepared by Construction Manager based upon the Design Development documents prepared by the Architect/Engineer and approved by the Owner. The Architect/Engineer shall assist the Owner and endeavor to further and advocate the Owner’s interests in Owner’s communications with the Construction Manager in an effort to develop a Guaranteed Maximum Price proposal acceptable to Owner, in Owner’s sole option and discretion. If the Owner does not accept the Construction Manager’s Guaranteed Maximum Price proposal, the Architect/Engineer shall participate with the Owner and Construction Manager in constructability reviews and shall revise the documents as necessary in order to reach an agreement. If the Construction Manager’s Guaranteed Maximum Price proposal exceeds the Schematic Design Phase Estimated Construction Cost prepared by, or otherwise accepted by the Construction Manager due to an increase in the scope of the Project caused by further development of the design documents by the Architect/Engineer to the extent that such could not be reasonably inferred by the Construction Manager from the Schematic Design documents, and Owner directs Architect/Engineer to revise the documents, the Architect/Engineer shall revise the documents at its own expense so that the Guaranteed Maximum Price proposal for constructing the Project shall not exceed the Owner’s Amount Available for the Construction Contract and any previously approved Estimated Construction Costs. If it is determined to be in the Owner’s best interest, instead of requiring the Architect/Engineer to revise the Drawings and Specifications, the Owner reserves the right to accept a Guaranteed Maximum Price proposal that exceeds the stipulated Amount Available for the Construction Contract. The Architect/Engineer shall analyze the final Guaranteed Maximum Price proposal document, together with its supporting assumptions, clarifications, and contingencies, and shall submit a detailed written analysis of the document to the Owner. Such analysis shall include, without limitation, reference to and explanation of any inaccurate or improper assumptions and clarifications. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the Owner’s rejection of the Guaranteed Maximum Price proposal is not due to a failure of the A/E to provide the services otherwise required herein. 1.3.9 After the Guaranteed Maximum Price has been accepted, the Architect/Engineer shall incorporate necessary revisions into the Design Development documents. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the revisions are required as the result of inaccurate assumptions and clarifications made in the development of the Guaranteed Maximum Price proposal that are not due to a failure of the A/E to provide the services otherwise required herein.

  • Project Implementation The Borrower shall:

  • Project Monitoring The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.