Project Occupancy Sample Clauses

Project Occupancy. EXPOSURE SCENARIOS Three separate population groups are of interest when quantifying health risks following completion of the project: on-site residents, on-site workers, and off-site residents. Site emissions estimates will assume the re-establishment of a cap throughout the refuse fill areas, with adjustments for cap-penetrating structures such as pilings or other cap design changes. Construction on the site will lead to the establishment of very low permeability surface features such as asphalt parking lots, streets, and buildings that would tend to reduce emissions. However, this assessment conservatively assumes no emission reductions as a result of these features. It is assumed that gases obstructed by such features will migrate to a location where they will diffuse through the cap or be vented U.S. Environmental Protection Agency (US EPA), 1989. Air/Superfund National Technical Guidance Study Series, Volume II - Estimation of Baseline Air Emissions, at Superfund Sites, Interim Final. Office of Air Quality Planning and Standards. Research Triangle Park, NC. January. Versar Inc., 1979. Water-related environmental fate of 129 priority pollutants. Volume I. USEPA-440/4-79-029a. Verschueren, K., 1977. Handbook of Environmental Data on Organic Chemicals. Van Nost▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇., New York. Wood, ▇.▇. ▇▇▇ M.L. ▇▇▇▇▇▇, ▇▇87. Hazardous Waste Management. Hazardous Pollutants in Class II Landfills, Journal of the Air Pollution Control Association, Volume 37, No. ▇, ▇▇▇. ▇▇▇▇▇▇▇▇-▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇, 1988. Final Environmental Impact Report, Westport Development, Redwood City, California. November. Young, F.A., 1987. Risk Assessment: The Convergence of Science and the Law. Regul. ToxicI. Pharmacol. 7:179-184. 227
Project Occupancy. ‌ 5.6.1 Occupancy levels for the Projects will be dictated by Permitted Resident demand alone. The BOR makes no guarantee or agreement as to minimum enrollment numbers at any Institution, minimum occupancy levels for the Projects or any one of the Projects or any portion of any Project, or minimum levels of Gross Revenue to be generated by the Projects. The Concessionaire has evaluated the demand for, and the financial prospects of, each Existing Housing Project and each New Housing Project, utilizing its resources and expertise. The BOR makes no representations with respect to potential or projected demand for any Project and expressly disclaims responsibility for the conclusions of any demand studies obtained by the Concessionaire, even if procured, commissioned or approved by the BOR. 5.6.2 The BOR will not guarantee the continued operation, or continued separate operation, of any Institution. The Concessionaire shall bear all risk of the closure of any Institution or consolidation of any Institution resulting in a campus closure and the BOR shall not be liable for or obligated to reimburse the Concessionaire for any losses, costs or expenses, whether direct or indirect, that result from or are otherwise associated with such closure or consolidation. The BOR maintains the right to terminate the continued operation, or continued separate operation, of any Institution during the Term, and the BOR shall not be liable to the Concessionaire for any amounts whatsoever upon the closure of an Institution or consolidation of an Institution resulting in a campus closure during the Term. Without limiting the foregoing, neither the closure of an Institution or consolidation of an Institution resulting in a campus closure nor any other action undertaken by the BOR in connection with the closure of an Institution or consolidation of an Institution resulting in a campus closure shall be deemed to be a termination pursuant to Section 2.3 of this Agreement. 5.6.3 If the BOR elects to close any Institution or consolidate any Institution in a manner that results in a campus closure during the Term, the Concessionaire shall have the option to either (a) terminate the applicable Lease or Leases, which shall cause all of the Concessionaire’s interest in the Project or Projects on such Institution’s campus to revert to the BOR, or (b) continue to lease the Project or Projects on such Institution’s campus under the applicable Lease or Leases, with the Base Rent due to the BOR ...
Project Occupancy. The Developer may cause the building to be occupied up to six (6) months without having to comply with fire flow standards provided that Developer has posted fiscal for the extension of the Phase 2 waterline from CR 269 to the eastern edge of the Property. One (1) month prior to the expiration of the six (6) month occupancy period, the City, may extend the occupancy period in three (3) month increments if the extension of the Phase 1 waterline from FM 2243 to Hero Way is delayed by the City. The City may grant additional occupancy periods if needed.
Project Occupancy. The percent of the project space that is leased and occupied based on the percent of net square feet and excludes hotel occupancy. Parking Limits. The maximum number of parking spaces that can be allocated for employee parking.
Project Occupancy 

Related to Project Occupancy

  • Maximum Occupancy No more than two (2) guests per one (1) resident (who is present) are permitted in a student room/suite/apartment at any given time unless otherwise approved by the University (Residential Life).

  • Occupancy The Assuming Institution shall give the Receiver fifteen (15) days' prior written notice of its intention to vacate prior to vacating any leased Bank Premises with respect to which the Assuming Institution has not exercised the option provided in Section 4.6(b). Any such notice shall be deemed to terminate the Assuming Institution's option with respect to such leased Bank Premises.

  • Early Occupancy If Tenant occupies the Property prior to the Commencement Date, Tenant's occupancy of the Property shall be subject to all of the provisions of this Lease. Early occupancy of the Property shall not advance the expiration date of this Lease. Tenant shall pay Base Rent and all other charges specified in this Lease for the early occupancy period.

  • Certificate of Occupancy The Contractor’s obligation under the Contract is to install the Work in accordance with the Contract Documents, obtain the Certificate of Occupancy from the State Fire Marshal or his deputy, and forward it to the Design Professional as a part of the final close out procedures. The Design Professional’s obligation is to design the Work to comply with the applicable codes and to qualify for a Certificate of Occupancy.

  • Possession and Occupancy The Seller will deliver possession and occupancy of the Property to the Buyer at Closing. The Seller shall provide access to all locks, including keys, remote controls, and any security/access codes, necessary to operate all locks, mailboxes, and security systems.