Project Understanding Clause Samples

POPULAR SAMPLE Copied 5 times
Project Understanding. Upon request from the CONSULTANT, CITY may provide all criteria and full information as to CITY's and CONSULTANT'S requirements for this part of the project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expendability, and any budgetary limitations. CONSULTANT may request from the CITY to furnish data, reports, surveys, and other materials that may be relied upon in performing CONSULTANT'S services. DRAFT Authorized representatives of the CITY may at all reasonable times review and inspect the project activities and data collected under the Agreement and amendments thereto. All reports, drawings, studies, specifications, estimates, maps and computation prepared by or for the CITY in association with this Agreement shall be subject to review. The CITY may at any time request progress reports, prints or copies of any work performed under this Agreement. Refusal by the CONSULTANT to submit progress reports and/or plans shall be cause to withhold payment to the CONSULTANT until the CONSULTANT complies with the CITY’s request in the regard. The CITY’s review recommendations shall be incorporated into the plans by the CONSULTANT.
Project Understanding. It is RK’s understanding that the project will consist of Entrance Ramp Improvements Our proposed scope of services and estimated item quantities are based upon our interpretation of the Permit Set drawings dated May 2023. The scope and quantity of the “on-call” services provided will be dependent upon services actually required by CLIENT, CLIENT’S representatives, the design team, and/or the General Contractor and/or its Subcontractors. All services authorized or requested by you, your representatives, the design team, and/or the General Contractor and/or its subcontractors in excess of the quantities of observation and testing services shown herein will be charged at the appropriate unit rate for such services. Charges will be invoiced on a monthly basis and will show a computerized composite total of services rendered for each service category. The scope of work includes the observation and testing of the following construction materials: • Soil sampling of existing soils for Entrance Ramp Subgrade/Fill, Fast Track Concrete Paving Subgrade/Fill, and Retaining Walls • Field compaction testing soils for Entrance Ramp Subgrade/Fill, Fast Track Concrete Paving Subgrade/Fill, and Retaining Walls • Concrete sampling Cylinders for Entrance Ramp Paving and Fast Track Paving • Laboratory testing of soil materials such as moisture-density relationships (▇▇▇▇▇▇▇), ▇▇▇▇▇▇▇▇▇ Limits (PI), sieve analysis thru No. 200, lime determination and compressive strength testing of concrete, cement sand, mortar and grout test specimens, and • Project management, data processing and report review services of laboratory and field test reports. Proposal No. PHD24-051-00 2 March 8, 2024 We appreciate the opportunity of submitting this proposal and look forward to working with you in the development of this project, which will be carried out accordance with this letter and the following attachments: Attachment Description I Standard Terms and Conditions II Cost Breakdown III Project Data Sheet Please return one signed original of this contract to provide written authorization for our firm to commence work on the services outlined herein. Our invoices are due and payable upon receipt at P.O. Box 971037, Dallas, Dallas County, Texas 75397-1037. Charges will be invoiced on a monthly basis and will show a computerized composite total of services rendered for each service category. Copies Submitted: Above (1) (Accepted By) (Type or Printed Name) (Title) (Date) Proposal No. PHD24-051-00 ...
Project Understanding. This project consists of complete and selective demolition of the existing Wastewater Treatment Plant's Biotower, Maintenance Building, and Chlorine Contact Tank. Based on our review of the approved plans and specifications, as well as our brief conversation, we understand that construction inspection and testing services will be required during construction. Construction Activity Earthwork Related Services Estimated Costs $6,170.20 Compaction Testing for Asphalt Concrete Pavements $2,041.40 Special Inspection and Testing of Lightweight Cellular Concrete and Civil Site Concrete Special Inspection of Structural Wood $6,451.20 $498.20 Special Inspection of Post Installed Anchors $1,236.40 TOTAL $16,397.40 Building Confidence from the Ground Up ▇▇▇.▇▇▇▇▇▇▇-▇▇▇.▇▇▇ ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ We propose to perform the previously described services on a time and materials (hourly or test rate) basis, unless noted, in accordance with the Schedule of Fees. Our estimate may vary due to circumstances that may develop during the course of the work or due to extended construction duration. If a change in the scope of work becomes necessary due to unforeseen conditions, which will increase the charges, we will obtain your authorization. In-Place Density Tech - Soils 40 HR $105.00 $4,200.00 Field Technician - Sample Pick Up 4 HR $100.00 $400.00 Project Manager 4 HR $140.00 $560.00 Administrative 4 HR $80.00 $320.00 Moisture Density (▇▇▇▇▇▇▇) w/ Sieve 1 EA $290.00 $290.00 Sand Equivalent 1 EA $100.00 $100.00 Percent Fracture 1 EA $100.00 $100.00 Trip Charge 11 EA $18.20 $200.20 Subtotal: $6,170.20 In-Place Density Tech - Asphalt 8 HR $105.00 $840.00 Field Technician - Sample Pick Up 3 HR $100.00 $300.00 Project Manager 2 HR $140.00 $280.00 Administrative 2 HR $80.00 $160.00 Asphalt Content & Gradation (Ignition) 1 EA $305.00 $305.00 Maximum Specific Gravity (Rice Density) 1 EA $120.00 $120.00 Trip Charge 2 EA $18.20 $36.40 Subtotal: $2,041.40 Concrete Inspector 32 HR $95.00 $3,040.00 Field Technician - Sample Pick Up 8 HR $100.00 $800.00 Project Manager 4 HR $140.00 $560.00 Administrative 2 HR $80.00 $160.00 Compressive Strength - Concrete 40 EA $40.00 $1,600.00 Trip Charge 16 EA $18.20 $291.20 Subtotal: $6,451.20 Structural Wood Inspector 4 HR $100.00 $400.00 Administrative 1 HR $80.00 $80.00 Trip Charge 1 EA $18.20 $18.20 Subtotal: $498.20 Post-Installed Anchors Inspector 8 HR $95.00 $760.00 Project Manager 2 HR $140.00 $280.00 Administrative 2 HR $80.00 $160.00 Trip Charge ...
Project Understanding. The purpose of this study is to design plans for the traffic signalization for the intersection of ▇▇▇▇▇▇ Road and Reading Road. The design includes peak hour traffic counts, traffic signal design, Synchro analysis, and general intersection lane marking recommendations.
Project Understanding. Introduction
Project Understanding. The Bay-Lake Regional Planning Commission (“Commission”) prepared this Scope of Services for the Sheboygan Urbanized Area. This Scope of Services outlines the proposed work program, timeline, and costs to update the Sheboygan Urbanized Area Sewer Service Plan.
Project Understanding. Wilco has expressed concerns over the existing chilled water system operation and has requested ▇▇▇▇▇▇▇ ▇▇▇▇▇ Engineering, LLC (RSE) to perform an evaluation of the system. The goal of this evaluation is to review design flows and balancing requirements to determine if current conditions are suitable/acceptable. In addition, RSE shall provide recommendations to remediate any existing mechanical issues found as well as to optimize system efficiency. This is for the three air cooled chillers located on the roof of the North side of the Williamson County Jail. The secondary pumps are located below on the fourth floor. No evaluation will be performed on the two air cooled chillers, installed at grade along Rock Street, as there was no indication of issues with that system.
Project Understanding. This project is understood to be the replacement of one (1) hydraulic elevator. The project delivery system is understood to be Design−Bid. Our mechanical and electrical engineering services for this project will consist of the following. Services not indicated below are considered outside of our basic scope and will be provided upon request as an additional service. It is our understanding that the design of this project will include four (4) deliverables as defined below. The design duration for this project is estimated to be six (6) weeks (not including owner review).
Project Understanding. ▇▇▇▇▇▇-▇▇▇▇ will provide general civil engineering consulting services, development review and general On-Call project services on an as-needed basis as authorized by the City Manager or his Designee (if applicable).
Project Understanding. Our understanding of the Environmental Review for the Marinwood Plaza Project includes the following:  BRIDGE Housing Corporation, on behalf of the property owner, Marinwood Plaza, LLC, has submitted applications for a Master Plan, Precise Development Plan, Lot Line Adjustment, Lot Merger, and Right of Way Abandonment for the Marinwood Plaza site at ▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇ ▇▇▇▇▇▇. The approximately 5-acre Project site is just west of US 101 at the Marinwood exit, and currently consists of four separate lots. Existing development on the site includes a 33,514 square foot commercial building, a wireless facility, parking lot, utilities, and landscaping. The commercial building is occupied by the Marinwood Market and a liquor store. The Marinwood ▇▇▇▇▇▇’▇ Market operates on the site on a weekly basis throughout the year. The property is zoned CP (Planned Commercial) and the Countywide Plan Designation is GC HOD (General Commercial/Mixed Use with Housing Overlay District).  The applicant proposes to demolish about half of the existing commercial building and retain the remainder as the Marinwood Market. The existing liquor store would be relocated on site. The existing ▇▇▇▇▇▇’▇ Market is not included in the proposal and would be discontinued. The applicant would redevelop the site with residential, commercial, and mixed use buildings. The total building area proposed is 89,822 square feet, consisting of commercial space, market rate apartments, affordable apartments, landscaping and public open space amenities. A total of 82 housing units are proposed, and the new development would have a floor area ratio (FAR) of 0.41, compared to the current FAR of 0.15.  The Project site is identified in the Marin County Housing Element as a potential affordable housing site. The Housing Element Draft 1. Approach and Work Program Supplemental EIR (DSEIR) includes the Project site in its screening- level review of potential impacts.  Consistency of the Project with the Countywide Plan and the Housing Element has already been vetted and confirmed, but the environmental document should reexamine and reaffirm this conclusion. There are few identified sensitive resources on the Project site. The environmental issues that require the greatest scrutiny to determine environmental effects are traffic, air quality, health risk from future residents’ exposure to toxic air contaminants, climate-altering effects of greenhouse gas emissions; soil contamination; and potential impact...