Proposed Scope of Work Clause Samples

The Proposed Scope of Work clause defines the specific tasks, deliverables, and responsibilities that a contractor or service provider is expected to perform under an agreement. It typically outlines the nature and extent of the work, including timelines, milestones, and any relevant standards or requirements. By clearly delineating what is and is not included in the project, this clause helps prevent misunderstandings and disputes, ensuring that both parties have a shared understanding of their obligations.
Proposed Scope of Work. The following scope of our field investigation will be carried out to verify conditions at the site of the proposed construction after initial site preparation and site work: • Monitoring and compaction testing using nuclear density equipment for stabilized paving subgrade and asphalt pavements. • Concrete testing and monitoring for the proposed paving and all new concrete sections. • Asphalt compaction of black base and Type D including laboratory testing. • Professional Engineer review on the field testing reports and documentation.
Proposed Scope of Work. The proposed scope of work for the ▇▇▇▇▇ ▇▇▇▇ investment-grade T&R study is outlined below and consists of 12 tasks.
Proposed Scope of Work. The following scope of field services will be carried out to verify conditions at the site of the proposed construction: • Proof Roll observations for the building pad and on the new paving subgrade areas. • Nuclear density tests will be performed on select fill, general fill, paving subgrade and utility backfill. • Concrete testing will be completed for proposed spread footings, grade beams, drilled piers, building pad, parking area, columns, shear walls, dumpster pad, swimming pool and sidewalks. • Structural Steel inspections will be completed for the required steel connections on the walls, ceiling structure and canopies.
Proposed Scope of Work. This work is an extension of the Development Batch - Inquiry No. 807836c Currently, [ * ] of [ * ] intermediate [ * ] ([ * ]) was prepared and [ * ] shipped to GTx for development work. This proposal consists of splitting the [ * ] into [ * ], synthesis of [ * ], synthesis of [ * ], an additional shipment to GTx Inc., and process development work for [ * ] This proposal does not include final release testing. 1) [ * ]. [ * ] of [ * ] will be used to synthesis [ * ]. The scope includes starting from [ * ] of [ * ] and performing [ * ] to synthesis [ * ] using the best technology available, non-GMP. [ * ] of [ * ] will be shipped to GTx Inc., the remainder will be used in [ * ]. [ * ] will be performed under GMP conditions to yield [ * ]. The targeted amount is [ * ] of [ * ]. [ * ] will require dedicated glassware, estimated to be [ * ]. 2) [ * ]. [ * ] of [ * ] will be used to synthesize [ * ]. Starting with [ * ] of [ * ] should yield approx [ * ] of [ * ] ([ * ] product) non-GMP. The scope of Inquiry number 807836c included [ * ] ([ * ] intermediate, yield approx [ * ]). No additional cost is required for the larger scale in this proposal. [ * ] will be invoiced under Inquiry number 807836c. This current inquiry includes [ * ] performed under GMP conditions to yield [ * ]. The targeted amount is [ * ] of [ * ]. 3) Shipment to GTx [ * ] of [ * ] will be shipped to GTx [ * ]. 4) The remainder [ * ] of [ * ] will be used during Inquiry number 807836c for [ * ] for lab scale development of [ * ].
Proposed Scope of Work. Utilizing the current technology available, begin a synthesis of a variety of compounds and intermediates. [ * ] of the synthesis will begin with [ * ] of [ * ] to prepare intermediate [ * ]. All of the product will be carried forward to [ * ] to prepare intermediate [ * ]. Again, all of the product will be carried forward to [ * ] to prepare intermediate [ * ]. At this point the product will be [ * ]. [ * ] will be delivered to GTx Inc. ([ * ]). The [ * ] ([ * ]) will be converted to the [ * ] of [ * ] ([ * ]). The [ * ] ([ * ]) will be used to synthesize the [ * ] ([ * ]). Synthesis of the [ * ] compound ([ * ]) requires process development. [ * ] is assumed to be similar to [ * ] in terms of time and materials. GTx Inc. will be contacted to verify the quantity of [ * ] compound for each of the [ * ] parts. Note, [ * ] of [ * ] product yields approximately [ * ] of final product. Phase I Process Development Costs Perform two lab experiments [ * ]. These experiments allow the chemist to gain an understanding of the chemistry before the large batch is committed to the procedure. The first experiment will duplicate the best technology to date and identify any scale up issues with the small scale experimental procedure. The issues that are identified in the first experiment will cause changes to be tried in the second experiment before performing the large scale work. Budget [ * ], [ * ] Timing [ * ]
Proposed Scope of Work. 1. What type of work will be included in this work plan application? Check all applicable. □ Planning □ Investigative ☐✔ Construction/Rehab □ Post Project Evaluation □ Training □ Other 2. What is the total value of the request by the municipality for funding through the PPII program for work outlined in this work plan? $ 430,000.00 3. Provide the scope of work that will be included in this work plan. The work includes the rehabilitation of 21 sanitary laterals in the Terrace Drive Area, in the Village of Elm Grove. The sanitary sewer laterals were televised in 2017, as part of the investigative phase. The 21 selected laterals showed moderate to severe defects. The proposed work includes lateral root cleaning, lateral replacement by pipe bursting existing vitrified clay pipe (15 laterals), open-cut spot repairs (5 laterals), and chemical grout repairs (4 laterals). For the laterals being pipe burst or open-cut, the new lateral would terminate at a location as close to the building foundation as possible. The consultant and Village staff will coordinate with the property owners to determine exact location, taking into account any landscaping or hardscaping features along the lateral route. The connection between the existing pipe and new pipe will be made with a fernco that provides a watertight seal. The trench, ditch and pavement will be fully restored in-kind. 4. What entity is responsible for each work scope item e.g. municipality staff, consultant, contractor, District, etc. -Public outreach and informational meeting: consultant, Village staff, District -Onsite layout of lateral location and determination of replacement length: consultant, homeowner, Village staff -Preparation of bidding documents and exhibits: consultant -Bid procurement: consultant -Bid evaluation and award of contract: consultant, Village staff, District -Construction: contractor -Construction review: consultant 5. What is the total number of properties in the project area? 21 6. What is the assumed number of participating properties? 18 7. What is your justification for the assumed participation rate? ☐ Prioritization of properties □✔ Assumed percent of total ☐ Existing ▇▇▇ agreements based on investigative work based on previous projects ☐ Other (Fill in Blank):
Proposed Scope of Work. NTC proposes to continue supporting CUSD as they work to support the district in achieving goals through the Foundational California Induction Collaborative Membership, virtual consultation, and online tool access . As members of the Foundational California Induction Collaborative (CAIC) Clovis Unified School District is invited to participate in twice yearly convenings (locations TBD). CAIC offers an opportunity to connect with other induction programs from across the state, collaborating around program quality, impact, accreditation, and sustainability. The “More Robust” CAIC Membership includes: ○ Provides all users with access to mentoring cycle (inquiry-action) tools and reports (individual, roster, and program level analytics) The NTC Program Quality Survey (PQS) is administered annually in the spring. PQS measures are research-based and externally validated scales where possible, and all measures are evaluated annually using appropriate statistical methods. PQS results support program leaders to communicate with stakeholders about the program, including talking points around the three focus areas: program demographics, program strategies, and program impact. The survey results provide important insight into the experiences of program participants and the alignment of results to your program goals and priorities. The PQS includes: ■ Core PQS administered to teachers, mentors and program leaders ■ Survey administration during pre-set window ■ Program-level reports (scaled and open-ended) if response rate requirements are met (at least 50%) ● One half-day of virtual consultation with NTC to support program implementation. The goal of NTC’s program leadership consultation is to help create aligned systems of teacher development. NTC’s partnership model focuses on collaborative, long-term relationships that build the capacity of program leaders and leadership teams to provide sustainable, high-quality teacher induction. NTC staff engages with program leadership to provide a district assessment to determine needs and technical assistance. Specific outcomes of this consultation time include:
Proposed Scope of Work. ADS Environmental Services (“ADS”) will perform a temporary flow-monitoring project in coordination with Wessler Enginering using eight (8) ADS Flow Metering Systems. This scope of work is described as follows:
Proposed Scope of Work. We propose the following scope of work to provide subsurface exploration and instrumentation for evaluation of subsurface conditions and monitoring of potential landslide extents.
Proposed Scope of Work please select all the apply. (continued on next page)