The Quality Control/Quality Assurance clause establishes the standards and procedures that must be followed to ensure that goods or services meet specified quality requirements. It typically outlines the methods for inspection, testing, and documentation, and may require the supplier to implement quality management systems or allow the client to conduct audits. This clause is essential for maintaining consistent quality, minimizing defects, and ensuring that deliverables conform to agreed-upon specifications.
POPULAR SAMPLE Copied 1 times
Quality Control/Quality Assurance. Contractor shall retain a qualified person or firm to be responsible for quality control and quality assurance of the completed Work (the “QA/QC Director”), subject to the approval of Owner, not to be unreasonably withheld. The QA/QC Director shall be responsible, among other things, for developing procedures for testing materials, the oversight of materials testing, inspecting field assembled equipment (such as quality control of welding procedures and welding testing), verifying QA/QC of materials used in the manufacture of major equipment and verifying that all equipment and materials delivered to the Site meet the specifications of Engineer. The QA/QC Director shall report to PM/CM, Contractor and the Owner on a biweekly basis, or more frequently as needed. The role and specific responsibilities of QA/QC Director with respect to the Project shall be more particularly set forth in the agreement between Contractor and QA/QC Director (the “QA/QC Contract”).
Quality Control/Quality Assurance. R&E shall implement a quality control/quality assurance program consisting of regular coordination meetings with R&E and Subconsultant staff, in-house review of design elements and contract documents as well as City review of design elements and contract documents.
Quality Control/Quality Assurance. The CONSULTANT shall implement a quality control/quality assurance program consisting of regular coordination meetings with CONSULTANT and Subconsultant staff, in-house review of design elements and contract documents as well as CITY review of design elements and contract documents. Products and Deliverables: • Meeting Notes and Minutes • Monthly Progress Reports • Monthly Invoices • Notes to Design File
Quality Control/Quality Assurance. 5.1. The Contractor will provide details of internal QC/QA data as and when requested to do so by the Authority, but at no more than a monthly frequency. The Authority will send the Contractor ‘blind’ samples of known genotype on a regular basis. The Contractor will be paid for these samples but will undertake to discuss immediately with the Authority any unexpected results. The Contractor will take immediate action to make any correction to their procedures or processes which are found to be necessary at no cost to the Authority.
5.2. If it transpires that the Contractor has supplied an incorrect result, they will test immediately duplicate samples which may need to be taken. If the contractor has been shown to be responsible for the incorrect result the Authority’s reasonable full economic costs, not to exceed [*] per sample in collecting these samples for re-testing will be debited from the Contractor’s next monthly invoice.
Quality Control/Quality Assurance. Consultant shall: Create a project specific quality management plan. Quality control activities will be completed for each deliverable. Coordinate between design disciplines so that the design is in conformance with applicable City of Bend and ODOT design standards (in place at time of Project), and that prior review comments have been incorporated into the design. Perform an internal Quality Control (QC) Review prior to each Agency plan review submittal. Coordinate and perform QC checks on plans, design revisions and computations, estimates, and other deliverables. Task 1 Deliverables:
Quality Control/Quality Assurance. Our project manager and key team members will utilize a quality control plan/process for this project whereby deliverables are reviewed for uniformity, compatibility and constructability as well as general conformance with the Federal HBP program requirements. Senior level roadway and bridge PS&E review will be incorporated with Task 7, “Civil Engineering”.
Quality Control/Quality Assurance. In accordance with the requirements of Appendix X and Division X of the Project Specifications, the Design/Builder shall be responsible and accountable for the quality control of the Work including, without limitation, all quality control testing and inspections for the Work. The Design/Builder shall supervise the Work of all Subcontractors, reviewing construction means, methods, techniques, sequences and procedures, providing instructions to each when their Work does not conform to the requirements of the Contract Documents. The Design/Builder shall be responsible for ensuring that each Subcontractor makes whatever necessary corrections are required in a timely manner, so as to not affect the efficient and timely progress of the Work. The Design/Builder shall receive copies of all Claims or reports issued by the Consultant (with copy to the Village) relative to the performance or acceptability of Work. Should disagreement occur between the Design/Builder and either the Contract Administrator or the Consultant over acceptability of Work and its conformance with the requirements of the Contract Documents of the Project, the Village shall be the final judge of performance and acceptability, and noncompliant Work shall be corrected accordingly. The Village may employ independent firm(s) for verification testing of the quality control testing performed by or on behalf of Design/Builder. However, the Village shall not be obligated to have such verification testing performed, nor shall its commissioning, or election not to commission, such verification testing relieve Design/Builder of its independent obligations under the Contract Documents to perform such quality control testing and inspections and ensure the Work complies with the Contract Documents. The Design/Builder will exercise reasonable care and diligence in discovering and promptly reporting to Village any defects or deficiencies in the Work. The Design/Builder shall establish the Project Schedule and review the progress schedules submitted by Subcontractors in order to ensure proper and timely completion of the Work.
Quality Control/Quality Assurance. ▪ Follow a Quality Control/Quality Assurance (QA/QC) plan, including a process whereby all documents and supporting calculations submitted for review are fully checked by a qualified individual other than the originator. Provide the QA/QC documentation for CITY review upon request, including any check plans, checked computations, and notes to document the QA/QC activities.
Quality Control/Quality Assurance. ▇▇▇▇ ▇▇▇▇▇▇ will establish and implement a quality control and quality assurance procedures for design activities, perform in-house quality control reviews for each report and other task deliverables. Quality Control documentation can be submitted to the City upon request. For the purposes of this initial Phase of work, the QA/QC procedures from Phase 1 & 2 will be used.
Quality Control/Quality Assurance. Construction Manager shall develop and implement a Quality Control Plan to govern all testing, inspection, and review of its Work and the Work of its Subcontractors during the Construction Phase to ensure it complies with Applicable Laws, standards and requirements of Owner and Project Manager, and any insurance requirements. The Construction Manager’s Quality Control Plan shall be attached to Final Guaranteed Maximum Price Amendment as Attachment 12. At a minimum, Construction Manager’s Quality Control Plan shall include identification of the Quality Control supervisor, the details of the proposed Quality Control Plan and implementation of same; production and implementation of Quality Control reports; confirmation that any Quality Control Plan complies with Applicable Law and requirements set forth in any insurance requirements. Construction Manager’s Quality Control Plan shall contain a methodology for incorporation of the Quality Control Plan into all subcontracts and appropriate oversight to deliver the Project such that it complies with the Contract Documents in all respects. Construction Manager shall provide Owner and Project Manager Quality Control reports for their review and approval. During the Construction Phase, Owner shall perform Quality Assurance testing.