Removal of Obstructions Sample Clauses
The Removal of Obstructions clause requires parties, typically contractors, to clear any physical barriers or debris that impede the progress of work on a project site. This may involve removing construction waste, equipment, or natural obstacles to ensure that work areas remain accessible and safe for ongoing operations. By mandating the prompt removal of such obstructions, the clause helps maintain project timelines, reduces safety hazards, and ensures that work can proceed efficiently without unnecessary delays.
Removal of Obstructions. In the event of any derelict foundations, walls, slabs, ▇▇▇▇▇, etc., being discovered upon the site of the works, they shall, if below new foundations are completely removed to a level of 150 mm below the level of the excavation indicated on the drawings. For graded or planted areas any such obstruction shall be removed to a depth of 600 mm below the finished grade. Filling voids caused by removal of such obstructions shall be executed in accordance with Clause D.20 herein
Removal of Obstructions. The Permittee shall remove obstructions and sediment during the time periods specified if a substantial threat to a facility exists. The Permittee may remove obstructions and sediment at any time if the obstructions and sediment would reasonably be expected to cause substantial damage to resources or cause the facility to fail outside the time periods specified above.
Removal of Obstructions. Lessee has the right to remove obstructions from Lessor’s Property, including but not limited to vegetation, which may encroach upon, interfere with or present a hazard to Lessee’s use of the Leased Premises or the Easements. Lessee shall dispose of any materials removed.
Removal of Obstructions. If a substantial threat to a facility exists, removal of obstructions and sediment shall be limited to the time periods specified in measure
2.1. If the obstructions and sediment would reasonably be expected to cause substantial damage to resources or cause the facility to fail, the Permittee may remove obstructions and sediment at any time.
Removal of Obstructions. Developer shall have the right to remove and dispose of, in any lawful manner it deems appropriate, any object or other article of personal property left or deposited on the Full Public Access Improvements deemed to be an obstruction, interference or restriction on the use of the Full Public Access Improvements for the purposes set forth in this Agreement, including, but not limited to, personal belongings or equipment abandoned in the Full Public Access Improvements during hours when public access is not allowed pursuant to these Regulations.
Removal of Obstructions. Grantee has the right to remove obstructions, including but not limited to vegetation, which encroach upon, interfere with or present a hazard to Grantee’s or Lessee’s use of the Easement Area, provided any such removal shall be in compliance with all applicable laws and Grantee shall be responsible, and indemnify Grantor from and against, any and all liability or damages arising out of Grantee’s removal of any such obstructions or vegetation. Grantee shall be responsible for disposing of any materials related to the removal of obstructions. Notwithstanding anything to the contrary in this Section 11, except in the case of an emergency, Grantee shall notify Grantor prior to removing any such obstructions.
Removal of Obstructions. Upon termination of this Agreement the Owner shall, at the Owner’s sole cost and expense, remove all materials placed by the Owner other than natural vegetation, located within the Encroachment Area.
Removal of Obstructions. Upon notice to Licensor, Licensee has the right to remove obstructions from the Premises, including but not limited to vegetation, which may encroach upon, interfere with or present a hazard to Licensee’s use of the Premises. Licensee shall dispose of any materials removed.
Removal of Obstructions. The Contract shall remove and dispose of all structures, debris, or other obstructions of any character to the Work to be performed.
Removal of Obstructions. Removing Storm related Items