Removal or Relocation/Replacement of Existing Groundwater Monitoring ▇▇▇▇▇ and Remediation System Pipelines Clause Samples

Removal or Relocation/Replacement of Existing Groundwater Monitoring ▇▇▇▇▇ and Remediation System Pipelines. Both the Navy and MEW Companies currently operate groundwater remediation systems located on the NRP, as described in Section 2.4. The layout of major features of the existing groundwater treatment systems are shown on Figure 5. Components of the remediation systems include groundwater extraction ▇▇▇▇▇, single and double-contained pipelines, air relief structures, electrical power and instrumentation conduits, fiber-optic instrument systems, electrical field control panels, leak detection systems, radio frequency communication links, settlement pin monuments, groundwater treatment systems, and a network of groundwater monitoring ▇▇▇▇▇. The location and depth of existing groundwater monitoring and extraction ▇▇▇▇▇ are identified in the Environmental Baseline Survey Reports prepared for the NRP (▇▇▇▇▇▇▇ 2000a; 2001 a; 2001 c). The Navy and MEW Companies are required to operate the groundwater remediation systems on a continuous basis except for required maintenance. Therefore, consideration must be given during the design of NRP development projects to identify measures to protect the integrity of the remediation systems and allow for their continued operation while minimizing any shutdowns of system components. 5.4.1. NASA Agreements Relating to Coordination of NRP Development with the Navy and MEW Companies’ Groundwater Remediation Systems

Related to Removal or Relocation/Replacement of Existing Groundwater Monitoring ▇▇▇▇▇ and Remediation System Pipelines

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Operating Environment Per specifications given in Ref. [1]

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Removal of Improvements All alterations, additions and other improvements by Tenant shall become the property of Landlord and shall not be removed from the Premises, unless request is made by Landlord to Tenant to remove those alterations, additions and other improvements which were made without Landlord's approval where such approval was required under this Lease. All moveable trade fixtures, furniture, furnishings and signs installed in the Premises by Tenant and paid for by Tenant, shall remain the property of Tenant and may be removed upon the expiration of the term of this Lease; provided that any of such items as are affixed to the Premises and require severance may be removed only if Tenant repairs any damage caused by such removal and that Tenant shall otherwise comply with all of the terms, conditions and covenants to be performed by Tenant under this Lease with respect to such removal. If Tenant fails to remove such items from the Premises by the expiration of the Lease Term or earlier termination of this Lease, all such trade fixtures, furniture, furnishings and signs shall become the property of Landlord, unless Landlord elects to require their removal, in which case Tenant shall, at its sole cost and expense, promptly remove the same and restore the Premises to its condition on the date of this Lease. The covenants contained in this Section shall survive the expiration of the Lease Term or earlier termination hereof.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.