Repair Time Clause Samples

POPULAR SAMPLE Copied 3 times
Repair Time. In the event it is necessary to shut down Contractor’s rig for repairs, excluding routine rig servicing. Contractor shall be allowed compensation at the applicable rate for such shut down time up to a maximum of 4 hours for any one rig repair job, but not to exceed 24 hours of such compensation for any calendar month. Thereafter, Contractor shall be compensated at a rate of $ -0- per twenty-four (24) hour day. Routine rig servicing shall include, but not be limited to, cutting and slipping drilling line, changing pump or swivel expendables, testing BOP equipment, lubricating rig, and ________ _______________________________________.
Repair Time. In the event it is necessary to shut down Contractor’s rig for repairs, excluding routine rig servicing, Contractor shall be allowed compensation at the applicable rate for such shut down time up to a maximum of 4 hours for any one rig repair job, but not to exceed 24 hours of such compensation for any calendar month. Thereafter, Contractor shall be compensated at a rate of $0 per twenty-four (24) hour day. Routine rig servicing shall include, but not be limited to, cutting and slipping drilling line, changing pump or swivel expendables, testing BOP equipment, lubricating rig, and
Repair Time. The repair time covers the maximum period from receipt of an incident report by the supplier until the successful remedy of the incident. The repair time shall be determined in the contract.
Repair Time the time measured and registered by the Provider, between the registration of a failure by the Provider and the notification by the Provider to the Client that the failure has been repaired;
Repair Time. On receipt of the Equipment for corrective maintenance, the Company undertakes to use reasonable endeavours to make any repairs and adjustments and replace those parts of the Equipment necessary to restore the Equipment to its proper operating condition. The Company shall promptly notify the Customer if the Equipment returned is found to be beyond economic repair.
Repair Time for traffic signal control systems and subsystems
Repair Time. The following section identifies the time required for the Contractor to complete repairs on any item of equipment or the system.
Repair Time. The interval between a trouble ticket being created and the technology issue is resolved, or an acceptable workaround is in place, and all functions have been restored to normal.
Repair Time. Once an RMA is received, the committed turnaround time for repair to be made and return shipment to Customer under this Silver Support agreement is sixteen (16) business days. However, shortages from 3rd party suppliers may prolong the turnaround time, when MEXL will notify before proceeding with the RMA.
Repair Time. This shall be the time required to restore a function to an operational state following the response to a Service Request. Priority 1 and Priority 2 repairs shall be performed on an expedited basis. ESI will ensure that technicians are furnished with sufficient tools and spare parts and equipment, or such spare parts and equipment shall be conveniently positioned so repairs are expedited. ▇▇▇ will immediately notify the C/CAG Project Manager or its designee if any required response or repair time cannot be met, the reason why, and the anticipated time of response and/or repair. This notification shall not in and of itself relieve ESI of their obligations to meet the required response and repair times.