Common use of Reports of unusual Clause in Contracts

Reports of unusual. occurrence The Contractor shall, during the Maintenance Period, prior to the close of each day, send to the Authority and the Authority’s Engineer, by facsimile or e- mail, a report stating accidents and unusual occurrences on the Project Highway relating to the safety and security of the Users and Project Highway. A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include: (a) accident, death or severe injury to any person; (b) damaged or dislodged fixed equipment; (c) flooding of Project Highway; and (d) any other unusual occurrence. Draft Contract AgreementPage 98 of 155 Construction of Balance Work of 2 Lane with Paved Shoulders of Joram-Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length- 16.036 Km] in the State of Arunachal Pradesh under SARDP-NE Aug. 2021

Appears in 1 contract

Sources: Construction Contract

Reports of unusual. occurrence The Contractor shall, during the Maintenance Period, prior to the close of each day, send to the Authority and the Authority’s Engineer, by facsimile or e- mail, a report stating accidents and unusual occurrences on the Project Highway relating to the safety and security of the Users and Project Highway. A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include: (a) accident, death or severe injury to any person; (b) damaged or dislodged fixed equipment; (c) flooding of Project Highway; and (d) any other unusual occurrence. Draft Contract AgreementPage 98 93 of 155 Construction of Balance Work of 150 Rehabilitation and Up-gradation to 2 Lane lane with Paved Shoulders shoulder of JoramNH-717A in Ranipool-Koloriang road Pakyong section from Design CH: 2.00 to CH: 6.00 (NH 713) on EPC basis from existing Km 138.00 3.100 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length- 16.036 Km] 7.200 of NH-717A) in the State of Arunachal Pradesh under SARDP-NE Aug. Sikkim on EPC Mode Feb. 2021

Appears in 1 contract

Sources: Contract Agreement