Right of Way Survey. Right-of-way determination will be based upon record title information, found monuments shown on recorded survey maps and County right of way maps and deeds. Once the areas for the potential right-of-way acquisition have been defined by DHA, the adjoining property boundaries will be more accurately defined for use in preparation of legal descriptions for proposed permanent right- of-way takes where required. Right of way plats will be prepared in accordance with County standards for each property owner that shows both permanent takes and temporary construction easements. SHN surveyors will flag the proposed R/W lines for inspection/approval by the County right-of-way agent and property owner (if permanent right-of-way is required). At the completion of the project, SHN will provide the County and DHA with a hard copy and digital drawing file compiled in AutoCAD Civil 3D .dwg file format of the project base map.
Appears in 1 contract
Right of Way Survey. Right-of-way determination will be based upon record title information, found monuments shown on recorded survey maps and County right of way maps and deeds. Once the areas for the potential right-of-way acquisition have been defined by DHA, the adjoining property boundaries will be more accurately defined for use in preparation of legal descriptions for proposed permanent right- of-way takes where required. Right of way plats will be prepared in accordance with County standards for each property owner that shows both permanent takes and temporary construction easements. SHN surveyors will flag the proposed R/W lines for inspection/approval by the County right-of-way agent and property owner (if permanent right-of-way is required). At the completion of the project, SHN will provide the County and DHA with a hard copy and digital drawing file compiled in AutoCAD Civil 3D .dwg file format of the project base map. Included in this deliverable will be the Digital Terrain Model of the project surface and field survey points files.
Appears in 1 contract