Risk and Prioritization Methodology – Complete Sample Clauses

Risk and Prioritization Methodology – Complete. Carollo will develop a method to prioritize the improvement projects based on factors such as risk, sustainability (such as Envision), energy conservation measures (ECMs), and alignment with Council Priorities and purpose statements of Public Works and the Water Utilities Division. The methodology will be designed around City feedback from the Risk and Prioritization Workshop (Task 100). The purpose of the prioritization methodology will be to best balance life cycle costs, water quality, cost and performance of treatment systems, and risk/criticality of assets into a phased improvement plan that is transparent and justifiable. Once the prioritization framework is developed, then Carollo will use the methodology to score or rank each of the projects. The ranking will be used to adjust the projects and their timing to produce a prioritized improvement plan for the treatment plants.

Related to Risk and Prioritization Methodology – Complete

  • Claims Review Methodology ‌‌ a. C laims Review Population. A description of the Population subject‌‌ to the Quarterly Claims Review.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Scoring The number of routes each company operates (Route # 0001-2999, 8000-8199) will be multiplied by 2 to determine the daily number of trips. (Only accidents, breakdowns and service reports related to routes falling in this range will be used for the evaluation). The daily number of trips will be multiplied by 175 to arrive at the annual number of trips. The number of accidents, breakdowns and service complaints will be divided by the total number of trips to calculate a percent figure. Each company’s percentage will be compared to the total average. See below for a sample. BUS COMPANY NUMBER OF TOTAL BKDN PERCENT ACCIDENTS PERCENT2 SERVICE PERCENT3 ROUTES TRIPS BKDN ACCIDENTS REPORTS COMPLAINTS TO TRIPS TO TRIPS TO TRIPS A 360 58680 3 0.01% 27 0.05% 46 0.08% B 48 7824 3 0.04% 4 0.05% 39 0.50% C 123 20049 11 0.05% 9 0.04% 27 0.13% D 91 14833 0.00% 10 0.07% 11 0.07% E 124 20212 20 0.10% 19 0.09% 18 0.09% TOTALS 746 121598 37 0.03% 69 0.06% 141 0.12% To score, if a company’s percentage is less than or equal to the total percentage for that category, the company will be awarded 6 points per category. Percentages greater than the total percentage for each distinct category (Accident, Breakdown, Service Complaints) will be scored according to the following scale: Less than-Equal to Ave. 6 points 0-3% above average 5 points 4-7% above average 4 points 5-8% above average 3 points 9-12% above average 2 points 13-16% 1 points Greater than 17% 0 points Any circumstance whereby a Breakdown or Accident is found by PTS to be ‘Non Reported’ by vendor within the required timeframe (see G-36) will count as (20) ‘Reported’ instances for the purpose of this Contractor Evaluation Scoring.

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.