Schedule of Requirement Clause Samples

Schedule of Requirement. The Technical Specification
Schedule of Requirement. 40.1 The supplies shall be delivered/shipped as per following schedule of requirement indicated in the Bid Data Sheet.
Schedule of Requirement. 40.1 The commencement of services as per Schedule of Requirement indicated in the Bid Data Sheet. 40.2 In case of late delivery in commencement of services beyond the periods specified in the Schedule of Requirements, penalty shall be imposed shall be imposed upon the Contractor as indicated in Scope of services/Terms of Reference.
Schedule of Requirement. 40.1 The supplies shall be delivered/shipped as per following schedule of requirement indicated in the Bid Data Sheet. 40.2 In case of late delivery of goods beyond the periods specified in the Schedule of Requirements, penalty shall be imposed shall be imposed upon the Supplier as indicated in Bid Data Sheet.
Schedule of Requirement. 15 days from the date of issuance of purchase order with penalty @ 0.5% per day of the purchase order amount after 15 day will be imposed.
Schedule of Requirement. DGMS approved fire resistant synthetic hydraulic fluid HFDU-68 non toxic conforming to IS 7895 of 1975 with latest amendment (if any) packed in 210 liters non returnable suitable container.
Schedule of Requirement. 40.1 The supplies shall be delivered/shipped as per schedule of requirement indicated in the Bid Data Sheet. 40.2 In case of late delivery of goods beyond the periods specified in the Schedule of Requirements, penalty shall be imposed shall be imposed upon the Supplier as indicated in Bid Data Sheet. 40.3 In case of DDP the delivery period will be started from the date of issuance of Purchase order and in the case of CFR/CPT it will be from the date of establishment of LC by the Bank in favor of manufacturer/Beneficiary.
Schedule of Requirement. Schedule of Requirement (SoR) for Repairs followed by calibration of FLUKE Test equipment held at Machinery Controls Department(MCD) of Naval Ship Repair Yard (Kochi is as mentioned below: - (a) Repairs of Fluke - 9144, Temperature Drywell Job 01 (b) Repairs of Fluke - 6270A, Pneumatic Pressure Controller Job 01
Schedule of Requirement. 5.1 The British Embassy in Baghdad requires a fuel supplier/s to provide DF2 Fuel. The two (2) main uses for this fuel are as follows: 5.1.1 Used to supply REDACTED standby generators, which feed the compound with power during city power failure. The city power is not reliable during summer and other times of the year. 5.1.2 Used to fill the armoured vehicles. The Embassy has REDACTED armoured vehicles for transportation and evacuation purposes. REDACTED • REDACTED
Schedule of Requirement. 36.1 The work shall be executed strictly as per schedule given in schedule of requirements otherwise penalty will be charged as mentioned below: Mode of Shipping/ Delivery Period penalty Monthly Inspection & Maintenance Report: Monthly Inspection/ Service & Maintenance report of 30 Days. To be provided to the engineer concerned on 30th day of every month. The report shall mention current condition of the HVAC plant, maintenance performed in the plant in that month, Without preventive measures performed for smooth Penalty functioning of the plant, requirement of replacements of spare parts etc. Maintenance Jobs As mentioned in Section IV