Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)
Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.
Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.
DRUG/ALCOHOL TESTING Section 33.1 Drug testing may be conducted on employees during their duty hours upon reasonable suspicion or randomly by computer selection. Alcohol testing will be conducted only upon reasonable suspicion. Reasonable suspicion that an employee used or is using a controlled substance or alcohol in an unlawful or abusive manner may be based upon, but not limited to: A. Observable phenomena, such as direct observation of drug or alcohol use or possession and/or the physical symptoms of being under the influence of a drug or alcohol; B. A pattern or abnormal conduct or erratic behavior, including abnormal leave patterns; C. Arrest or conviction for a drug or alcohol-related offense, or the identification of an employee as the focus of a criminal investigation into illegal drug or alcohol possession, use, or trafficking; D. Information provided either by reliable and credible sources or independently corroborated; E. Evidence that an employee has tampered with a previous drug test; F. Facts or circumstances developed in the course of an authorized investigation of an accident or unsafe working practices. Section 33.2 Drug/alcohol testing shall be conducted solely for administrative purposes and the results obtained shall not be used in criminal proceedings. Under no circumstances may the results of drug/alcohol screening or testing be released to a third party for use in a criminal prosecution against the affected employee. The following procedure shall not preclude the Employer from other administrative action but such actions shall not be based solely upon the initial reagent testing results alone. Section 33.3 All drug screening tests shall be conducted by laboratories meeting the standards of the Substance Abuse and Mental Health Service Administration. No test shall be considered positive until it has been confirmed by a Gas Chromatography/Mass Spectrometry. The procedures utilized by the Employer and testing laboratory shall include an evidentiary chain of custody control and split sample testing. All procedures shall be outlined in writing and this outline shall be followed in all situations arising under this article. Section 33.4 Alcohol testing shall be done in accordance with the law of the State of Ohio to detect drivers operating a motor vehicle under the influence. A positive result shall entitle the Employer to proceed with sanctions as set forth in this Article. Section 33.5 The results of the testing shall be delivered to a specified employee of the Employer with command responsibility and the employee tested. An employee whose confirmatory test result is positive shall have the right to request a certified copy of the testing results in which the vendor shall affirm that the test results were obtained using the approved protocol methods. The employee shall provide a signed release for disclosure of the testing results to the Employer. A representative for the bargaining unit shall have a right of access to the results upon request to the Employer, with the employee’s written consent. Refusal to submit to the testing provided for under this Agreement may be grounds for discipline. A. If a drug screening test is positive, a confirmatory test shall be conducted utilizing the fluid from the primary sample. B. In the event that any confirmation drug test results are positive, the employee is entitled to have the split sample tested by another DHHS-certified lab in the manner prescribed above at the employee’s expense. The employee must request the split sample test within seventy-two (72) hours of being notified of a positive result. The results of this test, whether positive or negative, shall be determinative. Section 33.7 A list of three (3) testing laboratories shall be maintained by the Employer. These laboratories shall conduct any testing directed by the Employer. The Employer shall obtain the approval of the bargaining unit representative as to any laboratories put on this list, which approval shall not be unreasonably withheld. Section 33.8 If after the testing required above has produced a positive result the Employer may require the employee to participate in any rehabilitation or detoxification program that is covered by the employee’s health insurance. Discipline allowed by the positive findings provided for above shall be deferred pending rehabilitation of the employee within a reasonable period. An employee who participates in a rehabilitation or detoxification program shall be allowed to use sick time and vacation leave for the period of the rehabilitation or detoxification program. If no such leave credits are available, the employee shall be placed on medical leave of absence without pay for the period of the rehabilitation or detoxification program. Upon completion of such program and upon receiving results from a retest demonstrating that the employee is no longer abusing a controlled substance/alcohol, the employee shall be returned to his/her former position. Such employee may be subject to periodic retesting upon his/her return to his/her position for a period of one (1) year from the date of his/her return to work. Any employee in a rehabilitation or detoxification program in accordance with this Article will not lose any seniority or benefits, should it be necessary for the employee to be placed on medical leave of absence without pay, for a period not to exceed ninety (90) days. Section 33.9 If the employee refuses to undergo rehabilitation or detoxification, or if he/she tests positive during a retesting within one (1) year after his/her return to work from such a program, the employee shall be subject to disciplinary action, including removal from his/her position and termination of his/her employment. Section 33.10 Costs of all drug screening tests and confirmatory tests shall be borne by the Employer except that any test initiated at the request of the employee shall be at the employee’s expense. Section 33.11 The Employer may conduct four (4) tests of an employee during the one (1) year period after the employee has completed a rehabilitation or detoxification program as provided above. Section 33.12 The provisions of this Article shall not require the Employer to offer a rehabilitation/detoxification program to any employee more than once.
Design Criteria A/E shall prepare all work in accordance with the latest version of applicable County’s procedures, specifications, manuals, guidelines, standard drawings, and standard specifications. A/E shall prepare each Plans, Specifications, and Estimates (PS&E) package in a form suitable for letting through County’s construction contract bidding and awarding process.