Shell Construction Sample Clauses

The Shell Construction clause defines the requirements and standards for constructing the basic structural framework or envelope of a building. This typically includes elements such as the foundation, exterior walls, roof, and sometimes windows and doors, but excludes interior finishes and systems. By specifying the scope and quality of the shell, this clause ensures that the essential structure is completed to a certain standard before further work proceeds, thereby providing a clear division of responsibilities and helping to prevent disputes over what constitutes the completed building shell.
Shell Construction. Landlord shall only provide as part of the initial construction of the Building the following items: (i) outside walls, columns and unfinished concrete floors, broom clean; (ii) Building Standard electric capacity of not less than 1,600 amps to the Building core, per building specifications; and (iii) water lines to the Building (with Tenant to be responsible for all costs of hook-up of all and any utilities, water, sewer and other similar services with the City in which the Premises is located), including the costs related to energizing Tenant's electrical service, and the cost of meter installation and meters, which shall be paid for by Tenant and/or included in the Tenant Allowance. Landlord represents that the shell Building is currently in conformance with ADA requirements.
Shell Construction. Landlord shall provide at its sole cost and expense as part of the initial construction of the Building the following items: (i) outside walls, columns and unfinished concrete floors, broom clean; (ii) Building Standard power supplied to the Building core, per building specifications; (iii) water lines to the Building (with Tenant to be responsible for all costs of hook-up of any and all utilities, water, sewer and other similar services with the City in which the Premises is located); (iv) Common Areas existing as of the Effective Date; (v) restrooms existing as of the Effective Date; and (vi) (28) 5-ton high efficient RTUs, (3) high efficient split system heat pumps, (4) wet column stacks to 2nd floor, restroom cores; women (6 toilet, 4 vanity), men (4 toilet, 2 urinal, 4 vanity), fire protection-light hazard (.10gpm/1500sf) NFPA 13/City of Phoenix Amended, SES 3600 A; 277/480 3 Phs Nema 1 rated; meter section w/1 ea=3600 A House Meter; 800 A 277/480 3 Phs Distribution Panels (two (2) per floor), Telco (4 ea) 4” conduits from ▇▇▇▇▇▇▇ ROW to Building (duct distribution and outside air units are excluded from the foregoing). Notwithstanding anything to the contrary contained herein, if Landlord fails to timely fulfill its obligation to perform the Landlord work or any portion thereof (the “Uncompleted Landlord Work”) prior to the Delivery Date, Tenant shall be entitled to deliver notice (the “Landlord Delay Notice”) thereof to Landlord and to any mortgage or trust deed holder of the Building whose identity and address have been previously provided to Tenant. If Landlord still fails to perform the Uncompleted Landlord Work, or commence to perform the same and proceed with due diligence to complete the same, or inform Tenant in reasonable detail why Landlord disagrees that the particular work requested by Tenant is not Landlord’s obligation under this Lease, within ten (10) business days after Landlord’s receipt of the Landlord Delay Notice from Tenant (the “Landlord Cure Period”) and if Landlord fails to deliver notice to Tenant prior to the expiration of the Landlord Cure Period notifying Tenant that Landlord’s failure to perform the Uncompleted Landlord Work is caused by Tenant or a Force Majeure Delay (a “Landlord Delay Response”), Tenant shall be entitled to perform the Uncompleted Landlord Work and shall within five (5) business days of the completion thereof deliver written demand to Landlord for the reimbursement of Tenant’s reasonable and actual out...
Shell Construction. Landlord shall only provide as part of the initial construction of the Building the following items: (i) outside walls, columns and unfinished concrete floors, broom clean; (ii) Building Standard power supplied to the Building core, per building specifications; and (iii) water lines to the Building (with Tenant to be responsible for all costs of hook-up of any and all utilities, water, sewer and other similar services with the City in which the Premises is located).
Shell Construction. At such time as the Shell Plans have been approved in writing by both Landlord and Tenant, Landlord will cause the Shell to be constructed or installed on the Land in a good and workmanlike manner and according to the approved Shell Plans and all applicable Laws.

Related to Shell Construction

  • Legal Construction If one or more of the provisions contained in this Agreement shall for any reason be held invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provisions and this Agreement shall be construed as if it did not contain the invalid, illegal, or unenforceable provision.

  • Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the internal laws of the State of New York.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.