Shipping Container Clause Samples
Shipping Container a container capable of being secured with a tamper-evident seal that is used for transfer of one or more urine specimen bottle(s) and associated documentation from the collection site to the laboratory.
Shipping Container. Final package or container which is used to ship Materiel. Shipping containers may enclose unit packages and intermediate packages. A shipping container may also be used for the storage of Materiel.
Shipping Container. During the Term of the Lease, Lessee must retain the original shipping container for the Equipment as delivered to Lessee. If the shipping container is damaged, a replacement shipping container must be purchased from Lessor at the prevailing cost. If Lessor does not leave shipping container with Lessee, Lessee is not responsible for said shipping container.
Shipping Container. SELLER shall replace such Product units within fifteen business days from receipt and deliver them at SELLER's expense, F.O.B. the location specified by BUYER.
Shipping Container. The Scrap Material may be finished rolls or edge trim rolls which will be placed in gaylords on pallets. Jumbo rolls on paper cores up to 63 inches wide and jumbo rolls on steel cores up to 63 inches wide may be strapped on pallets or blocked on the floor of the truck.
Shipping Container. If you ship multiple containers, we STRONGLY REQUEST a Packing List on each container based on all multiple packages may not arrive the same day.
Shipping Container. RMS understands that the prerequisite for a license a) may be the existence of a suitable and certified shipping container for Product, and that b) RMS is responsible for providing said shipping container.
Shipping Container a. The entire pump installation must be housed inside a new 6 meter shipping container.
b. The shipping container may be a second hand refurbished container. Sentech must inspect and accept the interior and condition of the container, prior to fitting of the new pump sets.
c. The container must be prime coated prior to the application of two coats of exterior enamel paint, colour, FIRE ENGINE RED, must be applied.
d. Any damage to the container paint work, encountered during transportation and onsite installation, must be rectified to the satisfaction of the Sentech Engineer.
e. The container must be provided with a standard steel door pedestrian entrance. The entrance door must be provided with a standard suitable robust purpose made hasp and staple.
f. The floor of the container must be covered by rubberised interlocking floor tiles neatly and securely attached to the floor utilising an epoxy adhesive.
g. The container must include two new 5 kg foam fire extinguishers plus one 5 kg dry powder fire extinguisher, positioned on the exterior of the container on the opening side of the pedestrian door.
h. The new container must be provided with openings to accept the supply and delivery piping for new fire pumps. All openings must be sealed and filled with suitable expanding foam, after the installation of piping, including cover plates ( flanges ) to prevent ingress of dust and dirt. If necessary rubber inserts should be affixed around the edge of the opening to prevent damage to piping and to avoid ingress of dust.
i. The new container must be provided with a suitable galvanised steel outlet Louvre suitably matched to the diesel driven pump cooling air inlet.
j. The new container must be provided with a suitable galvanised steel air intake Louvre, approximately 1 200 millimetres wide and 1 200 millimetres high including 4 washable mini pleated filters class F7 as supplied by TROX or equal approved.
k. The container door locking mechanism and the pedestrian door must be provided with keyed alike Viro heavy duty padlocks.
l. The contractor must provide design and layout drawings, for approval by the Sentech Engineer, prior to assembly of the container and contents.
m. The Contractor must provide three bound copies of the operating procedures, specifications, parts manual and any other relevant information of the complete pumping system.
n. The pump sets shall not include any automatic stopping devices.
o. The container must be prime coated and then painted wi...
Shipping Container. If you ship multiple containers, we STRONGLY REQUEST a Packing List on each container based on all multiple packages may not arrive the same day. SHIPPING CONTAINER Unisys needs you to mark clearly each container with the following information. This information is particularly important if there are multiple containers to the shipment. a. Unisys address b. Your company's name and address c. Unisys Purchase/Reference Order number(s) d. Carton _____ of _____ or pallet _____ of ______.
Shipping Container. Unisys needs you to ▇▇▇▇ clearly each container with the following information. This information is particularly important if there are multiple containers to the shipment.