Shunt Reactors Sample Clauses

Shunt Reactors. 2.2.1 (765/√3) kV Single Phase Shunt Reactor 110 MVAR, 765/√3 kV, 1-Phase Reactor (including arrangement for 3-phase bank formation of 330 MVAR) shall conform to CEA’s “Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV and above voltage class)” as amended up to date available on CEA website. Spare 1-phase Shunt Reactor unit shall be placed and connected in such a way that the spare unit can be utilized for all the bus and switchable line reactor banks (including for future reactor banks) without its physical movement. Neutral Grounding Reactor and Surge Arrester for 765 kV Line Reactors (as applicable): The neutral of the line reactors (wherever provided) shall be grounded through adequately rated Neutral Grounding Reactors (NGR) to facilitate single phase auto-reclosure, provided that the NGR shall be provided with suitable bypass arrangement so that the line reactor can be used as bus reactor as and when required. The neutral of bus reactor shall be solidly grounded. NGR shall be oil filled or dry type air core for outdoor application. NGR shall conform to CEA’s “Standard Specifications and Technical Parameters of Transformers and Reactors (66 kV and above voltage class)”. as amended up to date. Technical parameters of NGR shall be as specified in Annexure-A of the above-mentioned document. The surge arresters (rated voltage of arrester in co-ordination with ohmic value of NGR shall be decided by the TSP) shall be provided and physically located between the neutral of shunt reactor (brought out at 145kV class bushing) and neutral grounding reactor. The surge arresters shall be of Station Medium (SM) class duty gapless Metal oxide (ZnO) type conforming in general to IEC-60099-
Shunt Reactors. B.2.2.1 420 kV, 3-Phase, Shunt Reactor
Shunt Reactors. B. 2.2.1 (765/√3) kV Single Phase Shunt Reactor 110 MVAR, 765/√3 kV, 1-Phase Reactor (including arrangement for 3-phase bank formation of 330 MVAR) shall conform to CEA’s “Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV and above voltage class)” as amended up to date available on CEA website. Spare 1-phase Shunt Reactor unit shall be placed and connected in such a way that the spare unit can be utilized for all the bus and switchable line reactor banks (including for future reactor banks) without its physical movement.
Shunt Reactors. B.2.2.1 (765/√3) kV Single Phase Shunt Reactor 110 MVAr, 765/√3 kV, 1-Phase Reactor (including arrangement for 3-phase bank formation of 330 MVAr) shall conform to CEA’s “Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV and above voltage class)” as amended up to date available on CEA website.
Shunt Reactors. 765/3 kV Single Phase Shunt Reactor Reactor shall conform to CEA’s “Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV and above)” available on CEA website.
Shunt Reactors. (A) 420kV, 3-Phase, Shunt Reactor Neutral Grounding Reactor and Surge Arrester for 420 kV Bus Reactors (as applicable):

Related to Shunt Reactors

  • Access Toll Connecting Trunk Group Architecture 8.2.1 If Reconex chooses to subtend a Verizon access Tandem, Reconex’s NPA/NXX must be assigned by Reconex to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center subtends as identified in the LERG. 8.2.2 Reconex shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from Reconex’s Customers. 8.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office Reconex utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the Tandem Verizon utilizes to provide Exchange Access in such LATA. 8.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow Reconex’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access tandem.

  • Smoke Detectors At Owner's expense, smoke detectors will be installed on the Property in working condition in accordance with the law prior to the tenant's occupancy. During the occupancy, it shall be the tenant's responsibility to maintain all smoke detectors. Owner will replace smoke detector equipment as needed.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.