SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION Clause Samples

The 'Specific Technical Requirements for Substation' clause defines the precise technical standards and criteria that must be met in the design, construction, and operation of a substation. This typically includes specifications for equipment such as transformers, switchgear, protection systems, and control panels, as well as requirements for safety, reliability, and compliance with relevant codes. By clearly outlining these requirements, the clause ensures that all parties understand the expected performance and quality standards, thereby minimizing misunderstandings and reducing the risk of non-compliance or technical failures.
SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION. The proposed 400 kV substation Bornagar (ISTS) shall be conventional AIS type conforming to the requirements of CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2022, as amended from time to time. Other CEA Regulations/guidelines as amended up to date and MoP guidelines, as applicable, shall also be followed.
SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION. Extension of 400/220 kV Jam Khambhaliya PS (GIS) shall be Gas Insulated Switchgear (GIS) type generally conforming to the requirements of CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations 2022, as amended from time to time. Other CEA Regulations/guidelines as amended up to date and MoP guidelines, as applicable, shall also be followed.
SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION. The extension of Kurnool-III PS and Chilakaluripeta S/s shall be conventional Air Insulated Switchgear (AIS) type conforming to the requirements of CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2022, as amended from time to time. Other CEA Regulations/Guidelines as amended up to date and MoP guidelines, as applicable, shall also be followed.
SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION. The proposed 400/220kV Fatehgarh-4 P.S. & extension of 400kV Fatehgarh-3 (AIS) PS shall be conventional AIS type generally conforming to the requirements of CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations 2010, as amended from time to time.
SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION. The proposed new substation at Nangalbibra shall be conventional AIS type generally conforming to the requirements of CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations 2010, as amended from time to time. The proposed augmentation of Bongaigaon substation shall be Gas Insulated Switchgear (GIS) type generally conforming to the requirements of CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations 2010, as amended from time to time.
SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION. The proposed 765/400 kV Jamnagar S/S and extension of 400 kV Jam Khambhaliya S/S shall be Gas Insulated Switchgear (GIS) type generally conforming to the requirements of CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations 2022, as amended from time to time. Other CEA Regulations/guidelines and MoP guidelines, as applicable, shall also be followed. Extension of 765 kV Halvad S/S shall be conventional AIS type generally conforming to the requirements of CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations 2022, as amended from time to time. Other CEA Regulations/guidelines and MoP guidelines, as applicable, shall also be followed.
SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION. The proposed augmentation at Fatehgarh-II & Bhadla-II) shall be AIS type generally conforming to the requirement of CEA regulation for construction of substation.
SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION. The proposed 400/220 Saswad S/s shall be AIS generally conforming to the requirements of CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations 2022, as amended from time to time. Other CEA Regulations/guidelines as amended up to date and MoP guidelines, as applicable, shall also be followed.
SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION. The proposed new substation shall be conventional AIS type generally conforming to the requirement of CEA regulation for construction of substation. The proposed augmentation at Cuddapah PS & Kurnool-III PS shall be AIS type generally conforming to the requirement of CEA regulation for construction of substation.
SPECIFIC TECHNICAL REQUIREMENTS FOR SUBSTATION. The proposed extension of 400kV Raipur Pool (POWERGRID) S/s & 400kV Dhamtari (CSPTCL) S/s shall be conventional AIS type generally conforming to the requirements of CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations 2010, as amended from time to time.