Control Room Sample Clauses
The Control Room clause establishes a designated group or physical location responsible for managing and safeguarding sensitive, often confidential, information within an organization, particularly in the context of financial transactions or mergers and acquisitions. This clause typically outlines procedures for restricting access to material non-public information, specifying who may enter the control room and under what circumstances, and may require the maintenance of logs or records of such access. Its core practical function is to prevent the improper dissemination of sensitive information, thereby ensuring compliance with legal and regulatory requirements and reducing the risk of insider trading or information leaks.
POPULAR SAMPLE Copied 2 times
Control Room. Integrates all internal and external security communications networks within a secure room. Activities conducted within the control room have a critical impact on the institution's orderly and secure operation.
Control Room. For the new substation, substation control room shall be provided to house substation work stations for station level control (SAS) along with its peripheral and recording equipment, AC and DC distribution boards, DC batteries and associated battery chargers, Fire Protection panels, Telecommunication panels and other panels as per requirements. Air conditioning shall be provided in the building as functional requirements. Main cable trenches from the control room shall have adequate space provision for laying of cables from the control room for all the future bays. At existing substations, the adequacy of size of control room shall be ascertained and the same shall be augmented as per requirement.
Control Room. At existing substations, the adequacy of size of control room shall be ascertained and the same shall be augmented as per requirement.
Control Room. A location where the line control, signalling control and traction current control (on some lines) functions are carried out in an integrated manner.
Control Room. In addition to installing the Equipment, the Project SPV shall set up a control room to monitor and operate the Project Public Street Lighting System in the space provided by the Authority pursuant to Clause 2.2(c)(i). The Project SPV shall set up the control room within 60 Days of execution of the Amendment Agreement. The control room shall be used solely for the purposes of monitoring and operating the Project Public Street Lighting System. The Project SPV shall, at its own cost, be responsible for upkeep and maintenance of the control room during the Term.
Control Room. No person may operate a control room1 or the equipment therein without Management approval.
Control Room. The control room will be designed to have security-protected access that isolates it from other operations in accordance with DOT control room regulations.
Control Room. A high level control room, located over part of the substation, houses the control console which controls, and indicates on a mimic diagram, the functioning of all the pumps and syphon-breaker valves. It also houses the gate winch controls, the filling valve controls, lighting controls and serves as a communication centre with public address, telephone and radio communications. The control room is in a position to provide monitoring and control of access to the pumproom.
Control Room. At minimum, the building should provide a two-hour fire resistance (typically concrete block with brick facing, minimal wired glass windows and fire-rated doors). Due to proximity to neighboring units and depending on the insurance company's position, some level of blast resistance may be required. Once building construction is agreed upon, the following fire protection should be provided:
(a) At minimum, smoke detection throughout, with alarms locally and audible in a constantly attended location.
(b) Fire protective cable coating and firestopping for significant electrical cable accumulations. Automatic suppression -- sprinkler or gas suppression system -- is an option if cable loading is significant.
(c) If support areas (offices, labs, etc.) contain a combustible occupancy, automatic sprinkler or other appropriate protection should be provided.
Control Room. The Parties agree that the Stadium and Stadium Infrastructure will include a control room for operation of the Communications Systems (the “Control Room”).