Operating Environment Per specifications given in Ref. [1]
Compliance with Environmental Laws; Environmental Reports (a) Comply and use commercially reasonable efforts to cause all lessees and other persons occupying Real Property owned or operated by any Company to comply, in all material respects with all Environmental Laws and Environmental Permits applicable to its operations and property and obtain and renew all material Environmental Permits applicable to its operations and property and conduct any Response in accordance with Environmental Laws; provided, however, that no Company shall be required to undertake any Response to the extent that its obligation to do so is being contested in good faith and by proper proceedings and appropriate reserves are being maintained with respect to such circumstances in accordance with GAAP. (b) If a Default caused by reason of a breach of Section 3.17 or Section 5.09(a) shall have occurred and be continuing for more than 20 Business Days without the Companies commencing activities reasonably likely to cure such Default, at the written request of the Required Lenders through the Administrative Agent, provide to the Lenders within 45 days after such request, at the expense of Borrower, an environmental site assessment report regarding the matters which are the subject of such default, including where appropriate, any soil and/or groundwater sampling, prepared by an environmental consulting firm and in form and substance reasonably acceptable to the Administrative Agent and indicating the presence or absence of Hazardous Materials and the estimated cost of any compliance or Response to address them in connection with such Default.
Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call ▇-▇▇▇-▇▇▇-▇▇▇▇). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.
O.S.H.A. and Environmental Compliance (a) Borrower has duly complied with, and its facilities, business, assets, property, leaseholds, Real Property and Equipment are in compliance in all material respects with, the provisions of the Federal Occupational Safety and Health Act, the Environmental Protection Act, RCRA and all other Environmental Laws; there have been no outstanding citations, notices or orders of non-compliance issued to Borrower or relating to its business, assets, property, leaseholds or Equipment under any such laws, rules or regulations. (b) Borrower has been issued all required federal, state and local licenses, certificates or permits relating to all applicable Environmental Laws. (i) There are no visible signs of releases, spills, discharges, leaks or disposal (collectively referred to as “Releases”) of Hazardous Substances at, upon, under or within any Real Property or any premises leased by Borrower; (ii) to the best of Borrower’s knowledge, there are no underground storage tanks or polychlorinated biphenyls on the Real Property or any premises leased by Borrower; (iii) to the best of Borrower’s knowledge, neither the Real Property nor any premises leased by Borrower has ever been used as a treatment, storage or disposal facility of Hazardous Waste; and (iv) no Hazardous Substances are present on the Real Property or any premises leased by Borrower, excepting such quantities as are handled in accordance with all applicable manufacturer’s instructions and governmental regulations and in proper storage containers and as are necessary for the operation of the commercial business of Borrower or of its tenants.
Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.