Site Design Approval. 8.2.1 As a condition to the execution of an SLA for any Site, LICENSEE must obtain PG&E's prior written approval of the location, size, design, materials, method of installation, and technical specifications (including electrical requirements) for all Signboards and LICENSEE Equipment proposed in an SAF. PG&E's approval of such items shall not be unreasonably withheld, conditioned or delayed, except that PG&E reserves the right, in its sole and absolute discretion, to approve or disapprove the proposed location of the Signboards and LICENSEE Equipment. 8.2.2 Prior to commencing construction of any Signboard, LICENSEE shall provide PG&E with one (1) electronic copy of plans and specifications for the proposed Signboard and LICENSEE Equipment. Within twenty (20) business days after receipt thereof, PG&E shall review the plans and specifications to determine the feasibility of use of the proposed Site for installation of Signboards and LICENSEE Equipment. PG&E's review may include, but not be limited to, an assessment of land rights, as described in Section 4.1.2 hereof and visits to the Site in furtherance of PG&E's review or at LICENSEE's request. 8.2.3 LICENSEE acknowledges that PG&E's review of LICENSEE's plans and specifications is solely for the purpose of protecting PG&E's interests, and shall not create any liability of any kind on the part of PG&E, or constitute a representation on the part of PG&E or any person consulted by PG&E in connection with such review that the plans and specifications submitted by LICENSEE are adequate or appropriate for any purpose, or comply with applicable Legal Requirements. PG&E's approval of LICENSEE's installation plans shall not in any way exempt or excuse LICENSEE from having sole responsibility for the design, preparation, and implementation of all installation work. 8.2.4 PG&E reserves the right to reject any LICENSEE plans and specifications which, in PG&E's sole judgment, would compromise the safety of the general public or PG&E workers or the structural integrity of PG&E Facilities. 8.2.5 LICENSEE shall not in any way interfere or permit any interference with the use of the Site(s) by PG&E. Interference shall include, but not be limited to, any activity by LICENSEE that places any of PG&E's gas or electric facilities in violation of any of the applicable provisions of
Appears in 2 contracts