Smoke Alarms and Detection Devices Sample Clauses

The 'Smoke Alarms and Detection Devices' clause establishes the requirements for installing and maintaining smoke alarms and similar safety devices within a property. Typically, it outlines the party responsible—often the landlord or property owner—for ensuring that these devices are present, functional, and compliant with local safety regulations. For example, it may require regular testing or replacement of batteries and prompt repair or replacement of faulty units. The core purpose of this clause is to enhance occupant safety by reducing the risk of undetected fires and ensuring compliance with legal safety standards.
Smoke Alarms and Detection Devices. We’ll furnish smoke alarms or other detection devices required by law or city ordinance. We may install additional detectors not so required. We’ll test them and provide working batteries when you first take possession of your apartment. Upon request, we’ll provide, as required by law, a smoke alarm capable of alerting a person with a hearing impairment.
Smoke Alarms and Detection Devices. We’ll furnish smoke alarms or other detection devices required by law or city ordinance. We may install additional detectors not so required. We’ll test them and provide working batteries when you first take possession of your dwelling. Upon request, we’ll provide, as required by law, a smoke alarm capable of alerting a person with a hearing impairment. You must pay for and replace batteries as needed, unless the law provides otherwise. We may replace dead or missing batteries at your expense, without prior notice to you. Neither you nor your guests or occupants may disable alarms or detectors. If you damage or disable the smoke alarm or remove a battery without replacing it with a working battery, you may be liable to us under Texas Property Code sec. 92.2611 for $100 plus one month’s Rent, actual damages, and attorney’s fees.

Related to Smoke Alarms and Detection Devices

  • DRUG ABUSE DETECTION AND DETERRENCE 2.18.1 It is the policy of the City to achieve a drug-free workforce and workplace. The manufacture, distribution, dispensation, possession, sale, or use of illegal drugs or alcohol by contractors while on City Premises is prohibited. Contractor shall comply with all the requirements and procedures set forth in the Mayor’s Drug Abuse Detection and Deterrence Procedures for Contractors, Executive Order No. 1-31 (the “Executive Order”), which is incorporated into this Agreement and is on file in the City Secretary’s Office. 2.18.2 Before the City signs this Agreement, Contractor shall file with the Contract Compliance Officer for Drug Testing (“CCODT”): 2.18.2.1 a copy of its drug-free workplace policy; 2.18.2.2 the Drug Policy Compliance Agreement substantially in the form set forth in Exhibit “C”, together with a written designation of all safety impact positions; and 2.18.2.3 if applicable (e.g., no safety impact positions), the Certification of No Safety Impact Positions, substantially in the form set forth in Exhibit “D”. 2.18.3 If Contractor files a written designation of safety impact positions with its Drug Policy Compliance Agreement, it also shall file every 6 months during the performance of this Agreement or on completion of this Agreement if performance is less than 6 months, a Drug Policy Compliance Declaration in a form substantially similar to Exhibit “E”. Contractor shall submit the Drug Policy Compliance Declaration to the CCODT within 30 days of the expiration of each 6-month period of performance and within 30 days of completion of this Agreement. The first 6- month period begins to run on the date the City issues its Notice to Proceed or, if no Notice to Proceed is issued, on the first day Contractor begins work under this Agreement. 2.18.4 Contractor also shall file updated designations of safety impact positions with the CCODT if additional safety impact positions are added to Contractor’s employee work force. 2.18.5 Contractor shall require that its subcontractors comply with the Executive Order, and Contractor shall secure and maintain the required documents for City inspection.

  • Virus Detection You will be responsible for the installation and proper use of any virus detection/scanning program we require from time to time.

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§▇▇-▇▇▇-▇▇▇, ▇▇-▇▇▇-▇▇▇, ▇▇-▇▇▇-▇▇▇, and ▇▇- ▇▇▇-▇▇▇, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.