START OF SERIES PRODUCTION Clause Samples

START OF SERIES PRODUCTION. SUPPLY CHAIN For every new Contract Product, the delivery process is coordinated closely between Supplier and Vitesco Technologies’ locations. The following topics are agreed between Supplier and Vitesco Technologies’ location before the first delivery for serial production. Those agreements include PSM, Packaging Concepts, MMOG/LE, Transport concepts and Definition of contacts. Required capacities for ramp-up are coordinated with the responsible supply chain contact for the specific part and ordering Vitesco Technologies’ locations.

Related to START OF SERIES PRODUCTION

  • Cost of Services Except to the extent specified otherwise in the Agreement, all costs of performing the Services are included in the Contract Price and TOMRA shall not be entitled to any further payment in respect thereof.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Carry Forward to a Subsequent Year If you do not withdraw the excess contribution, you may carry forward the contribution for a subsequent tax year. To do so, you under-contribute for that tax year and carry the excess contribution amount forward to that year on your tax return. The six percent excess contribution penalty tax will be imposed on the excess amount for each year that it remains as an excess contribution at the end of the year. You must file IRS Form 5329 along with your income tax return to report and remit any additional taxes to the IRS.

  • Payment of Services For courses taught at a High School facility utilizing High School teachers who are qualified by the Dallas College using Southern Association of Colleges and Schools Commission on Colleges (SACSCOC) standards to teach college level courses, Dallas College shall pay as follows:

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.