Statements of Probable Construction Cost Sample Clauses

POPULAR SAMPLE Copied 1 times
Statements of Probable Construction Cost. The Design Professional shall prepare and submit an initial Statement of Probable Construction Cost in the UniFormat™ Level I shown in Exhibit F. To the extent the Statement of Probable Construction Cost significantly deviates from the Construction Cost Limitation, the Design Professional shall discuss the deviations with the Owner and prepare and submit a plan to address the differences. As the design progresses, the Design Professional shall prepare and submit updated Statements of Probable Cost in like format.
Statements of Probable Construction Cost. ‌ A. Design Professional shall prepare all Statements of Probable Construction Cost in accordance with guidelines stated herein and Paragraph 5.02 below. All Statements of Probable Construction Cost shall represent the facts existing as of the date of execution of the statement and shall represent the true state of the Design Professional's opinion. At various stages of the design as detailed in Exhibit A, the Design Professional shall submit in writing to the Owner Statements of Probable Construction Cost. The Design Professional shall keep the Owner informed of any adjustments to previous Statements of Probable Construction Cost necessitated by changes in scope, requirements, or market conditions. All Statements of Probable Construction Cost prepared by the Design Professional shall contain such provisions for inflation or deflation as may be reasonably anticipated within the construction industry. The inflation or deflation factor shall be applied based upon the anticipated date of receipt of a contract bid for the Project construction.
Statements of Probable Construction Cost. The Design Professional shall prepare and submit an initial Statement of Probable Construction Cost in the current CSI Master Format Division List. To the extent the Statement of Probable Construction Cost significantly deviates from the Stated Cost Limitation, the Design Professional shall discuss the deviations with the Owner and prepare and submit a plan to address the differences. As the design progresses, the Design Professional shall prepare and submit updated Statements of Probable Cost in like format.
Statements of Probable Construction Cost. All Statements of Probable Construction Cost ("Statements") prepared by ARCHITECT or Estimates of Construction Cost ("Estimates") prepared by DISTRICT shall be in a mutually agreed upon format so they may be directly compared. The Statements and the Estimates shall be independently prepared by ARCHITECT and the DISTRICT at the end of the Schematic Design Phase, at the end of the Design Development Phase, and at 50% and 100% Construction Documents Phases. The ARCHITECT and the DISTRICT will perform a final reconciliation of the Final Statement of Probable Construction Cost and the Estimate of Construction Cost after the documents have been reviewed/approved by the Division of the State Architect (DSA) to allow for any changes made during the DSA review period. The Statements and the Estimates shall identify any contingencies as a separate line item. ARCHITECT shall supply DISTRICT upon request all material relied upon in producing the Statements.

Related to Statements of Probable Construction Cost

  • Opinion of Probable Cost Any opinions of probable Project cost or probable construction cost provided by Engineer are made on the basis of information available to Engineer and on the basis of Engineer’s experience and qualifications and represents its judgment as an experienced and qualified professional engineer. However, since Engineer has no control over the cost of labor, materials, equipment or services furnished by others, or over the contractor(s’) methods of determining prices, or over competitive bidding or market conditions, Engineer does not guarantee that proposals, bids or actual Project or construction cost will not vary from opinions of probable cost Engineer prepares.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • Reports of Foreclosures and Abandonments of Mortgaged Property Following the foreclosure sale or abandonment of any Mortgaged Property, the Servicer shall report such foreclosure or abandonment as required pursuant to Section 6050J of the Code.

  • Compliance with Laws; Payment of Taxes and Liabilities (a) Comply, and cause each other Loan Party to comply, in all material respects with all applicable laws, rules, regulations, decrees, orders, judgments, licenses and permits, except where failure to comply could not reasonably be expected to have a Material Adverse Effect; (b) without limiting clause (a) above, ensure, and cause each other Loan Party to ensure, that no person who owns a controlling interest in or otherwise controls a Loan Party is or shall be (i) listed on the Specially Designated Nationals and Blocked Person List maintained by the Office of Foreign Assets Control (“OFAC”), Department of the Treasury, and/or any other similar lists maintained by OFAC pursuant to any authorizing statute, Executive Order or regulation or (ii) a person designated under Section 1(b), (c) or (d) of Executive Order No. 13224 (September 23, 2001), any related enabling legislation or any other similar Executive Orders, (c) without limiting clause (a) above, comply, and cause each other Loan Party to comply, with all applicable Bank Secrecy Act (“BSA”) and anti-money laundering laws and regulations and (d) pay, and cause each other Loan Party to pay, prior to delinquency, all taxes and other governmental charges against it or any collateral, as well as claims of any kind which, if unpaid, could become a Lien on any of its property; provided that the foregoing shall not require any Loan Party to pay any such tax or charge so long as it shall contest the validity thereof in good faith by appropriate proceedings and shall set aside on its books adequate reserves with respect thereto in accordance with GAAP and, in the case of a claim which could become a Lien on any collateral, such contest proceedings shall stay the foreclosure of such Lien or the sale of any portion of the collateral to satisfy such claim.

  • PRE-CONSTRUCTION PHASE FEE The Pre-Construction Phase Fee is the total compensation payable to Contractor for the performance of Pre-Construction Phase Services, except for Additional Pre-Construction Phase Services approved in advance and in writing by Owner. The Pre-Construction Phase Fee shall be a lump sum amount based on the AACC established in this Agreement. 6.1 Except as specifically allowed by Owner, Contractor shall not be entitled to any increase in the Pre-Construction Phase Fee for any costs, expenses, liabilities or other obligations arising from the performance of Pre-Construction Phase Services. 6.2 Costs associated with the following items are specifically, but not exclusively, included in the establishment of the Pre-Construction Phase Fee: profit and profit sharing; general overhead; salaries and labor; housing and relocation; estimating, scheduling and information management systems and software; contract administration; office expenses; printing and copying; consulting fees; legal or accounting fees; cost of money; taxes; insurance premiums and deductibles; bond costs; purchase or rental of equipment; utilities; travel; per diem; fines or penalties; and damage awards. 6.3 If the scope of the Pre-Construction Phase Services is changed materially, the Pre- Construction Phase Fee shall be equitably adjusted. If the AACC is changed materially before acceptance of the GMP Proposal, the Pre-Construction Phase Fee shall be adjusted in writing in proportion to the change in the AACC. There shall be no adjustments in the Pre-Construction Phase Fee following acceptance of the GMP Proposal. 6.4 For Additional Pre-Construction Phase Services that are approved in advance and in writing by Owner, Contractor shall be entitled to additional compensation computed as follows: 6.4.1 A pre-established lump sum amount; or 6.4.2 The hourly cost of Contractor’s employees or consultants who actually perform the Additional Services based on the employee’s Worker Wage Rate or prorated Monthly Rate plus the actual cost of allowable expenses incurred in the performance of the Additional Pre-Construction Phase Services, plus an overhead and profit markup of ten percent (10%) of the total cost; or 6.4.3 As otherwise agreed in advance and in writing.