Storage of Material Clause Samples

POPULAR SAMPLE Copied 1 times
Storage of Material. The Contractor shall store apparatus, material, supplies, and equipment in such orderly fashion at the site of the Work as will not unduly interfere with the progress of its Work or the work of any other contractor.
Storage of Material. 9.1 The portion of Customer's material left in Supplier's possession under Agreement must be stored with timely care in accordance with applicable law, including the Accounting Act. 9.2 Supplier will only store physical material for the current calendar year and will then return the material to Customer. Supplier must delete digital payroll material following instructions from Customer. 9.3 At the end of a financial year or in case Agreement is terminated - except in case of breach - all physical external material will be returned to Customer after which Customer is responsible for storage. If Customer does not want the physical material returned, Supplier will invoice for storage of all material that are older than six (6) months from the beginning of the current financial year.
Storage of Material. The Contractor firm shall store all the Material/Equipment in the well-maintained Store at his cost. All the services required for maintaining the Stores shall also be at the cost of the Contractor firm. Contractor firm will store and ensure watch & ▇▇▇▇ of the dismantled material where required till the same is handed over to the official in charge.
Storage of Material. The material shall then be moved to a separate storage, placed on hold and stored according to the storage terms stipulated in the contract P61018.
Storage of Material. 20.1 No fittings, equipment, supplies, stores or any other property belonging to the Owner shall be stored or left at the Marina other than as directed by MADECORN LEISURE. 20.2 Except whilst transporting items to or from the Vessel, the Owner must not leave or store any items on the pontoons, pathways, walkways, car parks or anywhere else on the Marina.
Storage of Material. In connection with this work it shall be unlawful for any person or persons, firm or corporation to place or store material of any description whatsoever, or vehicles or other equipment of any nature whatsoever, upon any road or street so as to interfere with the flow of water along the gutters or to interfere with traffic on such road or street without first having obtained approval from the Town Engineer.
Storage of Material. 2.1 CellBank will only store Material that: (a) is not hazardous or harmful when handled by humans; (b) can be appropriately handled in PC1 or PC2 conditions; and (c) can be appropriately stored in research grade storage conditions (e.g., does not require GLP or GMP certified storage). 2.2 In storing the Material, CellBank agrees to make all reasonable efforts to: (a) store the Material in the vapour phase of liquid nitrogen, typically at -150°C or below; (b) store the Material in a manner that is appropriately safe and secure; and (c) return the Material stored by the Depositor in the same condition as it was deposited, allowing for any degradation or change in the Material that may reasonably be expected to follow storage of Material in the above conditions. 2.3 The Depositor represents and warrants to CellBank that: (a) on the Deposit Date, the Material is Viable; (b) the Material is suitable for storage in the vapour phase of liquid nitrogen at -150°C or below; (c) the Material can be appropriately handled in PC1 or PC2 conditions; (d) the Material is not hazardous or harmful when handled by humans; (e) the Material will only be used for Research Purposes; and (f) the Material meets the description provided to CellBank at the time of deposit.
Storage of Material. 2.1 CellBank will only store Material that: (a) is not hazardous or harmful when handled by humans; (b) can be appropriately handled in PC1 or PC2 conditions; and (c) can be appropriately stored in research grade storage conditions (e.g., does not require GLP or GMP certified storage). 2.2 In storing the Material, CellBank agrees to make all reasonable efforts to: (a) store the Material using the relevant refrigeration system, as agreed in writing with the Depositing Individual, that may include: (i) the vapour phase of liquid nitrogen, typically at -150°C or below; (ii) an ultra-low temperature freezer, typically at -80°C or below; (iii) another relevant refrigeration system with an associated typical storage temperature; (b) store the Material in a manner that is appropriately safe and secure; and (c) return the Material stored by the Depositor in the same condition as it was deposited, allowing for any degradation or change in the Material that may reasonably be expected to follow storage of Material in the above conditions. 2.3 The Depositor represents and warrants to CellBank that: (a) on the Deposit Date, the Material is Viable; (b) the Depositor has provided written notification to CellBank of the relevant refrigeration system for the Material; (c) the Material is suitable for storage in the vapour phase of liquid nitrogen at -150°C or below or in another refrigeration system according to the written notification in 2.3.b; (d) the Material can be appropriately handled in PC1 or PC2 conditions; (e) the Material is not hazardous or harmful when handled by humans; (f) the Material will only be used for Research Purposes; and (g) the Material meets the description provided to CellBank at the time of deposit.

Related to Storage of Material

  • Storage of Materials Borrower shall cause all materials supplied for or intended to be utilized in the construction of the Improvements but not affixed to or incorporated into the Property to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards to prevent loss, theft, damage or commingling with other materials not intended to be utilized in the construction of the Improvements.

  • Use of Material The Employer intends using the information provided by the Consultant for purposes including: • professional advice regarding decisions to be made in connection with the subject matter of the services; • inputs into the work of others and the administration of contracts; and • professional inputs into the delivery process Task specific use of information provided by the Consultant is set out in the Task Order.

  • Quality of Materials and workmanship The Contractor shall ensure that the Construction, Materials and workmanship are in accordance with the requirements specified in this Agreement, Specifications and Standards and Good Industry Practice.

  • Supply of Materials The following materials will be supplied by the department Name of Materials Rate. Place of delivery 1.

  • Use of Materials There should be no limitations or restrictions by Union upon a Contractor's choice of materials or design, nor, regardless of source or location, upon the full use and utilization, of equipment, machinery, packaging, precast, prefabricated, prefinished, or preassembled materials, tools or other labor saving devices, subject to the application of the California Public Contract and Labor Codes. Generally, the onsite installation or application of such items shall be performed by the craft having jurisdiction over such work.