Structural Design Criteria - Foundations Clause Samples

Structural Design Criteria - Foundations. Type of foundations required and allowable bearing values for soil and rock shall be as recommended by the Contractor's geotechnical engineer based on the existing subsurface conditions.

Related to Structural Design Criteria - Foundations

  • SCOPE OF ARCHITECT’S BASIC SERVICES 3.1 The Architect’s Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services. § 3.1.1 The Architect shall manage the Architect’s services, research applicable design criteria, attend Project meetings, communicate with members of the Project team, and report progress to the Owner. § 3.1.2 The Architect shall coordinate its services with those services provided by the Owner and the Owner’s consultants. The Architect shall be entitled to rely on, and shall not be responsible for, the accuracy, completeness, and timeliness of, services and information furnished by the Owner and the Owner’s consultants. The Architect shall provide prompt written notice to the Owner if the Architect becomes aware of any error, omission, or inconsistency in such services or information. § 3.1.3 As soon as practicable after the date of this Agreement, the Architect shall submit for the Owner’s approval a schedule for the performance of the Architect’s services. The schedule initially shall include anticipated dates for the commencement of construction and for Substantial Completion of the Work as set forth in the Initial Information. The schedule shall include allowances for periods of time required for the Owner’s review, for the performance of the Owner’s consultants, and for approval of submissions by authorities having jurisdiction over the Project. Once approved by the Owner, time limits established by the schedule shall not, except for reasonable cause, be exceeded by the Architect or Owner. With the Owner’s approval, the Architect shall adjust the schedule, if necessary, as the Project proceeds until the commencement of construction. § 3.1.4 The Architect shall not be responsible for an Owner’s directive or substitution, or for the Owner’s acceptance of non-conforming Work, made or given without the Architect’s written approval. § 3.1.5 The Architect shall contact governmental authorities required to approve the Construction Documents and entities providing utility services to the Project. The Architect shall respond to applicable design requirements imposed by those authorities and entities. § 3.1.6 The Architect shall assist the Owner in connection with the Owner’s responsibility for filing documents required for the approval of governmental authorities having jurisdiction over the Project.

  • Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.

  • Removal of Improvements All alterations, additions and other improvements by Tenant shall become the property of Landlord and shall not be removed from the Premises, unless request is made by Landlord to Tenant to remove those alterations, additions and other improvements which were made without Landlord's approval where such approval was required under this Lease. All moveable trade fixtures, furniture, furnishings and signs installed in the Premises by Tenant and paid for by Tenant, shall remain the property of Tenant and may be removed upon the expiration of the term of this Lease; provided that any of such items as are affixed to the Premises and require severance may be removed only if Tenant repairs any damage caused by such removal and that Tenant shall otherwise comply with all of the terms, conditions and covenants to be performed by Tenant under this Lease with respect to such removal. If Tenant fails to remove such items from the Premises by the expiration of the Lease Term or earlier termination of this Lease, all such trade fixtures, furniture, furnishings and signs shall become the property of Landlord, unless Landlord elects to require their removal, in which case Tenant shall, at its sole cost and expense, promptly remove the same and restore the Premises to its condition on the date of this Lease. The covenants contained in this Section shall survive the expiration of the Lease Term or earlier termination hereof.

  • Design Criteria A/E shall prepare all work in accordance with the latest version of applicable County’s procedures, specifications, manuals, guidelines, standard drawings, and standard specifications. A/E shall prepare each Plans, Specifications, and Estimates (PS&E) package in a form suitable for letting through County’s construction contract bidding and awarding process.

  • Design Criteria and Standards All Projects/Services shall be performed in accordance with instructions, criteria and standards set forth by the Director.