Common use of SUBMITTAL PROCEDURE Clause in Contracts

SUBMITTAL PROCEDURE. a. The Contractor shall include in each submittal a list all materials, equipment, assembly, and installation required to carry out the functions and purposes indicated in the CTO, and to make the systems suitable for the purpose f or wh i c h it is i nt ended . b. Complete SSWPs, detailed installation documentation, and Plans shall be submitted to the SCRRA PTC & Systems Engineer or designate no later than sixty (60) calendar days prior to the scheduled installation date for each location and each subsystem unless otherwise noted in the CTO. c. SSWP submittals shall not be approved in advance of the SCRRA PTC & Systems Engineer or designate approval of the respective Final Design Review Submittal if required by the CTO. d. Complete SSWPs, detailed installation documentation shall be submitted to the SCRRA PTC & Systems Engineer or designate no later than sixty (60) calendar days prior to the scheduled installation date for each location and each subsystem unless otherwise noted in the CTO. e. Product Samples as required in each CTO for SCRRA PTC & Systems Engineer or designate approval. f. A Test Plan shall be submitted no later than s i xt y ( 60) c al en dar days after SCRRA PTC & Systems Engineer or designate approval, outlining the Contractor’s overall testing strategy and schedule including: (1) A list of all tests to be performed for all systems, subsystems, integral equipment and materials to meet the requirements of the CTO.

Appears in 2 contracts

Sources: Contract Agreement, Communication and Signal Systems Installation Services Agreement