Super Structure Sample Clauses
Super Structure. The Super Structure shall be of Earthquake (seismic zone-3) and Fire Resistance reinforced cement concrete framed structures.
Super Structure. The super structure of building shall have RCC framed structure with RCC columns, beams and slabs as per soil test report and the structural design.
Super Structure. The super structure of the building shall have reinforced cement concrete framed structure with reinforced cement concrete columns, beams and slabs.
Super Structure. The Super Structure of the said proposed multistoried new Building shall have reinforce cement, concrete framed structure with reinforced cement, concrete columns, beams and slabs.
Super Structure a. Columns, Beams and other R.C.C. items structural drawings has been enclosed
Super Structure. On completion of the super-structure 0.00% in all respects including wearing coat, bearings, expansion joints, hand rails, crash barriers, road signs & markings, tests on completion etc. complete in all respect. Wearing Coat (a) in case of Overpass- wearing coat including expansion joints complete in all respects as specified and (b) in case of underpass- rigid pavement including drainage facility complete in all respects as specified.
Super Structure. RCC Structure B Wall Finish: i. Plaster of Paris(POP)/ Putty/ Gypsum Plaster Finish; ii. Exterior- Weather Proof paints; C. Flooring: Vitrified tiles in the bedrooms, living / dining room; D. Kitchen: i. Granite Platform with honed edges; ii. Stainless Steel Sink; ii. Dado of Ceramic tiles up to 2ft above the kitchen counter; v. Exhaust point; v. Flooring – Anti Skid Ceramic Tiles;
Super Structure. RCC Structure B Wall Finish: i. Plaster of Paris(POP)/ Putty/ Gypsum Plaster Finish; ii. Exterior- Weather Proof paints;
Super Structure. RCC framed super structure as recommended by Engineers/ Architechs of the Developer on the basis of soil investigation reports.
Super Structure. On completion of the super structure in all respects including wearing coat, bearings, expansion joints, hand rails, crash barriers, road sign & markings tests on completion etc. complete in all respect. 6.34%