Table 1a Clause Samples

Table 1a. Allocation of Commonwealth supported places for designated courses of study for 20141 Cluster No. Funding cluster Number of designated undergraduate places (excluding medical places) for 2014 grant year (EFTSL)2 Number of undergraduate medical places for 2014 grant year (EFTSL) Number of non- research postgraduate places (excluding medical places) for 2014 grant year (EFTSL)3 Number of postgraduate medical places for 2014 grant year (EFTSL) Total number of Commonwealth supported places for 2014 grant year (EFTSL)
Table 1a. Emissions limits for the Type 1 test which apply to the emissions from the 4 phases of a WLTP test Reference mass (RM) (kg) Limit values Mass of carbon monoxide (CO) Mass of total hydrocarbons (THC) Mass of non- methane hydrocarbons (NMHC) Mass of oxides of nitrogen (NOx) Combined mass of hydrocarbons and oxides of nitrogen (THC + NOx) Mass of particulate matter (PM) Particle Number (PN) L1 (mg/km) L2 (mg/km) L3 (mg/km) L4 (mg/km) L2 + L4 (mg/km) L5 (mg/km) L6 (#/km) Category Class PI CI PI CI PI CI PI CI PI CI PI1 CI PI1, CI M ² All 1,000 500 100 ² 68 ² 60 80 ² 170 4.5 4.5 6.0 × 1011 6.0 × 1011 N1 I 50 ” 1,000 500 100 ² 68 ² 60 80 ² 170 4.5 4.5 6.0 × 1011 6.0 × 1011 II 5 1,810 630 130 ² 90 ² 75 105 ² 195 4.5 4.5 6.0 × 1011 6.0 × 1011 III 1,760 < RM 2,270 740 160 ² 108 ² 82 125 ² 215 4.5 4.5 6.0 × 1011 6.0 × 1011 N2 ² All 2,270 740 160 ² 108 ² 82 125 ² 215 4.5 4.5 6.0 × 1011 6.0 × 1011 PI Positive Ignition CI Compression Ignition 1 Positive ignition particulate mass and number limits shall apply only to vehicles with direct injection engines.
Table 1a. Summary of Significant Intercept Drill-hole Collars and Survey information Drill Hole ID Drill Type Prospect Easting (m) Northing (m) Azimuth (deg) Dip (deg) RL (m) Total Depth (m) Assays Table 1b: Summary of Significant Intercept Drill-hole Assays Drill Hole ID From (m) To (m) Interval (m) Au (g/t) Drill Hole ID From (m) To (m) Interval (m) Au (g/t) Annexure D Tenement Schedule Table 1c: Summary of acquisition tenements Tenement Status Grant Expiry Expenditure Rent
Table 1a. Functionality in terms of Applications in relation to key parameters (* of importance; ** priority); a key parameter is of a priority for some functionalities while only of importance for other functionalities. FUNCTIONALITY APPLICATIONS KEY PARAMETERS Cell uptake Optical Properties Electronic Properties Catalytic Activity / Biorecognition Table 1B: Functionality in terms of Performance in relation to key parameters (* of importance; ** priority); a key parameter is of a priority for some functionalities while only of importance for other functionalities. FUNCTIONALITY PERFORMANCE KEY PARAMETERS Solubility/ Dissolution Dispersion Hydrophobicity Table 2: Statistics related with the number of papers/studies of the literature review
Table 1a. Allocation of Commonwealth supported places for designated courses of study for 20141 6 Nursing 1 0 50 0 51 NOTES:
Table 1a. Field Table for Determining Blade Size on Sign Orders – Standard Street Name Signs Blade Size Street Name (Letters & Spaces) Street Type (Letters) # of Lines Font NOTES for Table 1a: Table 1b – Field Table for Determining Blade Size on Sign Orders – Single Word Street Names (no street type) Blade Size Street Name (Letters & Spaces) # of Lines Font NOTES for Table 1b:
Table 1a. Required Analyses for Fiscal year 2012-2013 (July 1, 2012 – June 30, 2013) Table 1B – Required Analyses for Fiscal year 2013-2014 (July 1, 2013 – June 30, 2014) Table 1C – Required Analyses for Fiscal year 2014-2015 (July 1, 2014 – June 30, 2015) Table 2 – Organics List for Yolo County Central Landfill Attachment A Sample Agreement Attachment B Monitoring Reporting Program, selected pages Attachment C County’s current required EDD format Attachment D Cost Proposal Form CATEGORY COMPOUND ANALYTICAL METHOD 1 GDS TOTAL LAND- FILL BIO- REACTOR STORM WATER DOMESTIC WELL Septic Residuals NO. OF ANALYSES Volatile Organic Compounds (VOCs) 2 8260B 12 126 3 0 0 0 141 Secondary Organic Compounds (SOCs) 3 500 Series 0 0 0 0 1 0 1 COC Organics Semivolatile Organic Compounds 3 8270C 0 12 3 0 0 0 15 Organophosphorus Compounds 3 8141A 0 12 3 0 0 0 15 Chlorinated Herbicides 3 8151A 0 12 3 0 0 0 15 Misc. Metals Dissolved Boron 4 6010B 26 0 0 0 0 0 26 Dissolved Chromium (VI) 4 7196A 0 0 0 0 0 0 0 Inorganics Ammonia 350.1 0 118 3 0 0 0 121 Bicarbonate 2320B 2 118 3 0 1 0 124 Carbonate 2320B 0 34 3 0 1 0 38 Chemical Oxygen Demand 410.4 0 6 3 0 0 0 9 Chloride 300.0A 2 118 3 0 1 0 124 Nitrate (as Nitrogen) 300.0A 2 118 3 0 1 0 124 Sulfate 300.0A 2 118 3 0 1 0 124 Sulfide 9030 1 17 3 0 0 0 21 Total Alkalinity 2320B 0 118 3 0 1 0 122 Total Dissolved Solids 160.1 22 118 3 0 1 0 144 Total Kjeldahl Nitrogen 351.2 0 113 3 0 0 0 116 CATEGORY COMPOUND ANALYTICAL METHOD 1 GDS TOTAL LAND- FILL BIO- REACTOR STORM WATER DOMESTIC WELL Septic Residuals NO. OF ANALYSES Total Organic Carbon 9060 0 0 3 10 0 0 13 Total Sulfide 376.2 1 0 3 0 0 0 4 SOIL - Inorganics pH - soil sample 4500A 3 0 0 0 0 0 3 LANDFILL GAS Volatile Organic Compounds - see Table 2 EPA 2 to 15 0 0 0 0 0 0 0 ▇▇▇ = Total Petroleum Hydrocarbons COC = Constituents of Concern WDRs = Waste Discharge Requirements MRP = Monitoring and Reporting Program 1 = These methods or their equivalents should be used as specified for solid waste water quality monitoring methods.
Table 1a. Allocation of Commonwealth supported places for designated courses of study for 20141 1 Law, accounting, administration, economics, commerce 100 0 43 0 143 7 Engineering, science, surveying 125 0 103 0 228 NOTES:
Table 1a. Lifelong Learning Programme - Mobility - Subsistence - Maximum rates (in EUR) per host country and duration of stay. (For Erasmus student mobility see Table 1b) Excluding travel and visa costs Including travel and visa costs Total amount first week Total amount Additional amount per week (wks 3 - 12)* Total amount for 13 full weeks ** Additional amount per week (wks 14 - 45)* 1 day 2 days 3 days 4 days 5 days 6 days One week (7 days) Two weeks BE 170 340 510 680 850 1.020 1.190 1.666 190 4.286 190 BG 110 220 330 440 550 660 770 1.078 123 2.852 123 CZ 150 300 450 600 750 900 1.050 1.470 168 3.796 168 DK 230 460 690 920 1.150 1.380 1.610 2.254 258 5.806 258 DE 160 320 480 640 800 960 1.120 1.568 179 4.023 179 EE 130 260 390 520 650 780 910 1.274 146 3.342 146 EL 160 320 480 640 800 960 1.120 1.568 179 4.064 179 ES 170 340 510 680 850 1.020 1.190 1.666 190 4.293 190 FR ▇▇▇ ▇▇▇ ▇▇▇ 800 1.000 1.200 1.400 1.960 224 5.033 224 IE 190 380 570 760 950 1.140 1.330 1.862 213 4.766 213 IT 190 380 570 760 950 1.140 1.330 1.862 213 4.793 213 CY 150 300 450 600 750 900 1.050 1.470 168 3.788 168 LV 130 260 390 520 650 780 910 1.274 146 3.382 146 LT 130 260 390 520 650 780 910 1.274 146 3.348 146 LU 170 340 510 680 850 1.020 1.190 1.666 190 4.294 190 HU 140 280 420 560 700 840 980 1.372 157 3.607 157 MT 140 280 420 560 700 840 980 1.372 157 3.539 157 NL 180 360 540 720 900 1.080 1.260 1.764 202 4.528 202 AT 180 360 540 720 900 1.080 1.260 1.764 202 4.538 202 PL 130 260 390 520 650 780 910 1.274 146 3.301 146 PT 150 300 450 600 750 900 1.050 1.470 168 3.775 168 RO 120 240 360 480 600 720 840 1.176 134 3.104 134 SI 160 320 480 640 800 960 1.120 1.568 179 4.055 179 SK 140 280 420 560 700 840 980 1.372 157 3.539 157 FI 210 420 630 840 1.050 1.260 1.470 2.058 235 5.293 235 SE 210 420 630 840 1.050 1.260 1.470 2.058 235 5.295 235 UK 230 460 690 920 1.150 1.380 1.610 2.254 258 5.829 258 IS 180 360 540 720 900 1.080 1.260 1.764 202 4.756 202 LI 260 520 780 1.040 1.300 1.560 1.820 2.548 291 6.560 291 NO 260 520 780 1.040 1.300 1.560 1.820 2.548 291 6.563 291 CH 260 520 780 1.040 1.300 1.560 1.820 2.548 291 6.507 291 HR 160 320 480 640 800 960 1.120 1.568 179 4.056 179 TR 140 280 420 560 700 840 980 1.372 157 3.693 157 * For weeks 3-12 and 14-45, additional full weeks are counted on the basis of the amount indicated in the columns 'Additional amount for weeks 3-12 and 14-45'. ** This includes a special amount covering travel and visa costs as they are included from 13 full weeks onwa...
Table 1a. Old Bus(es) to be Replaced Bus Fleet I.D. Bus VIN Chassis Model Year License Engine Model Yr if repowered w/ new engine Disposal Site TABLE 1B. New Replacement Bus(es) Bus Fleet I.D. Make (Bus or Infrastructure) Seats Bus Model Year Expected Delivery Date Grant Amount Total Replacement Bus cost includes delivery, taxes { } . Alternative Fuel Infrastructure, if any: { } . TABLE 1C. Bus(es) to be Retrofitted Bus Fleet I.D. Bus VIN Bus Model Year Bus License Plate Make/ Model Grant Amount for Retrofit Expected Delivery Date Total grant funding for retrofit(s), including regeneration or cleanout infrastructure and equipment, and all reimbursable installation and maintenance contract costs, including delivery and taxes: { } . This concludes Attachment 1 Project No: { } Grantee: { } The following special conditions supersede conflicting terms and conditions found elsewhere in this Agreement, except for Attachment 1.