TASKS TO BE ACCOMPLISHED Clause Samples

TASKS TO BE ACCOMPLISHED. A. CABE Parent Specialist will provide: 1. Twelve (12) 1-hour 30-minute training workshops on topics in Spanish including three onsite sessions, from the California Association for Bilingual Education’s (▇▇▇▇'▇) Project 2INSPIRE Awareness Level for the 2022-2023 school year with Conejo Valley USD held in a hybrid format. Training workshops dates TBD. 2. CABE will provide an electronic copy (via Google link) of the Awareness level curriculum during the 2022-2023 school year. Project 2INSPIRE Certified Parents will conduct workshops using the Project 2INSPIRE/CABE Level 1 “Awareness” Curriculum. These sessions will be scheduled per a timeline approved by District Representative. Project 2INSPIRE Certified Parents will work with the contact district to ensure that all activities are completed and conducted in the best possible manner. This district site person will provide all relevant information so that the program is carried out as designed to ensure positive outcomes for parents, students and the school community.
TASKS TO BE ACCOMPLISHED. A. CABE Parent Specialist will provide:
TASKS TO BE ACCOMPLISHED. ▇. ▇▇▇▇ Parent Specialist will provide: 1. Sixteen (16) sessions, 2-3-hour onsite training workshops in Spanish, on topics from ▇▇▇▇’▇ P2i Expert Level during the 2023-2024 school year with Newark USD. Training workshops dates TBD.
TASKS TO BE ACCOMPLISHED. ▇. ▇▇▇▇ Parent Specialist will provide: 1. Two Cohorts (Spanish and English) of 12 sessions each, 2-3-hour training workshops on topics from ▇▇▇▇’▇ P2i Mastery Level during Spring of 2023-2024 school year with Azusa USD held onsite. Training dates TBD. 2. Two (Spanish and English) Cohorts of 16 sessions, 2–3-hour training workshops on topics from ▇▇▇▇'▇ P2i Expert Level during Summer of 2023 school year with Azusa USD held in onsite. Training dates TBD.
TASKS TO BE ACCOMPLISHED. Pumping and Disposal Services: The bidder will manage the removal and disposal of waste from various systems, as detailed in the previously listed categories above. • Ensure all waste is handled, transported, and disposed of in compliance with relevant environmental regulations. • Maintain proper documentation and records of all services performed. • Adhere to industry standards and best practices for waste management. • Services will be provided On-Site • The Bidder should use appropriate tools, such as pumps and transport vehicles, and adhere to regulatory standards for waste disposal.
TASKS TO BE ACCOMPLISHED. 1. Vendor will provide all labor, materials, equipment and supervision to complete project. 2. Vendor will remove and replace three humidifiers · Provide insulator to repair duct & pipe insulation where needed · Tie humidifiers into existing BAS Control System · Provide labor to start unit and check operation 3. Vendor will provide three steam injection humidifiers as listed below: · Neptronic Model SKD Direct Steam Injection Humidifiers · Stainless Steel Grid Type Manifolds · Electronic Steam Controllers · Steam Valves 9-13 PSI Actuators (VG7443PT-822E00) · F&T Steam Traps, Steam Separators, & Wye Strainers · Steam Pressure Regulators (Model 152A, 1-1/2”) to regulate steam from 30 psi to 15 psi. C.1 Place of Performance – The VAMC located at ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇, Huntington WV 25704
TASKS TO BE ACCOMPLISHED. The following specific tasks should be undertaken by the expert: As specified in the Annex ITerms of Reference.
TASKS TO BE ACCOMPLISHED. REPORTS AND DELIVERABLES 4 ● 11 ● 16
TASKS TO BE ACCOMPLISHED. The expert must assist the contracting party in monitoring the implementation of actions under the EEPR1. This consists of assessing the state and progress of action implementation and constitutes review [number]. The expert's work must be based on the work description(s) and periodic reports of: grant Commission decision(s): Depending on the action's complexity and progress, the following tasks shall be executed, as specified in the Notice of Call for expressions of interest2: The remote work to prepare the on-site technical audits; It may include reading and analysis of the grant decision(s) and other background information and deliverables, drafting the report(s)). The expert may also be required to attend intermediate and periodic project meeting(s) and ad-hoc review meeting(s). The contracting party will require the expert to carry out on-site technical audits to verify whether critical milestones and the objectives of the Action are being met, whether the environmental and procurement procedures were correctly carried out, identify any deviations and assist in obtaining detailed explanations from the beneficiaries of the grant decision. The expert must send the contracting party a technical report for each grant decision, including the confirmation whether the action has been properly implemented in a cost efficient manner and the expert's recommendations. 1 Regulation (EC) No 663/2009 of the European Parliament and of the Council of 13 July 2009 establishing a programme to aid economic recovery by granting Community financial assistance to projects in the field of energy as amended by Regulation (EU) No 1233/2010 2 2015/S 177-319870 Point 7
TASKS TO BE ACCOMPLISHED. ▇. ▇▇▇▇ Parent Specialist will provide: