Temporary Works. The Contractor must obtain written permission from the Engineer before construction of any temporary works may commence. Temporary works will include the following: (a) Signage and markings for the surface movement of aircraft and vehicles (b) Electrical connections to maintain circuits for the safe operation of elements. (c) Placing and removal of barricades. (d) All facilities within the Contractor’s construction camp. The site is to be negotiated with ACSA and shall be fenced off using 2,0 m high diamond mesh fencing material. The design shall comply with the specifications where, provided in these documents and all statutory requirements such as the Occupational Health and Safety Act and Regulations. The area is to be reinstated upon completion. (e) Temporary backfilling of excavations (at the end of each work shift) within the safety zone next to the runway and taxiways. The backfilling must comply with ICAO requirements. (f) Temporary backfilling of excavations (at the end of each work shift) within the safety zone next to the taxiways. The backfilling must comply with ICAO requirements.
Appears in 2 contracts
Sources: Engineering & Construction Contract, Nec3 Engineering & Construction Contract