Testing procedures after completion Clause Samples

Testing procedures after completion. 10.2.1 Employer shall, in accordance with the post completion test scheme approved by the joint coordination leading authority, organize the managing personnel, operation maintenance personnel and other preparatory work. 10.2.2 Contractor, according to the approved plan of the post completion test, provides all electricity, water, power, raw materials, auxiliary materials, consumpted materials and other test conditions, complete equipment, facilities, tools and other equipment as agreed in the plan, and other preparatory work shall be completed by Contractor. 10.2.3 Contractor shall, upon approval of the approved post completion test plan, organize the test in by procedures of post completion test and its testing conditions of any part inside this Project, between engineering and of this Project. 10.2.4 Joint coordinate and leading institution is in charge of the organization and the implementation of resource conditions, test conditions, safety facilities condition, fire control facilities, emergency treatment facilities conditions and related measures of the Project and any part of it, ensuring the record instrument, special recording form in its integrity and the number of it being sufficient. 10.2.5 Notice of date of post completion test. Employer notifies Contractor of the date of the test after completion within 15 days after the date of acceptance of the project, except as otherwise provided in the special provisions. Contract Number: SMX-JSZH-[ 2019 ]-[ 034 ]

Related to Testing procedures after completion

  • Testing Procedures The following test procedure shall apply to all urine tests administered to bargaining unit employees: a. Urine specimens shall be collected at the approved laboratory as stated below in section (e), or at an accredited medical facility when necessary after an accident. b. The employee shall not be observed when the urine specimen is given. c. All specimen containers, vials or bags used to transport the samples shall be sealed with evidence tape and labeled in the presence of the employee. d. The testing shall be done by another approved laboratory. e. The employer shall choose the testing/collection facility to be utilized for toxicology testing on a yearly basis. f. The following standards shall be used to determine what levels of detected substances shall be considered positive. Note: - These are current levels subject to change by Federally Mandated Regulations. Current Federal Regulations shall be controlling in case of change or conflict: DRUG SCREENING TEST CONFIRMATION Amphetamines 500 ng/ml Amphetamine 250 ng/ml GC-MS Marijuana Metabolites 50 ng/▇▇ ▇▇▇▇▇-THC 15 ng/ml GC-MS Cocaine Metabolites 150 ng/ml Metabolites 100 ng/ml GC-MS Opiates Morphine 2,000 ng/ml 2,000 ng/ml GC-MS PCP 25 ng/ml PCP 25 ng/ml GC-MS MDMA 500 ng/ml 250 ng/ml Alcohol .08 Breath .04 Breath – Employees with CDL .02 - .039 Breath - Employees with CDL will be removed from service for 24 hrs. g. Tests which are below the levels set forth above shall be determined as negative. If test results are negative, all non-required documentation regarding supervisors' observations and testing will be destroyed. h. At the time the urine specimen is collected two samples will be taken. One sample will be sent to the laboratory to be tested at the employer's expense. If the first sample tests positive then upon written request by the employee within twenty-four

  • Standard Operating Procedures Over approximately the past eight years, the Parties have been supplying select Products to one another for use in the operation of their respective businesses within the United States of America, Canada and Mexico. The Parties developed and been following certain standard operating procedures in connecting with, among other topics, forecasting, production planning, ordering, delivering and resolving claims on the Products supplied to one another (the “Current SOPs”). The Parties will be updating their respective business systems over the next six months, and the updates to these business systems will require the Parties to modify the Current SOPs. Once the Parties have completed the updates to the business systems and agreed on the necessary modifications to the Current SOPs, the Parties will sign a written amendment to this Agreement appending the updated standard operating procedures (the “Updated SOPs”). Until the Parties have signed a written amendment appending the Updated SOPs, the parties will continue to follow the Current SOPs. The Parties will comply with the applicable SOPs in connection with the purchase and sale of products identified in a Purchase Schedule. The Parties may add terms and conditions to, and amend the terms and conditions of, the SOP in a Purchase Schedule, but any additional and amended terms and conditions in a Purchase Schedule supplementing and modifying the SOP will only apply the specific products identified in that Purchase Schedule for its duration.

  • Testing Procedure Limitations The Asset Representations Reviewer will only be required to perform the testing procedures listed under “Tests” in Schedule A, and will have no obligation to perform additional procedures on any Subject Lease or to provide any information other than a Review Report indicating for each Subject Lease whether there was a Test Pass or a Test Fail for each Test, or whether the Subject Lease was a Test Complete and the related reason. However, the Asset Representations Reviewer may provide additional information about any Subject Lease that it determines in good faith to be material to the Review.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • PROGRESS AND COMPLETION 8.2.1 All time limits stated in the Contract Documents are material terms and time is the essence of the Contract. A failure by Contractor to do what is required by the time specified in the Contract Documents is a breach of the contract. 8.2.2 The Contractor shall begin the Work on the date of commencement as defined in 8.2.3 If in the sole opinion of the State, the Contractor fails to commence work on the project or to complete the work of said project within the time specified above, or to prosecute the work in such a manner that it appears that the completion date can be assured, the State shall have the right to notify the Contractor by Certified Mail that the terms of the Contract have been violated, and that effective immediately the Contract is terminated and the State has the right to and in fact is taking over and attending to completion of the project without prejudice to the State's remedies for any losses sustained