TESTING PROGRAMME Clause Samples

The Testing Programme clause outlines the procedures and requirements for testing products, services, or systems to ensure they meet specified standards or contractual obligations. It typically details the scope of testing, the methods to be used, the schedule for conducting tests, and the responsibilities of each party involved. For example, it may require the supplier to perform certain quality checks before delivery or mandate joint testing sessions with the client. The core function of this clause is to establish a clear framework for verifying compliance and performance, thereby reducing the risk of defects or misunderstandings about quality expectations.
TESTING PROGRAMME. (a) The Seller shall provide to the Purchaser, on an on-going basis, all relevant information regarding its programme for testing the Complex and the schedule thereof. Not less than thirty (30) Days prior to the commencement of such test programme, the Seller shall deliver to the Purchaser in writing the final testing programme for the Complex, including a tentative schedule for conducting all tests required under and in relation to this Article VIII. The Seller shall advise the Purchaser in writing of any changes in its final schedule for the testing programme not less than seven (7) Days prior to the commencement of such tests. Such final schedule shall not materially increase or advance the timing of the Purchaser’s obligations under this Agreement, without the prior written consent of the Purchaser. If the schedule for any tests required by Section 8.2 or 8.3 is adjusted after the Seller has provided the Purchaser with the final testing programme schedule, then the Seller shall advise the Purchaser not less than forty-eight (48) hours prior to the commencement of any such tests. On each Day beginning with the Day on which testing commences, the Seller shall provide the Purchaser with a schedule of the tests to be conducted on the following Day or Days (if such tests will continue for more than one (1) Day). All testing of the Complex shall satisfy the Commissioning Tests and Reliability Run Test provided in this Article VIII and Schedule 7. The Purchaser and its representatives shall have the right to be present at and observe the Commissioning Tests (including the Reliability Run Test) and any retests thereof. (1) If the Purchaser is unable to accommodate the schedule for any of the Commissioning Tests as provided by the Seller, the Purchaser will give the Seller notice within forty-eight
TESTING PROGRAMME. The objectives of the tests are to demonstrate the performance and operational characteristics of each Unit in the Generation Facility in accordance with this Agreement.
TESTING PROGRAMME. ‌ K-1 The testing programme must include a complete, but general description of the tests to be conducted on the Delivery in the course of the project, cf. clause 8 of the Contract. Testings concern • Factory test • Installation testPartial delivery test • Acceptance testService level test • [Specific tests/approval procedures for associated services ] • [Specific tests/approval procedures in case of change tasks, including Op- tions] K-2 There must be traceability between the testing programme and • Appendix 3 • The testing regulations • The testing plans

Related to TESTING PROGRAMME

  • Training Program It is agreed that there shall be an Apprenticeship Training Program, the provisions of which are set forth in Exhibit "D", which is attached hereto and forms part of this Agreement.

  • Programme 13.1 Within the time stated in the Contract Data, the Contractor shall submit to the Engineer for approval a Programme showing the general methods, arrangements,' order and timing for all the activities for the construction of works. 13.2 The program shall be supported with all the details regarding key personnel, equipment and machinery proposed to be deployed on the works for its execution. The contractor shall submit the list of equipment and machinery being brought to site, the list of key personnel being deployed, the list of machinery/equipment being placed in field laboratory and the location of field laboratory along with the Programme.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.