The Interconnection Point Sample Clauses

The Interconnection Point. 2.1 The Customer is entitled pursuant to the Rules of Operation, Technical Conditions and this Agreement to use for injection of natural gas into the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED] and for withdrawal of natural gas from the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED]. 2.2 If the use of Storage Services by the Customer leads to fees for the cross-border use of storage facilities pursuant to the valid E-Control Regulation Commission Ordinance setting the Natural Gas System Charges (Gas System Charges Ordinance 2013) as may be amended from time to time, these fees shall be paid by the Customer. 2.3 For every natural gas quantity injected to the Storage Facility from the Interconnection Point with the Virtual Trading Point Austria (and also for transferred natural gas quantities that have been previously injected from the Interconnection Point with the Virtual Trading Point Austria) and consequently withdrawn to the Interconnection Point with the Transmission System the SSO shall apply an additional charge as published in the SSO´s Price list.
The Interconnection Point. 2.1 The Customer is entitled pursuant to the Rules of Operation, Technical Conditions and this Agreement to use for injection of natural gas into the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED] and for withdrawal of natural gas from the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED].
The Interconnection Point. 3.1 The Customer is entitled pursuant to this Agreement to use for withdrawal of natural gas from the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED]. The Customer is entitled pursuant to this Agreement to use for injection of natural gas into the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED]. The withdrawal and injection of natural gas shall be governed by the Rules of Operation (the Article 8) and the Technical Conditions. 3.2 If the use of the Storage Services by the Customer leads to fees for the cross-border use of storage facilities pursuant to the valid E-Control Regulation Commission Ordinance setting the Natural Gas System Charges (Gas System Charges Ordinance 2013) as may be amended from time to time, these fees shall be paid by the Customer.
The Interconnection Point. 2.1 The Customer is entitled to use for injections of natural gas into the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED] and for withdrawals of natural gas from the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED]. 2.2 If the use of Storage Services by the Customer leads to fees for the cross-border use of storage facilities pursuant to the valid E-Control Regulation Commission Ordinance setting the Natural Gas System Charges (Gas System Charges Ordinance 2013) as may be amended from time to time, these fees shall be paid by the Customer. 2.3 For every natural gas quantity injected to the Storage Facility from the Interconnection Point with the Virtual Trading Point Austria (and also for transferred natural gas quantities that have been previously injected from the Interconnection Point with the Virtual Trading Point Austria) and consequently withdrawn to the Interconnection Point with the Transmission System the SSO shall apply an additional charge as published in the SSO´s Price list.
The Interconnection Point. [s] 3.1 The Customer is entitled pursuant to this Agreement to use for withdrawal of natural gas from the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED]. The Customer is entitled pursuant to this Agreement to use for injection of natural gas into the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED]. The withdrawal and injection of natural gas shall be governed by the Rules of Operation and the Technical Conditions. 3.2 If the use of the Storage Services by the Customer leads to fees for the cross-border use of storage facilities pursuant to the valid E-Control Regulation Commission Ordinance setting the Natural Gas System Charges (Gas System Charges Ordinance 2013) as may be amended from time to time, these fees shall be paid by the Customer. The Customer does not bear cross-border fees which may arise from initial or final title transfers with the SSO under this Contract. 3.3 For every natural gas quantity injected to the Storage Facility from the Interconnection Point with the Virtual Trading Point Austria (and also for transferred natural gas quantities that have been previously injected from the Interconnection Point with the Virtual Trading Point Austria) and consequently withdrawn to the Interconnection Point with Transmission System the Storage System Operator shall apply an additional charge as published in the Storage System Operator’s Price List.
The Interconnection Point. 2.1 The Customer is entitled pursuant to this Agreement to use for injection of natural gas into the Storage Facility the Interconnection Point with the Interconnection Point with VTP Slovakia and for withdrawal of natural gas from the Storage Facility the Interconnection Point with the Interconnection Point with VTP Slovakia. This shall mean the interconnection with the Virtual Trading Point as defined in the Operational Order of eustream, a.s. as the transmission system operator (“TSO”). The SSO is obliged to offtake/deliver the natural gas at Interconnection Point – VTP Slovakia and carry out the nomination processes with the TSO related to connection to the Storage Facility and shall bear all charges imposed by the TSO associated with this process. The natural gas injected into the Storage Facility through the Interconnection Point – VTP Slovakia shall be withdrawn only through the Interconnection Point – VTP Slovakia. 2.2 If the use of Storage Services by the Customer leads to fees for the cross-border use of storage facilities pursuant to the valid E-Control Regulation Commission Ordinance setting the Natural Gas System Charges (Gas System Charges Ordinance 2013) as may be amended from time to time, these fees shall be paid by the Customer. 2.3 For every natural gas quantity injected to the Storage Facility from the Interconnection Point with the Virtual Trading Point Austria (and also for transferred natural gas quantities that have been previously injected from the Interconnection Point with the Virtual Trading Point Austria) and consequently withdrawn to the Interconnection Point with the Transmission System the SSO shall apply an additional charge as published in the SSO´s Price list.
The Interconnection Point. 2.1 The Customer is entitled pursuant to the Rules of Operation, Technical Conditions and this Agreement to use for injection of natural gas into the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED] and for withdrawal of natural gas from the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED]. [for Combination 3 also]: The Customer is obliged to make relevant nominations at the Entry/Exit Interconnection Point ▇▇▇▇▇▇▇▇▇▇ in Austria operated by the correspondent Austrian transmission system operator. The Customer bears all charges imposed by the correspondent Austrian transmission system operator. The SSO is obliged to offtake/deliver the natural gas at the Entry/Exit Interconnection Point ▇▇▇▇▇▇▇▇▇▇ in Slovakia operated by the eustream, a.s. and to make relevant nominations with the eustream, ▇.▇.▇▇ relation to cross-border connection to/from the Storage Facility. The SSO bears all charges imposed by ▇▇▇▇▇▇▇▇, a.s. 2.2 If the use of Storage Services by the Customer leads to fees for the cross-border use of storage facilities pursuant to the valid E-Control Regulation Commission Ordinance setting the Natural Gas System Charges (Gas System Charges Ordinance 2013) as may be amended from time to time, these fees shall be paid by the Customer. 2.3 For every natural gas quantity injected to the Storage Facility from the Interconnection Point with the Virtual Trading Point Austria (and also for transferred natural gas quantities that have been previously injected from the Interconnection Point with the Virtual Trading Point Austria) and consequently withdrawn to the Interconnection Point with the Transmission System the SSO shall apply an additional charge as published in the SSO´s Price list.
The Interconnection Point. 2.1 The Customer is entitled pursuant to the Rules of Operation, Technical Conditions and this Agreement to use for injection of natural gas into the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED] and for withdrawal of natural gas from the Storage Facility the Interconnection Point with [MISSING DATA TO BE INSERTED]. [for Combination 3 also]: The Customer is obliged to make relevant nominations at the Entry/Exit Interconnection Point ▇▇▇▇▇▇▇▇▇▇ in Austria operated by Gas Connect Austria GmbH. The Customer bears all charges imposed by GCA. The SSO is obliged to offtake/deliver the natural gas at the Entry/Exit Interconnection Point ▇▇▇▇▇▇▇▇▇▇ in Slovakia operated by the TSO and to make relevant nominations with the TSO in relation to cross-border connection to/from the Storage Facility. The SSO bears all charges imposed by eustream, a.s. The Customer is not entitled to use any other Delivery Point for injection and/or withdrawal based on this Agreement.

Related to The Interconnection Point

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Onvoy’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and KDL, KDL, at its own expense, shall: 2.4.1.1 provide its own facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA; and/or 2.4.1.2 obtain transport to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA (a) from a third party, or, (b) if Verizon offers such transport pursuant to this Agreement or an applicable Verizon Tariff, from Verizon. 2.4.2 Where the Parties use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and KDL, Verizon, at its own expense, shall provide its own facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA. 2.4.3 Prior to establishing any Two-Way Interconnection Trunks, KDL shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Seconds (Hundred Call Seconds) information, and the Parties shall mutually agree on the appropriate initial number of End Office and Tandem Two-Way Interconnection Trunks and the interface specifications at the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA at which the Parties interconnect for the exchange of traffic. Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One- Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.4 On a semi-annual basis, KDL shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that KDL anticipates Verizon will need to provide during the ensuing two (2) year period for the exchange of traffic between KDL and Verizon. KDL’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Seconds (Hundred Call Seconds) equal to five (5). Either Party may disconnect End Office Two-Way Interconnection Trunks that, based on reasonable engineering criteria and capacity constraints, are not warranted by the actual traffic volume experienced. 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of ▇▇▇▇-▇▇▇▇▇▇▇▇▇ B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of ▇▇▇▇-▇▇▇▇▇▇▇▇▇ B.01 during the average time consistent busy hour. Verizon and KDL shall engineer Two-Way Interconnection Trunks using Telcordia Notes on the Networks SR 2275 (formerly known as BOC Notes on the LEC Networks SR-TSV-002275). 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three

  • Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.

  • CONNECTING TRANSMISSION OWNER’S INTERCONNECTION FACILITIES As depicted on the one-line diagram in Attachment 3, the Connecting Transmission Owner’s Interconnection Facilities consist of the following constructed or installed between the POI and PCO, as well as metering and telecommunications located at the ▇▇▇▇▇ Solar Collector Substation.