Time Schedules. We estimated that the fieldwork can be started shortly after authorization is received. The actual drilling work is expected to take about 1 week, assuming no delays in permission to access the sites. The laboratory testing will take approximately 1 to 2 weeks. Weather permitting, we anticipate submitting a draft report about 2 weeks after completion of all laboratory testing. A final report will be issued about 1 week after receiving your review comments. We appreciate the opportunity to submit this proposal and look forward to being of service to you on this project. Very truly yours, ASSOCIATED TESTING LABORATORIES, INC. ▇▇▇▇▇ ▇. ▇▇▇▇▇, Ph.D., P.E. Director, Geotechnical Services Enclosures: Figure 1: Proposed Improvement Alignment Figure 2: Proposed Boring Location Itemized Geotechnical Fee Estimate Project Proposal: W Sycamore Road Improvements Fort Bend County, Texas Proposal No.: GP2020-0710 W Sycamore Road (From S. Post Oak to S Curve at Edgewood Trail) ATL Proposal No. GP2020-0710 August 19, 2020 Mobilization/Demobilization (Truck Rig) 1 LS $500.00 $500.00 Technician for Staking, Utilities Clearance, Coordination 8 hrs. $50.00 $400.00 Soil Drilling and Sampling (continuous; <50') 90 ft. $21.00 $1,890.00 Soil Drilling and Sampling (continuous; >50') 0 ft. $24.00 $0.00 Soil Drilling and Sampling (<50' intermittent) 0 ft. $18.00 $0.00 Soil Drilling and Sampling (intermittent; over 50' ) 0 ft. $21.00 $0.00 Grouting Holes 90 ft. $7.00 $630.00 Piezometer Installation 0 ft. $16.00 $0.00 Piezometer Abandonment 0 ft. $14.00 $0.00 24-Hour, 7- and 30-day PZ Water Level Readings 0 hrs. $50.00 $0.00 Vehicle Charge 8 hrs. $10.00 $80.00 Mobilization/Demobilization (ATVrig), Surcharge 0 LS $132.00 $0.00 Soil Drilling and Sampling (Surcharge for drilling using ATV rig) 0 ft. $6.00 $0.00 Pavement Coring and Patching (up to 6 inches thick) 6 ea. $150.00 $900.00 Pavement Coring and Patching (>6 inches thick) 36 in. $9.00 $324.00 $4,724.00 Moisture Content (ASTM D-2216) 48 ea. $9.00 $432.00 Atterberg Limits (ASTM D-4318) 18 ea. $60.00 $1,080.00 Passing No. 200 Sieve (ASTM D-1140) 18 ea. $46.00 $828.00 Unconfined Compression (ASTM D-2166) 6 ea. $44.00 $264.00 Unconsolidated-Undrained Triaxial Test (ASTM D-2850) 16 ea. $61.00 $976.00 SUBTOTAL $3,580.00 Senior Engineer-Project Manager (P.E.) 4 hrs. $150.00 $600.00 Project Engineer (P.E.) 16 hrs. $105.00 $1,680.00 Civil Engineer 16 hrs. $83.00 $1,328.00 Draftsman 24 hrs. $60.00 $1,440.00 Word Processor 24 hrs. $60.00 $1,440.00 SUBTOTAL $6,488.00
Appears in 2 contracts
Sources: Professional Services, Professional Services
Time Schedules. We estimated that the fieldwork can be started shortly after authorization is received. The actual drilling work is expected to take about 1 week, assuming no delays in permission to access the sites. The laboratory testing will take approximately 1 to 2 weeks. Weather permitting, we anticipate submitting a draft report about 2 4 weeks after completion of all laboratory testing. A final report will be issued about 1 week after receiving your review comments. We appreciate the opportunity to submit this proposal and look forward to being of service to you on this project. Very truly yours, ASSOCIATED TESTING LABORATORIES, INC. ▇▇▇▇▇ ▇. ▇▇▇▇▇, Ph.D., P.E. Director, Geotechnical Services Enclosures: Figure 1: Proposed Improvement Alignment Figure 2: Proposed Boring Location Itemized Geotechnical Fee Estimate Project ProposalEstimates – ▇▇▇▇▇▇▇▇▇▇ Road NORTH Notes: W Sycamore Road Improvements Borings B-1 through B-5 are 15-ft. deep Total Depth = 75-ft Guidelines: Fort Bend County Project: Cartwright Pavement Replacement & Drainage Improvements, Fort Bend County, Texas Proposal No.: GP2020GP21-0710 W Sycamore Road (From S. Post Oak to S Curve at Edgewood Trail) ATL Proposal No0417 Cartwright Pavement Replacement & Drianage improvements ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇. GP2020▇▇▇▇▇▇-0710 August 19▇▇▇▇ April 30, 2020 2021 Borings: 5@15', [75 LF] Mobilization/Demobilization (Truck Rig) 1 LS $500.00 $500.00 Technician for Staking, Utilities Clearance, Coordination 8 4 hrs. $50.00 $400.00 200.00 Soil Drilling and Sampling (continuous; <50') 90 75 ft. $21.00 $1,890.00 1,575.00 Soil Drilling and Sampling (continuous; >50') 0 ft. $24.00 $0.00 Soil Drilling and Sampling (<50' intermittent) 0 ft. $18.00 $0.00 Soil Drilling and Sampling (intermittent; over 50' ) 0 ft. $21.00 $0.00 Grouting Holes 90 75 ft. $7.00 $630.00 525.00 Piezometer Installation 0 ft. $16.00 $0.00 Piezometer Abandonment 0 ft. $14.00 $0.00 24-Hour, 7- and 30-day PZ Water Level Readings 0 hrs. $50.00 $0.00 Vehicle Charge 8 0 hrs. $10.00 $80.00 0.00 Mobilization/Demobilization (ATVrig), Surcharge 0 LS $132.00 $0.00 Soil Drilling and Sampling (Surcharge for drilling using ATV rig) 0 ft. $6.00 $0.00 Pavement Coring and Patching (up to 6 inches thick) 6 5 ea. $150.00 90.00 $900.00 450.00 Pavement Coring and Patching (>6 inches thick) 36 6 in. $9.00 $324.00 54.00 $4,724.00 Moisture Content (ASTM D-2216) 48 ea. $9.00 $432.00 Atterberg Limits (ASTM D-4318) 18 ea. $60.00 $1,080.00 Passing No. 200 Sieve (ASTM D-1140) 18 ea. $46.00 $828.00 Unconfined Compression (ASTM D-2166) 6 ea. $44.00 $264.00 Unconsolidated-Undrained Triaxial Test (ASTM D-2850) 16 ea. $61.00 $976.00 SUBTOTAL $3,580.00 Senior Engineer-Project Manager (P.E.) 4 hrs. $150.00 $600.00 Project Engineer (P.E.) 16 hrs. $105.00 $1,680.00 Civil Engineer 16 hrs. $83.00 $1,328.00 Draftsman 24 hrs. $60.00 $1,440.00 Word Processor 24 hrs. $60.00 $1,440.00 SUBTOTAL $6,488.003,304.00
Appears in 1 contract
Sources: Professional Services
Time Schedules. We estimated estimate that the fieldwork field work can be started shortly about one (1) week after authorization is received. The actual drilling work is expected to take about 1 week, assuming no delays in permission to access the sites. The laboratory testing will take approximately 1 to 2 weeks. Weather permitting, we anticipate submitting a draft report about 2 weeks after completion of all laboratory testing. A final report project schedule will be issued about 1 week after receiving your review commentsas follows: Facility Right of Way/Utility Clearance Field Exploration Laboratory Testing Engineering Total Preliminary recommendations will be submitted during the course of the exploration, if required to expedite design. Proposal No. P21-063 GEOTECH ENGINEERING AND TESTING We appreciate the opportunity to submit this proposal and look forward to being of service to you on this project. Formal acceptance of this proposal and our general conditions can be acknowledged by signing below and returning one copy for our files. Very truly yours, ASSOCIATED GEOTECH ENGINEERING AND TESTING LABORATORIES, INC. TBPE Registration Number F-001183 ▇▇▇▇▇ ▇. ▇▇▇▇▇▇▇▇, Ph.D.P.E., P.E. Director▇.▇▇, Geotechnical Services DFE, ▇.▇.▇.▇., ▇.FPA, F. ASCE Principal Engineer ACCEPTED BY: COMAPANY NAME: _ PRINTED NAME: DATE: Enclosures: Figure Site Vicinity Map – Plate 1 Plan of Borings – Plate 2 Cost Estimate – Plates 3 through 6 General Conditions Harris County Fee Schedule Copies Submitted: (1) ▇▇. ▇▇▇▇▇▇ ▇▇▇▇▇, P.E., CFM (1) DAE Proposal No. P21-063 GEOTECH ENGINEERING AND TESTING Project Alignment PROJECT: Proposed Improvement Alignment Figure 2: Proposed Boring Location Itemized Desktop Geologic Fault Study and Geotechnical Fee Estimate Exploration for Koeblen Road- Seg 1 Paving and Drainage Improvements FBC Project Proposal: W Sycamore Road Improvements No. 20107, Fort Bend County, Texas Proposal NoNORTH SCALE: NOT TO SCALE DATE: APRIL 2021 PROPOSAL NO.: GP202021-0710 W Sycamore Road (From S. Post Oak to S Curve at Edgewood Trail) ATL Proposal 063E PROJECT: Desktop Geologic Fault Study and Geotechnical Exploration for Koeblen Road- Seg 1 Paving and Drainage Improvements FBC Project No. GP202020107, Fort Bend County, Texas NORTH SCALE: NOT TO SCALE DATE: APRIL 2021 PROPOSAL NO.: 21-0710 August 19063E B-1 B-2 B-3 Project Alignment B-4 B-6 B-7 B-8 B-9 B-10 B-11 B-12 B-14 B-15 Estimated Cost Summary (Detailed) P21-063 1 Review of Existing Published Fault Maps by Staff Engineer 4 $460.00 2 Reporting 0.5 1 $217.50 Total: $677.50 3 Review of the scope of the work 4 2 2 $1,640.00 4 Coordinate with Client, 2020 Mobilization/in obtaining the updated information of the project 1 $115.00 5 Develop a Drilling Plan 1 $115.00 6 Staking the Fifteen (15) Borings in the Field 7 $805.00 7 Coordinate with Surveyors to Locate & Tie in Borings at Site 1 $115.00 8 Field Coordination during Drilling Including Utility Clearance, Texas One Call, and/or obtain drilling permission 8 $920.00 9 Mobilization / Demobilization LS 1 $700.00 $700.00 10 Drilling and Sampling Fifteen (Truck Rig15) Borings 11 Continous (0' - 20') LF 225 $25.00 $5,625.00 12 Daily Travel EA 1 LS $500.00 $500.00 Technician 13 Borehole Grouting FT 225 $12.00 $2,700.00 14 Technician, Logging Borings, Borehole cleaning and Water Level Reading 36 $1,980.00 15 Vehicle Charge (Boring staking, site visits during field coordination during drilling including utility clearance, Texas One Call etc., and borehole logging and grouting) HR 51 $12.00 $612.00 Subtotal $15,827.00 16 Assign Laboratory Tests, Looking at Soil Samples 4 $460.00 17 Data Reduction and Evaluation 1 $115.00 18 Water Content (all samples) EA 113 $11.00 $1,243.00 19 Liquid and Plastic Limits EA 23 $71.00 $1,633.00 20 Percent Passing #-200 Sieve EA 23 $55.00 $1,265.00 21 Torvane EA 113 $3.00 $339.00 22 Hand Penetrometer EA 113 $4.00 $452.00 23 Unconfined Compression EA 23 $51.00 $1,173.00 Subtotal $6,680.00 Plate 3 Estimated Cost Summary (Detailed) Desktop Geologic Fault Study and Geotechnical Study Koeblen Road Paving and Drainage Improvements P21-063 Date: April 1, 2021 Billing Rate per Hour 24 Prepare Plan of Borings 1 $115.00 25 Analyze field and laboratory test results 2 $230.00 26 Prepare summary of laboratory test data 1 $115.00 27 Edit and prepare final boring log profiles 15 $1,725.00 28 Prepare and develop boring log profiles 1 $115.00 29 Develop concrete pavement design based on traffic loading 0.5 2 6 $1,225.00 30 Recommendations on undergraound utilities 1 5 $780.00 31 OSHA soil classification for Stakingthe trench safety and Trench Safety 3 6 $1,305.00 32 Document the results of soil exploration, Utilities Clearancelaboratory testing and geotechnical recommendations in a geotechnical draft report 4 10 32 $6,730.00 33 Responding to comments from HJ Consulting, Coordination 8 hrs. Inc. 1 2 4 $50.00 1,120.00 34 Technical Typing/Drafting 6 $400.00 Soil 420.00 35 Report Reproduction Allowance $300.00 Subtotal $14,180.00 Total: $36,687.00 36 Traffic Control (cost + 10%) DAY 3 $720.50 $2,161.50 Subtotal $2,161.50 47 Mobilization/Demobilization LS 1 $250.00 $250.00 48 Drilling and Sampling Surcharge FT 45 $10.00 $450.00 Subtotal $700.00 Plate 4 Grand Total: $40,226.00 Estimated Cost Summary (continuous; <50'Optional Detention Pond) 90 ft. P21-063 Date: April 1, 2021 Billing Rate per Hour 1 Review of the scope of the work (Scope meetings) 1 1 $21.00 320.00 2 Coordinate with Client, in obtaining the updated information of the project 1 $1,890.00 Soil 205.00 Subtotal $525.00 3 Develop a Drilling Plan 0.5 1 $217.50 4 Staking the Six (6) Boring in the Field 5 $575.00 5 Coordinate with Surveyors to Locate & Tie in Borings at Site 1 $115.00 6 Field Coordination during Drilling Including Utility Clearance, 1 4 $665.00 7 Mobilization / Demobilization LS 1 $700.00 $700.00 8 Drilling and Sampling Six (continuous; >506) Boring to 15-ft Depth 9 Technician, Borehole Logging, Clearing, Borehole Grouting 16 $880.00 10 Continous (0' - 15') 0 ft. LF 90 $24.00 25.00 $0.00 Soil Drilling and Sampling (<50' intermittent) 0 ft. $18.00 $0.00 Soil Drilling and Sampling (intermittent; over 50' ) 0 ft. $21.00 $0.00 Grouting Holes 90 ft. $7.00 $630.00 Piezometer Installation 0 ft. $16.00 $0.00 Piezometer Abandonment 0 ft. $14.00 $0.00 24-Hour, 7- and 30-day PZ Water Level Readings 0 hrs. $50.00 $0.00 2,250.00 11 Vehicle Charge 8 hrs. (Boring staking, site visits during field coordination during drilling including utility clearance, Texas One Call etc., and borehole logging) HR 24 $10.00 12.00 $80.00 Mobilization/Demobilization (ATVrig)288.00 12 Borehole Grouting FT 90 $12.00 $1,080.00 Subtotal $6,770.50 13 Assign Laboratory Tests, Surcharge 0 LS Looking at Soil Samples 1 2 $132.00 $0.00 Soil Drilling and Sampling (Surcharge for drilling using ATV rig) 0 ft. $6.00 $0.00 Pavement Coring and Patching (up to 6 inches thick) 6 ea. $150.00 $900.00 Pavement Coring and Patching (>6 inches thick) 36 in. $9.00 $324.00 $4,724.00 Moisture 435.00 14 Water Content (ASTM D-2216all samples) 48 ea. EA 45 $9.00 11.00 $432.00 Atterberg 495.00 15 Liquid and Plastic Limits (ASTM D-4318) 18 ea. EA 9 $60.00 71.00 $1,080.00 639.00 16 Percent Passing No. #200 Sieve (ASTM D-1140) EA 6 $55.00 $330.00 17 Sieve Analysis with Hydrometer EA 3 $145.00 $435.00 18 ea. Torvane EA 45 $46.00 3.00 $828.00 135.00 19 Hand Penetrometer EA 45 $4.00 $180.00 20 Unconfined Compression EA 9 $51.00 $459.00 Plate 5 Estimated Cost Summary (ASTM D-2166) 6 ea. Optional Detention Pond)Desktop Geologic Fault Study and Geotechnical Study Koeblen Road Paving and Drainage Improvements P21-036 Date: April 1, 2021 Billing Rate per Hour 21 Prepare Plan of Borings 1 $44.00 115.00 22 Analyze field and laboratory test results 2 $264.00 Unconsolidated-Undrained Triaxial Test (ASTM D-2850) 16 ea. 230.00 23 Prepare summary of laboratory test data 1 $61.00 115.00 24 Edit and prepare boring log profile 5 $976.00 SUBTOTAL $3,580.00 Senior Engineer-Project Manager (P.E.) 4 hrs. $150.00 $600.00 Project Engineer (P.E.) 16 hrs. $105.00 $1,680.00 Civil Engineer 16 hrs. $83.00 $1,328.00 Draftsman 24 hrs. $60.00 $1,440.00 Word Processor 24 hrs. $60.00 $1,440.00 SUBTOTAL $6,488.00575.00 Develop Geotechnical Recommendations
Appears in 1 contract
Sources: Professional Services
Time Schedules. We estimated that the fieldwork can be started shortly after authorization is received. The actual drilling work is expected to take about 1 week, assuming no delays in permission to access the sites. The laboratory testing will take approximately 1 to 2 weeks. Weather permitting, we anticipate submitting a draft report about 2 4 weeks after completion of all laboratory testing. A final report will be issued about 1 week after receiving your review comments. We appreciate the opportunity to submit this proposal and look forward to being of service to you on this project. Very truly yours, ASSOCIATED TESTING LABORATORIES, INC. ▇▇▇▇▇ ▇. ▇▇▇▇▇, Ph.D., P.E. Director, Geotechnical Services Enclosures: Figure 1: Proposed Improvement Alignment Figure 2: Proposed Boring Location Itemized Geotechnical Fee Estimate Project ProposalEstimates – ▇▇▇▇▇▇▇▇▇▇ Road NORTH Notes: W Sycamore Road Improvements Borings B-1 through B-5 are 15-ft. deep Total Depth = 75-ft Guidelines: Fort Bend County Project: ▇▇▇▇▇▇▇▇▇▇ Pavement Replacement & Drainage Improvements, Fort Bend County, Texas Proposal No.: GP2020GP21-0710 W Sycamore Road (From S. Post Oak to S Curve at Edgewood Trail) 0417 ▇▇▇▇▇▇▇▇▇▇ Pavement Replacement & Drianage improvements Fort Bend County, Texas ATL Proposal No. GP2020GP2021-0710 August 190417 April 30, 2020 2021 Borings: 5@15', [75 LF] Mobilization/Demobilization (Truck Rig) 1 LS $500.00 $500.00 Technician for Staking, Utilities Clearance, Coordination 8 4 hrs. $50.00 $400.00 200.00 Soil Drilling and Sampling (continuous; <50') 90 75 ft. $21.00 $1,890.00 1,575.00 Soil Drilling and Sampling (continuous; >50') 0 ft. $24.00 $0.00 Soil Drilling and Sampling (<50' intermittent) 0 ft. $18.00 $0.00 Soil Drilling and Sampling (intermittent; over 50' ) 0 ft. $21.00 $0.00 Grouting Holes 90 75 ft. $7.00 $630.00 525.00 Piezometer Installation 0 ft. $16.00 $0.00 Piezometer Abandonment 0 ft. $14.00 $0.00 24-Hour, 7- and 30-day PZ Water Level Readings 0 hrs. $50.00 $0.00 Vehicle Charge 8 0 hrs. $10.00 $80.00 0.00 Mobilization/Demobilization (ATVrig), Surcharge 0 LS $132.00 $0.00 Soil Drilling and Sampling (Surcharge for drilling using ATV rig) 0 ft. $6.00 $0.00 Pavement Coring and Patching (up to 6 inches thick) 6 5 ea. $150.00 90.00 $900.00 450.00 Pavement Coring and Patching (>6 inches thick) 36 6 in. $9.00 $324.00 54.00 $4,724.00 Moisture Content (ASTM D-2216) 48 ea. $9.00 $432.00 Atterberg Limits (ASTM D-4318) 18 ea. $60.00 $1,080.00 Passing No. 200 Sieve (ASTM D-1140) 18 ea. $46.00 $828.00 Unconfined Compression (ASTM D-2166) 6 ea. $44.00 $264.00 Unconsolidated-Undrained Triaxial Test (ASTM D-2850) 16 ea. $61.00 $976.00 SUBTOTAL $3,580.00 Senior Engineer-Project Manager (P.E.) 4 hrs. $150.00 $600.00 Project Engineer (P.E.) 16 hrs. $105.00 $1,680.00 Civil Engineer 16 hrs. $83.00 $1,328.00 Draftsman 24 hrs. $60.00 $1,440.00 Word Processor 24 hrs. $60.00 $1,440.00 SUBTOTAL $6,488.003,304.00
Appears in 1 contract
Sources: Professional Services