City Requirements Design, construction, materials, sizing, other specifications, permitting, inspections, testing, documentation and furnishing of as-built drawings, and acceptance of completed infrastructure shall be in accordance with City Requirements. Design and construction shall be by professionals licensed in the state of North Carolina to do the relevant work. City approval of the design of the Improvements shall be required prior to construction, as set forth in City Requirements. If Developer is connecting to the County sewer system, the City may require Developer to furnish the contract providing for such connection.
Quality Requirements Performance Indicator Heading Indicator (specific) Threshold Method of Measurement Frequency of monitoring Consequence of Breach
Accessibility Requirements Under Tex. Gov’t Code Chapter 2054, Subchapter M, and implementing rules of the Texas Department of Information Resources, the System Agency must procure Products and services that comply with the Accessibility Standards when those Products are available in the commercial marketplace or when those Products are developed in response to a procurement solicitation. Accordingly, Grantee must provide electronic and information resources and associated Product documentation and technical support that comply with the Accessibility Standards.
Safety Requirements Prior to setting sail the Operator of the Sector 43 Vessel shall detail and identify any vessel safety operating procedures and 44 other important information to the assigned ASM. The Sector Member 45 acknowledges that an ASM must complete a pre‐trip vessel safety checklist 46 as provided by NMFS prior to leaving port. An ASM cannot be deployed on 1 a vessel that has failed to review the safety issues, and such vessel is 2 prohibited from leaving port without the ASM on board (unless a waiver is 3 granted). For the safety of the vessels captain, crew and the ASM; the ASM 4 will not be allowed on deck any time that gear is being deployed. 5 6 The Sector and its Members note that each ASM must be provided with all 7 the equipment specified by the NEFOP. It is the responsibility of the 8 individual ASM and its employer to ensure that all equipment is in good
E-Verify Requirements To the extent applicable under ARIZ. REV. STAT. § 41- 4401, the Contractor and its subcontractors warrant compliance with all federal immigration laws and regulations that relate to their employees and their compliance with the E-verify requirements under ARIZ. REV. STAT. § 23-214(A). Contractor’s or its subcontractor’s failure to comply with such warranty shall be deemed a material breach of this Agreement and may result in the termination of this Agreement by the City.