Upgradings Sample Clauses

Upgradings. An upgrading is the reclassification of a position from one classification to another classification having a higher base salary range. Whenever an incumbent employee is upgraded as a result of such reclassification, pursuant to the Personnel Rules, such employee’s step placement in the new salary range shall be governed by the Article on “Promotions.”
Upgradings. When a person is temporarily assigned to a higher position, he/she shall be paid at the step he/she would be put into if he/she were appointed permanently. The upgraded pay will apply to hours actually spent in fulfilling the duties of the higher level position. Temporary assignments will be made for a minimum of four (4) hours.

Related to Upgradings

  • Upgrading You may request an Upgrade. For purposes of an Upgrade request, each individual who constitutes the Depositor under the agreement for Retail Direct Services is considered a required Signing Officer for purposes of acceptance of the Upgrade, and You agree to ensure that each such individual agrees to the Upgrade and accepts the terms of this Agreement before initiating the Upgrade request. Implementation of an Upgrade is subject to the approval of the Financial Institution. a) if Transactions under Direct Services for Small Business require two Signing Officers to authorize, a Signing Officer who has provided evidence of acceptance of this Agreement can view the Account using an Access Terminal, but cannot use Direct Services for Small Business as set out in this Agreement until at least one other required Signing Officer has evidenced their acceptance of this Agreement to Us; or b) if Transactions under Direct Services for Small Business require one Signing Officer to authorize, a Signing Officer who has provided evidence of acceptance of this Agreement can use Direct Services for Small Business as set out in this Agreement. When evidence of this Agreement being accepted by the required number of Signing Officers has been provided to Us, this Agreement will no longer be Provisionally Accepted, the Upgrade will be complete, and this article 3, Upgrading, will no longer apply. We may, in Our sole discretion, revert to the pre-Upgrade status if evidence of acceptance of this Agreement by all required Signing Officers is not provided in a timely manner as required.

  • Grading The coarse aggregate as delivered to the mixer, shall be well graded as per IS specifications. Maximum size of aggregate used for the work shall be 20mm or 40mm or as specified in items in the bill of quantities and it shall confirm to IS: 383-1970, clause 4.2 (Table-2) However, the exact gradation required to produce a dense concrete of specified strength and desired workability shall be decided as per laboratory test by the Engineer. Coarse aggregate for use in concrete shall be well graded and shall conform to IS: 383-1970 requirements (as per Table-II) given below: 63mm 100 - - - 40mm ▇▇-▇▇▇ ▇▇▇ - - 20mm ▇▇-▇▇ ▇▇-▇▇▇ 100 - 16mm - - ▇▇-▇▇▇ ▇▇▇ 12.5 - - - 90-100 10.00 ▇▇-▇▇ ▇▇-▇▇ ▇▇-▇▇ ▇▇-▇▇ 4.75mm 0-5 0-10 0-10 0-10

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2

  • Testing Landlord shall have the right to conduct annual tests of the Premises to determine whether any contamination of the Premises or the Project has occurred as a result of Tenant’s use. Tenant shall be required to pay the cost of such annual test of the Premises; provided, however, that if Tenant conducts its own tests of the Premises using third party contractors and test procedures acceptable to Landlord which tests are certified to Landlord, Landlord shall accept such tests in lieu of the annual tests to be paid for by Tenant. In addition, at any time, and from time to time, prior to the expiration or earlier termination of the Term, Landlord shall have the right to conduct appropriate tests of the Premises and the Project to determine if contamination has occurred as a result of Tenant’s use of the Premises. In connection with such testing, upon the request of Landlord, Tenant shall deliver to Landlord or its consultant such non-proprietary information concerning the use of Hazardous Materials in or about the Premises by Tenant or any Tenant Party. If contamination has occurred for which Tenant is liable under this Section 30, Tenant shall pay all costs to conduct such tests. If no such contamination is found, Landlord shall pay the costs of such tests (which shall not constitute an Operating Expense). Landlord shall provide Tenant with a copy of all third party, non-confidential reports and tests of the Premises made by or on behalf of Landlord during the Term without representation or warranty and subject to a confidentiality agreement. Tenant shall, at its sole cost and expense, promptly and satisfactorily remediate any environmental conditions identified by such testing in accordance with all Environmental Requirements. Landlord’s receipt of or satisfaction with any environmental assessment in no way waives any rights which Landlord may have against Tenant.

  • Installation When installation is required, the Contractor shall be responsible for placing and installing the Commodities or parts in the required locations at no additional charge. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the Commodity or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, tools, rigging, labor, and materials required to install or replace the Commodities or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.