WATER LINE Clause Samples

WATER LINE. What is a Covered Repair? What sections are covered? What is the maximum amount We will pay for Covered Repairs?
WATER LINE. Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all possible control as established or attained during preliminary survey, including but not limited to – section corners, property irons, intersection center-center irons, other set monuments; any necessary points for establishing BL, including P.I.’s in BL ▪ benchmarks, including TBM set with preliminary survey ▪ beginning and ends of pipe ▪ all P.I.’s/deflections (horizontal and vertical) ▪ FH’s, tees, bends, air release, valves
WATER LINE. Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following:  all possible control as established or attained during preliminary survey, including but not limited to – sec- tion corners, property irons, intersection center-center irons, other set monuments; any necessary points for establishing BL, including P.I.’s in BL  beginning and ends of pipe  all P.I.’s/deflections (horizontal and vertical)  FH’s, tees, bends, air release
WATER LINE. The vertical water line that serves a single Unit is a Limited Common Element to the Unit it serves.
WATER LINE. OD inch: Seawater - 1-1/2” Working pressure psi: 285 psi Connection type at burner end type: Suitable to connect to well test equipment Pressure gauge connection at barge end inch: Provided by well test company
WATER LINE. A requirement that Developer install a 16" water line. The Development only requires a 12" water line, but the Town has requested a 16" water line. The Town shall pay for the cost of the upsizing to 16", provided that Developer, prior to construction, shall obtain: a bid from its preferred contractor for construction and installation of the 12" water line; and a bid from its preferred contractor for construction and installation of the 16" water line. The fractional increase between the two bids shall be used to determine the Town's pro rata share of the actual costs to install the 16" water line.

Related to WATER LINE

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Parking Facilities Alamo Colleges District shall make the existing parking facilities at the rented Facility available for the vehicular traffic and parking necessitated by the Organization’s Use of the rented Facility, on a non-exclusive basis, as specified at Exhibit A. MAXIMUM CAPACITY. Organization anticipates approximately the number of participants stated at Exhibit A and agrees to inform Alamo Colleges District of any significant changes five (5) business days in advance of a Use. Organization shall not admit a larger number of persons than can safely and freely move about the Facility. Alamo Colleges District shall notify Organization of the recommended capacity of the Facility and all decisions of Alamo Colleges District concerning questions arising under this Paragraph shall be final.