WEATHER CLOSURE / SNOW AND ICE REMOVAL Sample Clauses

WEATHER CLOSURE / SNOW AND ICE REMOVAL. ‌ a) The term used for personnel required to work to perform required services during closures will be "Operational Needs" and may include personnel as assigned by their supervisor in the following units: • Facilities Services & Campus Development • Payroll • Information Technology ServicesMarketing and CommunicationsVIU Student Residence (VIUSR) • Deep Bay Marine Field Station An individual employee, which includes supervisors in the bargaining unit, may not elect assignment as “Operational Needs.” Any designations beyond the approved list above would require the University President or a Vice-President approval. b) Where the University specifically requires the services of individuals designated as "Operational Needs" personnel, and those individuals are unable to get to and from the University premises due solely to the extreme weather conditions, the University will either: i) Provide or arrange transportation to and from the University; or ii) Not require attendance at work under the "Operational Needs" designation. c) Compensation, in addition to the terms of the Collective Agreement, will be in the form of time off equivalent to the assigned regular hours to a maximum of the standard work day as per Article 14.02. d) The accumulated credits under the Operational Needs clause may be banked for utilization and this utilization will take place by the 31st day of August after they have been earned. However, if the accumulated time off is not utilized by August 31, payment in lieu will be processed. e) Additional compensation for all eligible employees who report for unscheduled call-out assignments shall be one (1) hour at their regular rate in addition to call- out pay for each day of unscheduled call-out for snow removal or other duties. Such compensation is to be claimed by the employee on the time sheet reporting the call-out. f) Telephone notification of any unscheduled call-out for snow removal or other duties will normally commence one (1) hour before the start time.

Related to WEATHER CLOSURE / SNOW AND ICE REMOVAL

  • Snow Removal Only the right of way will be plowed in the parking lots. Licensee is responsible for removing snow around his/her own vehicle (without causing damage or inconvenience to any other vehicles lawfully on the Premises).

  • Removals, Etc Without at least 30 days' prior written notice to the Administrative Agent, the Pledgor shall not (a) maintain any of its books and records with respect to the Collateral at any office or maintain its principal place of business at any place other than at the address indicated for the Pledgor in the Credit Agreement or (b) change its name, or the name under which it does business, from the name shown on the signature pages hereto.

  • Debris Removal a. We will pay your reasonable expense for the removal of: (1) Debris of covered property if a Peril Insured Against that applies to the damaged property causes the loss; or (2) Ash, dust or particles from a volcanic eruption that has caused direct loss to a building or property contained in a building. b. We will also pay your reasonable expense, up to $1,000, for the removal from the "residence premises" of: (1) Your trees felled by the peril of Windstorm or Hail or Weight of Ice, (2) A neighbor's trees felled by a Peril Insured Against under Coverage C; provided the trees: (3) Damage a covered structure; or (4) Do not damage a covered structure, but: (a) Block a driveway on the "residence premises" which prevents a "motor vehicle", that is registered for use on public roads or property, from entering or leaving the "residence premises"; or (b) Block a ramp or other fixture designed to assist a handicapped person to enter or leave the dwelling building.

  • Lane closure (i) The Contractor shall not close any lane of the Project Highway for undertaking maintenance works except with the prior written approval of the Authority’s Engineer. Such approval shall be sought by the Contractor through a written request to be made at least 10 (ten) days before the proposed closure of lane and shall be accompanied by particulars thereof. Within 5 (five) business days of receiving such request, the Authority’s Engineer shall grant permission with such modifications as it may deem necessary and a copy of such permission shall be sent to the Authority. (ii) Upon receiving the permission pursuant to Clause 14.5 (i), the Contractor shall be entitled to close the designated lane for the period specified therein, and for all lane closures extending a continuous period of 48 (forty-eight) hours, the Contractor shall, in the event of any delay in re-opening such lane, for every stretch of 250 (two hundred and fifty) metres, or part thereof, pay Damages to the Authority calculated at the rate of 0.1% (zero point one per cent) of the monthly maintenance payment for each day of delay until the lane has been re-opened for traffic. In the event of any delay in re-opening such lanes or in the event of emergency decommissioning and closure to traffic of the whole or any part of the Project Highway due to failure of the Contractor, the Contractor shall pay damages to the Authority at double the above rate, without prejudice the rights of the Authority under this Agreement including Termination thereof.

  • PLANT CLOSURE 29.01 In the event the Company closes the plant at the Cambridge location as a result of the loss of business or a discontinuation of all operations, severance pay will be calculated at one (1) week’s regular pay per year of service. The severance payment, so calculated, is inclusive of any severance payment required by the Ontario Employment Standards Act (Revised 2000). This agreement is not applicable to a sale of the business or if the closure is occasioned by a labour dispute.