Common use of Weight Control Clause in Contracts

Weight Control. Operator must comply with the pier/barge load restrictions detailed in the Halcrow Engineers, P.C. report entitled “Pier ▇, ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇, ▇▇” dated March 2008. Exhibit J set forth the maximum load per square foot for the decking/barge. The maximum single weight and skid or carriage therefore that may be accommodated thereon shall not cause stresses which are greater than normal design stresses for all elements of the decking nor cause lateral thrusts which will endanger the bulkhead wall inshore of the decking. Operator shall submit calculations for review and the load shall be approved by Agreement Administrator. Agreement Administrator may reduce the permitted load as structural and sub-structural conditions change as Agreement Administrator in its sole discretion shall determine, provided that if such reduction in permitted load materially interferes with Operator’s operation of the Heliport as Agreement Administrator in its sole discretion shall determine, then the parties shall negotiate in good faith a corresponding reduction in the Retention Payments.

Appears in 1 contract

Sources: Concession Agreement

Weight Control. Operator must comply with the pier/barge load restrictions detailed in the Halcrow Engineers, P.C. report entitled “Pier 6, ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇, ▇▇” dated March 2008. Exhibit J set forth the maximum load per square foot for the decking/barge. The maximum single weight and skid or carriage therefore that may be accommodated thereon shall not cause stresses which are greater than normal design stresses for all elements of the decking nor cause lateral thrusts which will endanger the bulkhead wall inshore of the decking. Operator shall submit calculations for review and the load shall be approved by Agreement Administrator. Agreement Administrator may reduce the permitted load as structural and sub-structural conditions change as Agreement Administrator in its sole discretion shall determine, provided that if such reduction in permitted load materially interferes with Operator’s operation of the Heliport as Agreement Administrator in its sole discretion shall determine, then the parties shall negotiate in good faith a corresponding reduction in the Retention Payments.

Appears in 1 contract

Sources: Concession Agreement (Saker Aviation Services, Inc.)