Work Package 1 Clause Samples

The 'Work Package 1' clause defines a specific set of tasks, deliverables, and responsibilities that are grouped together as the first phase or segment of a larger project. This clause typically outlines the scope of work, deadlines, and performance criteria for the initial package, and may include details such as milestones, reporting requirements, or resource allocations. By clearly delineating the expectations and boundaries for this portion of the project, the clause ensures that both parties understand their obligations and can track progress effectively, thereby reducing ambiguity and facilitating project management.
Work Package 1. 1.1. Assessment of locally produced aggregates’ properties in Latvia based on: 1.1.1. „Rail Baltica Design Guidelines. Railway Substructure Part 1, Embankments and Earthworks” (consolidated table with RB DG requirements are described in Annex A); 1.1.2. UIC 719R „Earthworks and track bed for railway lines“ (3rd edition, February 2008); 1.1.3. Three frost susceptibility criteria described in Annex B “Methods for assessing the frost susceptibility of soils”. 1.2. Detailed overview about the capabilities of local accredited laboratories which could conduct the tests according to the test methods described in this document.
Work Package 1. Use cases and security goals
Work Package 1. Human-in-the-Loop Machine Learning, Reasoning and Planning 1.1 Overall Summary for Work Package 1
Work Package 1. State-of-the-art
Work Package 1. Design and deliver advanced level qualitative training 3.2.1 Overall approach 3.2.2 Workshops
Work Package 1 

Related to Work Package 1

  • Work Schedule (A) Where an employee has an established schedule, a change in workdays or shifts will be posted no less than 14 calendar days in advance and will reflect at least a two workweek schedule; however, the state will make a good faith effort to reflect a one month schedule. (B) In the event of a declared emergency the notice requirement of this Section may be void. (C) The state will continue to observe the scheduling structures currently in place at each agency and agrees to bargain any change in the overall practice of how schedules are established.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.