Work to be done by the Clause Samples

The 'Work to be done by the' clause defines the specific tasks, responsibilities, or deliverables that a party is required to perform under the agreement. It typically outlines the scope of work, including deadlines, quality standards, and any relevant procedures or methods to be followed. By clearly specifying what is expected, this clause helps prevent misunderstandings and disputes about the obligations of each party, ensuring that all parties are aligned on the work to be completed.
Work to be done by the. Delivery Date
Work to be done by the. Delivery Date a) The supply of the goods shall include technical datasheets. b) All goods shall be packaged in a way that prohibits mechanical damage to components. c) Damaged goods as a result of Supplier’s fault shall be corrected at the Supplier’s cost.
Work to be done by the. Delivery Date a) Ensure that the delivered equipment is signed for. b) Supply Manager must send Visitor’s notification to security a day before and the Supplier must sign in, the materials department to escort the Supplier from the gate. c) Acceptance, off-loading and QC. d) If the spares delivered on site, to arrive with their relevant warrantee certificate from Siemens. e) All equipment / spares must be on time of required order date. f) Transported by road on supplier’s costs and transport. g) The Purchaser to acknowledge receipt of goods by stamping and signing the delivery note of the Supplier upon delivery, rejected items to be communicated after the official quality inspection is done on site by the end user of the spares rejected must be collected and the correct supplied within 7. days h) Only equipment specified will be accepted. Any spares that do not meet the specifications will be rejected. i) Acceptance, off-loading and QC.
Work to be done by the. Delivery Date 1. All ion exchange resin products must supplied in pallets of 25 or 50 litres bags and drums. 2. Deliver all ion exchange resin products in an open loaded truck to allow accessibility by the forklift during offloading. 3. The following documents shall be submitted to the Koeberg personnel upon arrival at the Koeberg Power Station: a) Ion exchange resin certificate of analysis and batch numbers. b) Delivery note, which must include the Eskom order number, the name of the power station and the power station address. Provide the technical data sheet (TDS) and safety data sheets (SDS) for each resin product supplied.

Related to Work to be done by the

  • TERMINATION BY THE CONTRACTOR If the Work is stopped for a period of thirty days under an order of any court or other public authority having jurisdiction, or as a result of an act of government, such as a declaration of a national emergency making materials unavailable, through no act or fault of the Contractor or a Subcontractor or their agents or employees or any other persons performing any of the Work under a contract with the Contractor, or if the Work should be stopped for a period of thirty days by the Contractor because the Architect has not issued a Certificate for Payment as provided in Paragraph 9.7 of these General Conditions or because the State has not made payment thereon as provided in Paragraph 9.7, then the Contractor may, upon seven additional days written notice to the State and the Architect, terminate the Contract and recover from the State payment for all Work executed and for any proven loss sustained upon any materials, equipment, tools, construction equipment and machinery, including reasonable profit and damages.

  • Termination by the HSP (a) The HSP may terminate this Agreement at any time, for any reason, upon giving 6 months’ Notice (or such shorter period as may be agreed by the HSP and the Funder) to the Funder provided that the Notice is accompanied by: satisfactory evidence that the HSP has taken all necessary actions to authorize the termination of this Agreement; and a Transition Plan, acceptable to the Funder, that indicates how the needs of the HSP’s clients will be met following the termination and how the transition of the clients to new service providers will be effected within the six-month Notice period. (b) In the event that the HSP fails to provide an acceptable Transition Plan, the Funder may reduce Funding payable to the HSP prior to termination of this Agreement to compensate the Funder for transition costs.

  • Documents to be Delivered by the Seller On the 2025-A Closing Date, the Seller will deliver such other documents as the Purchaser may reasonably request.

  • TERMINATION BY THE PARTIES This Agreement may be terminated upon sixty (60) days’ written notice (a) by the Independent Directors of the Company or the Advisor, without Cause and without penalty, (b) by the Advisor for Good Reason, or (c) by the Advisor upon a Change of Control. The provisions of Sections 19 through 31 of this Agreement shall survive termination of this Agreement.