Concurrent Delay definition

Concurrent Delay has the meaning provided in Section 4.4.2(a).
Concurrent Delay has the meaning given in clause 19.4 (“Suspension of obligations”).
Concurrent Delay means a situation where both City and Contractor are responsible for delays affecting the Critical Path where none of the delay events are utilizing available Project Float.

Examples of Concurrent Delay in a sentence

  • The Parties further acknowledge and agree that the damages for a Concurrent Delay are difficult or impossible to determine and that the damages calculated hereunder constitute a reasonable approximation of the harm or loss to Distribution Company as a result thereof.

  • Buyer shall be entitled to the remedies provided under the TSA with regard to any such Transmission Delay, and Seller shall have no liability to Buyer for Delay Damages solely as a result of any Owner Delay or Concurrent Delay (each as defined in the TSA).

  • A Concurrent Delay shall not affect Design-Builder’s right to a Completion Deadline adjustment hereunder.

  • The CMR may be allowed Days but the Department will have no liability for the following non- compensable items: .1 Abnormal or unusually severe weather; .2 Acts of God; .3 Force Majeure; .4 Concurrent Delay.

  • In the event of a Concurrent Delay, Design-Builder shall not be entitled to Delay Costs for the duration of the delay that is concurrent with a delay to the Critical Path for which Design-Builder is responsible.

  • By way of clarification, and not limitation, in no event shall the SI be entitled to Impact Costs attributable to a Concurrent Delay.

  • If the Consultant’s Work has been delayed pursuant to a Contemplated Delay and a separate delay also arises for all or a portion of the same period of time for which Consultant is not entitled to additional time (the “Concurrent Delay”), then the extension of time that Consultant would otherwise be entitled to as a result of the Contemplated Delay shall be reduced by the number of days that the Concurrent Delay exists during such Contemplated Delay.

  • Concurrent Delay Construction Cost Estimate Construction Cost Markup (or CM/GC Fee) Construction Documents Construction Pricing Documents Construction Provisions Construction Work Constructor A Principal Participant or Subcontractor that performs Construction Work for the Project.

  • SUBSTANTIAL COMPLETION DATE 33 13.1 Proposal and Baseline Schedules 33 13.2 Excusable Delays 34 13.3 Adjustment of Scheduled Substantial Completion Date 35 13.4 Force Majeure Events 36 13.5 Remedy for Concurrent Delay 36 13.6 Recovery Schedules.

  • In the event of a Concurrent Delay, Contractor shall not be entitled to Delay Costs for the duration of the delay that is concurrent with a delay to the Critical Path for which Contractor is responsible.


More Definitions of Concurrent Delay

Concurrent Delay is defined as the occurrence on a particular date of one or more instances of Owner Delay and Contractor Delay, Owner Delay and No-Fault Delay or Contractor Delay and No-Fault Delay.
Concurrent Delay has the meaning set out in Schedule 2 [General Conditions];
Concurrent Delay has the meaning assigned to it in Article 28.
Concurrent Delay is defined as a day on which the critical path of a Work Order Schedule is delayed and which delay is caused by both a Contractor Caused Delay and an Owner Responsible Delay.
Concurrent Delay means a delay caused by the occurrence of more than one unrelated event, each of which, independent of the other event(s), causes a delay to the then current critical path for completion of the Work or an Interface Milestone, without regard for which event occurred first in time, but only to the extent that the events overlap in time; and

Related to Concurrent Delay

  • Tenant Delay means an actual delay in the occurrence of the Substantial Completion Date or the Final Completion Date with respect to Landlord’s Work as the result of: (1) any unreasonable delay by Tenant in approving the Plans; (2) any request by Tenant that Landlord delay the commencement or completion of Landlord’s Work for any reason; (3) any request by Tenant to change the Plans after initial approval thereof by Tenant, or the making of any changes to Landlord’s Work requested by Tenant and agreed to by Landlord after initial approval of the Plans by Tenant; (4) any failure by Tenant to respond in writing within seven (7) business days after any written request by Landlord for clarification or interpretation of the Plans or for approval of changes in the Plans deemed necessary by Landlord; or (5) any other act or omission of Tenant or its officers, agents, employees or contractors; Notwithstanding the foregoing, no event shall be deemed to be a Tenant Delay until and unless Landlord has given Tenant written notice (the “Tenant Delay Notice”) advising Tenant (i) that a Tenant Delay is occurring, (ii) of the basis on which Landlord has determined that a Tenant Delay is occurring, and (iii) the actions which Landlord believes that Tenant must take to eliminate such Tenant Delay, and Tenant has failed to correct the Tenant Delay specified in the Tenant Delay Notice within forty-eight (48) hours following receipt thereof. No period of time prior to expiration of such 48-hour period shall be included in the period of time charged to Tenant pursuant to such Tenant Delay Notice if Tenant corrects the Tenant Delay specified in the Tenant Delay Notice within such 48-hour period.

  • Excusable Delay means a delay due to acts of God, governmental restrictions, stays, judgments, orders, decrees, enemy actions, civil commotion, fire, casualty, strikes, work stoppages, shortages of labor or materials or other causes beyond the reasonable control of Borrower, but lack of funds in and of itself shall not be deemed a cause beyond the control of Borrower.

  • Tenant Delays means (A) Tenant’s request for changes to Landlord’s Work, regardless of whether any such changes are performed, (B) construction of any such changes, (C) Tenant’s request for materials, finishes, or installations requiring unusually long lead times that were not originally included as a part of Landlord’s Work, (D) Tenant’s delay (which shall mean more than 5 business days) in reviewing, revising, or approving any plans and specifications relating to Landlord’s Work, (E) Tenant’s delay in providing information critical to the normal progression of the Project (Tenant shall provide such information as soon as reasonably possible, but in no event longer than 5 business days after receipt of any request for such information from Landlord), and (F) any other act or omission by Tenant or any Tenant Party (as defined herein), or persons employed by any of such persons, (iv) “Substantially Completed” means the substantial completion of Landlord’s Work (A) in a good and workmanlike manner, (B) in accordance with the requirements described in Exhibit C, and (C) in accordance with all applicable Legal Requirements (including, but not limited to, securing the applicable final building inspection for Landlord’s Work), subject only to normal “punch list” items, and (v) “Existing Tenant Delay” means the refusal or failure by the Existing Tenant (as defined below) to surrender the Premises by July 1, 2010 in accordance with the terms and conditions of the Existing Lease (as defined below). Landlord will promptly perform such punch list items. Tenant shall obtain, at its sole cost and expense, any applicable use and occupancy permit for the Premises issued by the applicable Governmental Authority. If Tenant does not elect to void this Lease within 5 business days of the lapse of such 60 day period, such right to void this Lease shall be waived and this Lease shall remain in full force and effect. If neither Landlord nor Tenant elects to void this Lease within 5 business days of the lapse of such 60 day period, such right to void this Lease shall be waived and this Lease shall remain in full force and effect. Sequoia Pharmaceuticals, Inc. (“Existing Tenant”), is currently leasing the Premises from Landlord, and the lease agreement (“Existing Lease”) between Landlord and Existing Tenant is scheduled to expire on July 1, 2010 subject to Landlord’s right to advance the expiration date. Tenant understands, acknowledges, and agrees that Landlord makes no guaranty, representation, or assurance that Landlord will be able to recapture the Premises from the Existing Tenant by July 1, 2010 and that Landlord shall have no obligation or duty to seek the vacation or removal of the Existing Tenant from the Premises.

  • Force Majeure Delay means with respect to the Servicer, any cause or event which is beyond the control and not due to the negligence of the Servicer, which delays, prevents or prohibits such Person’s delivery of the reports required to be delivered or the performance of any other duty or obligation of the Servicer under the Indenture, as the case may be, including, without limitation, computer, electrical and mechanical failures, acts of God or the elements and fire; provided, that no such cause or event shall be deemed to be a Force Majeure Delay unless the Servicer shall have given the Indenture Trustee written notice thereof as soon as practicable after the beginning of such delay.

  • Excusable Delays means delays due to acts of terrorism, acts of war or civil insurrection, strikes, riots, floods, earthquakes, fires, tornadoes, casualties, acts of God, labor disputes, governmental restrictions or priorities, embargoes, national or regional material shortages, failure to obtain regulatory approval from any Federal or State regulatory body, unforeseen site conditions, material litigation by parties other than the Parties not caused by the Parties’ failure to perform, or any other condition or circumstances beyond the reasonable or foreseeable control of the applicable party using reasonable diligence to overcome which prevents such party from performing its specific duties or obligation hereunder in a timely manner.