DER Connection Point definition

DER Connection Point means the point at which the DER Unit connects to the SPN Network;
DER Connection Point means the point at which the DER Unit connects to the SPEN Network; "DER Technical Requirements Document" provides the standard technical requirements for the connection of Distributed Energy Resources (DER) in order to dispatch active and reactive power services to National Grid as part of the Power Potential project trial. It covers functional and non-functional requirements.

Examples of DER Connection Point in a sentence

  • Response will be measured at the DER Connection Point of the Provider’s site.

  • The Reactive service is initiated by the DERMS issuing instructions to DER at the start of each Service Window for which DER was contracted, to change its operating mode (where necessary): for a non-synchronous contracted DER unit, to operate in voltage droop control mode; or for a synchronous contracted DER unit, to operate in voltage control mode When in these control modes, DER will automatically respond to voltage changes measured at the DER Connection Point.

  • Initially, the voltage set-point will match the measure voltage at the DER Connection Point at the time of arming.

Related to DER Connection Point

  • Inter-connection Point means interface point of renewable energy generating facility with the transmission system or distribution system, as the case may be:

  • Connection Point means an exit point or an entry point or a bidirectional point identified or to be identified as such in an access contract.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Demarcation Point The Demarcation Point shall have the meaning set forth in 47 Digital Subscriber Line Access Multiplexer (DSLAM): Equipment that links End User xDSL connections to a single packet switch, typically ATM or IP. Direct Trunked Transport (DTT): A DS1 or DS3 interoffice facility that connects the CenturyLink Serving Wire Center of the CLEC’s Local Interconnection Entrance Facility or Collocation to the terminating CenturyLink Tandem or End Office used exclusively for the transmission and routing of Telephone Exchange Service and Exchange Access.