Fixed Limit of Construction Cost definition

Fixed Limit of Construction Cost shall set forth a dollar amount available for the total Construction Cost of all elements of the Work as specified by the Principal Representative.
Fixed Limit of Construction Cost or “FLCC” means the total amount to be paid by the Political Subdivision or any Third-Party Lessor to Contractor for Contractor’s satisfactory performance, construction, and installation of all elements of the Work, which shall include, but not be limited to, costs and expenses, permits, performance bonds, materials, labor, auditing, IGA, design, engineering, project construction management costs, commissioning, training, profit, travel expenses, communications, code work, including review, inspection, and compliance unless otherwise noted, acquisition and installation of Equipment. The Fixed Limit of Construction Cost is included as a part of the MCP and all costs comprising the Fixed Limit of Construction Cost shall be identified in Schedule F, which shall be executed after this Contract is effective. The Fixed Limit of Construction Cost does not include any Contingency Funds or the M&V Fee.
Fixed Limit of Construction Cost. The amount that has been designated as the maximum amount for the construction cost of the Project.

Examples of Fixed Limit of Construction Cost in a sentence

  • In addition, these detailed costs estimates although prepared in the format of CSI division and subdivision, shall also be presented to the Owner in the above listed document packages and also subdivided in the Construction Manager bid package format prior to going out for bid with the first bid package, and shall comply with the Fixed Limit of Construction Cost included herein and with each separate component of the Fixed Limit of Construction Cost.

  • In accordance with Section 3.8.4, the Construction Manager shall promptly advise the Owner and the Design Professional if there are indications that the Fixed Limit of Construction Cost will not be met and make recommendations in accordance with Value Engineering procedures to reduce excess costs as detailed in Section 3.5.

  • The Fixed Limit of Construction Cost, referred to hereinafter as the FLCC, is the total dollar value of the sum of the project's anticipated base bid.

  • The sum, established by the Owner, as available for the entire Project, including but not limited to the construction budget (Fixed Limit of Construction Cost (“FLCC”)), land costs, costs of furniture, fixtures and equipment (FF&E), financing costs, compensation for all professional services, costs of Owner- furnished goods and services, contingency allowances and other similar established or estimated costs.

  • The Fixed Limit of Construction Cost, referred to hereinafter as the FLCC, is the total dollar value of the sum of the project's anticipated base bid (the project's essential scope) including design contingency.

  • The sum, established by the Owner, as available for the entire Project, including but not limited to the construction budget (Fixed Limit of Construction Cost (“FLCC”)), land costs, costs of furniture, fixtures and equipment (FF&E), financing costs, compensation for all professional services, costs of Owner-furnished goods and services, contingency allowances and other similar established or estimated costs.

  • The Design Professional will, as part of its Basic Services hereunder, include “alternates” to provide a mechanism to adjust Construction Cost so that they remain within the Fixed Limit of Construction Cost; provided, however, that such alternates will not compromise the Owner’s program for the Project.

  • In performing its design services, the Design Professional will use its best efforts to design the Project in a manner that has Construction Cost fall within the Fixed Limit of Construction Cost.

  • RESPONSIBILITY FOR CONSTRUCTION COST 17 7.1 Fixed Limit of Construction Cost 17 7.2 Action if the Fixed Limit of Construction Cost is Exceeded.

  • Nothing contained in this Agreement shall otherwise relieve the Architect/Engineer from the responsibility of providing the services required to keep the Project within the Fixed Limit of Construction Cost for the Project.


More Definitions of Fixed Limit of Construction Cost

Fixed Limit of Construction Cost shall set forth a dollar amount available for the total Construction Cost of all elements of the Work as specified by the Principal Representative. Incident The term ‘incident’ means any accidental or deliberate event that results in or constitutes an imminent threat of the unauthorized access, loss, disclosure, modification, disruption, or destruction of any communications or information resources of the State, which are included as part of the Work, as described in §§24-37.5-401, et seq., C.R.S. Incidents include, without limitation, (i) successful attempts to gain unauthorized access to a State system or State Records regardless of where such information is located; (ii) unwanted disruption or denial of service; (iii) the unauthorized use of a State system for the processing or storage of data; or (iv) changes to State system hardware, firmware, or software characteristics without the State’s knowledge, instruction, or consent. Notice

Related to Fixed Limit of Construction Cost

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.