Site Acceptance Testing definition
Examples of Site Acceptance Testing in a sentence
The Products shall be deemed finally accepted upon delivery unless the Quotation specifies acceptance based on successful Site Acceptance Testing (SAT).
Buyer has been presented the opportunity to purchase Site Acceptance Testing for ksep® Equipment Only.
Mandatory testing for this system includes Site Acceptance Testing (SAT) for the EDS following installation; pre-Integrated Site Acceptance Testing following the integration of the EDS units with the BHS is affirmed through a Test Readiness Report (TRR); and Integrated Site Acceptance Testing (ISAT) is conducted prior to TSA acceptance of the PROJECT for operational use.
Project Support Go Live 1 Contract Award 100% $ 266,216.00 2 Design/Interface Documents Complete 30% 0% $ 114,925.20 3 GIS Modeling Complete 20% 0% $ 76,616.80 4 Factory Acceptance Test 10% 0% $ 38,308.40 5 Completion of Site Acceptance Testing 20% 0% $ 76,616.80 6 Project Complete 20% 0% $ 76,616.80 Total $ 649,300.00 This milestone shall be considered complete and payable when Fort ▇▇▇▇▇▇▇ and ACS have completed the Task Order.
Completion of FAT with no category 1 problems and agreement on the list of category 2 problems together with an agreed resolution schedule shall be a prerequisite to commencement of Site Acceptance Testing (SAT).
System Test and Integration Plans (to include) o Factory Acceptance Testing o Interface Integration – Testing with Ole o System Integration End to End – Testing with Ole o Site Acceptance Testing o Operational User Acceptance Testing o Pre Go Live Acceptance Testing o Business Readiness Testing 3.
After the First Handover Date, Powerlink and the Owner must undertake Site Acceptance Testing of the Owner Assets in accordance with the Delivery Specification.
Site Acceptance Testing (SAT) specifications will be mutually defined and agreed upon within 30 days of final design.
Site Acceptance Testing (SAT) Prior to commencing inspection and testing at site the Contractor shall submit a Site Acceptance Testing (SAT) document to the Supervisor for approval not less than two weeks before such tests are due to take place and have completed a full pre-commissioning test himself.
As per Schindler design The Contractor is required to conduct the necessary Factory Acceptance Testing (FAT) and Site Acceptance Testing (SIT) of the Plant.