Task 7 definition

Task 7. Provide additional Departmental training and support as required.
Task 7. This task represents the completion of the draft plan including specific implementation actions, and circulating the draft plan for review by county staff as well as a presentation to the Ventura County Board of Supervisors and passage of a resolution of acceptance.

Examples of Task 7 in a sentence

  • The results of this effort will be summarized and provided to Key West Transit staff for review and comment; it later will be provided to the project management team for consideration as part of Technical Memorandum No. 3, to be prepared under Task 7.

  • Deliverables (by Subconsultant): • Preliminary Electrical Design and Details • Electrical Engineers Estimate of Probable Cost to Construct Task 7 90% PS&E • 90% of PS&E will be based on City review comments on the 60% submittal.

  • The results of this effort will be summarized and provided to Key West Transit staff for review and comment; it later will be provided to the project management team for consideration as part of Technical Memorandum No. 3, to be prepared in Task 7.

  • For services performed in accordance with the provisions of this AGREEMENT, the DEPARTMENT shall reimburse the LOCALITY for all reasonable and necessary costs incurred by the LOCALITY to complete the Scope of Work, Attachment A, and approved by the DEPARTMENT pursuant to Task 7.


More Definitions of Task 7

Task 7. TECHNOECONOMIC
Task 7. As-Built" Record Drawings and Record DocumenJs. With Approval of a Public Works Contract for SouthBoundary Road by the FORABoard, Whitscfn Engineers shall compile and prepare 'as­ built' documents and a signed set of Record Dra ings (per,Contractor ▇▇▇▇-ups and plan revisions) of the project as reproducible drawings (mylar) and as an elect,r6nic file (PDF) in AutoCAD format such as DXF or DWG. Compile project Designs, RFI's, Change Orders, and other project documents and provide to FORA in an electronically accessible fonnat (preferable PDF).
Task 7. On-line implementation and marketing Task 8: Conduct Workshops
Task 7. Administrative Final EIS/EIR
Task 7. Main Street & ▇▇▇▇▇ Heights Drive $26,800 – Lump Sum
Task 7. Drug Product Engineering Run